BCDEFGHIJKLMNOPQRSTUVWXYZ
1
Summary of LGEIN QPA Audit Findings (2023)
2
3
NoMonth QPAProcessIssueImageImprovementImagePoint CheckApplyRemark
4
5
1FebManagement of SMT materialWarehouse humidity NG, no history recorded for f/up action- Make Workflow for T/H monitoring
- Add control sheet beside monitoring display
Pastikan ada history monitoring AC
6
2MaySolder pastaNG, temperature not controlled well
Call vendor to repair temperature controller to be functional
Pastikan temperatur dalam dan luar sesuaiSudah tidak ada lagi temperature yang diletakkan didalam kulkas (Hanya kontrol temperature diluar)
7
3JulyManagement of SMT material NG, silica gel not available in PCB vaccum
Make a patrol check sheet and appoint the related PIC- Pastikan revacuum PCB ada silica gel dan vacuum dalam keadaan baik
- C/s tersedia
8
4AugMaterial
NG. PCB not vacuumed enough
Merubah sealing time dari 4 sec -> 5 sec
Pastikan PCB tervacuum dengan baik
Pastikan sealing time 5 sec
9
5OctMaterialThere's no Stock Card at some P/N- Delete storage space for components that do not have a long-term (more than 6 months) receipt history or for which the receipt plan has not been confirmed.
- Material patrol : 4/time per shift
- Securing material rack space through periodic inspection (1 time/month)
- Quality patrol :1 time/3 week
Pastikan stock card tersedia pada rak dan p/n masih dipakai. Dan jika p/n yang sudah lama kosong selama 6 bulan harus segera diganti dengan p/n lain
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100