| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Autonumber | category | Contents | Airtable Field Type | Example of check content | |||||||||||||||||||||
2 | 1 | Management Support | Attach the contract | Attachment | excel | |||||||||||||||||||||
3 | 2 | Management Support | Project Financial Analysis | Attachment | excel | |||||||||||||||||||||
4 | 3 | DataBasic Information | Modeling image | Attachment | 8000 won | |||||||||||||||||||||
5 | 4 | DataBasic Information | Output Image | Attachment | O,X | |||||||||||||||||||||
6 | 5 | DataBasic Information | Thickness - Less than 1 mm section image | Attachment | image | |||||||||||||||||||||
7 | 6 | DataBasic Information | Thickness - 30mm or more Solid section image | Attachment | image | |||||||||||||||||||||
8 | 7 | Printability Analysis | Image before applying 3D modeling optimization | Attachment | image | |||||||||||||||||||||
9 | 8 | Printability Analysis | Image after applying 3D modeling optimization | Attachment | image | |||||||||||||||||||||
10 | 9 | Printability Analysis | Resin outlet image | Attachment | image | |||||||||||||||||||||
11 | 10 | Printability Analysis | Internal pattern image | Attachment | image | |||||||||||||||||||||
12 | 11 | Printability Analysis | No support zone 이미지 | Attachment | image | |||||||||||||||||||||
13 | 12 | Printability Analysis | Cross-sectional distribution graph | Attachment | image | |||||||||||||||||||||
14 | 13 | Printability Analysis | Image of a full bed placement | Attachment | image | |||||||||||||||||||||
15 | 14 | Project Basic Information | Paint Specification Image | Attachment | image | |||||||||||||||||||||
16 | 15 | Project Basic Information | Silk/Pad Printing Reference Image | Attachment | image | |||||||||||||||||||||
17 | 16 | feedback | Project Wrap-up | Attachment | ppt | |||||||||||||||||||||
18 | 17 | Post-workability analysis | Image of Barel | Attachment | image | |||||||||||||||||||||
19 | 18 | Management Support | Whether or not to write a contract | Checkbox | O,X | |||||||||||||||||||||
20 | 19 | DataBasic Information | Thickness - with or without a section less than 1 mm | Checkbox | O,X | |||||||||||||||||||||
21 | 20 | DataBasic Information | Thickness - 30mm or more with or without solid section | Checkbox | O,X | |||||||||||||||||||||
22 | 21 | marketing | Whether to use content marketing | Checkbox | O,X | |||||||||||||||||||||
23 | 22 | marketing | Whether the production process is recorded | Checkbox | O,X | |||||||||||||||||||||
24 | 23 | Assembly | Other parts and assembly | Checkbox | O,X | |||||||||||||||||||||
25 | 24 | Printability Analysis | Whether 3D modeling optimization is needed | Checkbox | O,X | |||||||||||||||||||||
26 | 25 | Printability Analysis | Hollow or not | Checkbox | O,X | |||||||||||||||||||||
27 | 26 | Printability Analysis | Shell Hollow 여부 | Checkbox | O,X | |||||||||||||||||||||
28 | 27 | Printability Analysis | Presence or absence of resin outlet | Checkbox | O,X | |||||||||||||||||||||
29 | 28 | Printability Analysis | Whether there is an internal pattern or not | Checkbox | O,X | |||||||||||||||||||||
30 | 29 | Printability Analysis | No support zone 유무 | Checkbox | O,X | |||||||||||||||||||||
31 | 30 | Printability Analysis | Z-comp application | Checkbox | O,X | |||||||||||||||||||||
32 | 31 | Factory Analysis | Washing - automatic cleaning or not | Checkbox | O,X | |||||||||||||||||||||
33 | 32 | Factory Analysis | Washing - Manual Cleaning or Not | Checkbox | O,X | |||||||||||||||||||||
34 | 33 | Factory Analysis | Washing - Keg build washing or not | Checkbox | O,X | |||||||||||||||||||||
35 | 34 | Factory Analysis | Whether to change the mass production option | Checkbox | O,X | |||||||||||||||||||||
36 | 35 | Packaging/Shipping Analysis | Packaging Required. | Checkbox | O,X | |||||||||||||||||||||
37 | 36 | Packaging/Shipping Analysis | Whether a part number list is required for each part | Checkbox | O,X | |||||||||||||||||||||
38 | 37 | Project Basic Information | Whether there is a mass production plan | Checkbox | O,X | |||||||||||||||||||||
39 | 38 | Project Basic Information | With or without paint | Checkbox | O,X | |||||||||||||||||||||
40 | 39 | Project Basic Information | Whether to outsource painting | Checkbox | O,X | |||||||||||||||||||||
41 | 40 | Project Basic Information | Silk/Pad Printing or Not | Checkbox | O,X | |||||||||||||||||||||
42 | 41 | Project Basic Information | Sample Proceeding or Not | Checkbox | O,X | |||||||||||||||||||||
43 | 42 | Post-workability analysis | Barel applies | Checkbox | O,X | |||||||||||||||||||||
44 | 43 | Post-workability analysis | Masking or not | Checkbox | O,X | |||||||||||||||||||||
45 | 44 | Management Support | Down payment date | Date | 45857 | |||||||||||||||||||||
46 | 45 | Management Support | Payment date | Date | 45857 | |||||||||||||||||||||
47 | 46 | Management Support | Balance payment date | Date | 45857 | |||||||||||||||||||||
48 | 47 | Customer Information | Inquiry Date | Date | 45857 | |||||||||||||||||||||
49 | 48 | Customer Information | Company Name | Link to another record | Museum | |||||||||||||||||||||
50 | 49 | Customer Information | Customer Name | Link to another record | Museum | |||||||||||||||||||||
51 | 50 | Customer Information | industry | Link to another record | culture | |||||||||||||||||||||
52 | 51 | Project Basic Information | Usage | Link to another record | Design Products | |||||||||||||||||||||
53 | 52 | Project Basic Information | Usage Environment | Link to another record | real life | |||||||||||||||||||||
54 | 53 | Printability Analysis | Full Support Features | Long text | ||||||||||||||||||||||
55 | 54 | Printability Analysis | Pool bed description | Long text | ||||||||||||||||||||||
56 | 55 | Factory Analysis | Cleanability feedback | Long text | ||||||||||||||||||||||
57 | 56 | Factory Analysis | Changes to the mass production option | Long text | ||||||||||||||||||||||
58 | 57 | Project Basic Information | Detailed Description | Long text | ||||||||||||||||||||||
59 | 58 | Printability Analysis | Type of equipment used | Multiple select | GC660 / GS550 / GS660 / GS860 / GS1080 | |||||||||||||||||||||
60 | 59 | Customer Information | Sales | Number | 21.2 billion | |||||||||||||||||||||
61 | 60 | Customer Information | Number of Employees | Number | 72 people | |||||||||||||||||||||
62 | 61 | DataBasic Information | Total number of data | Number | 4 | |||||||||||||||||||||
63 | 62 | DataBasic Information | X-axis length | Number | 50mm | |||||||||||||||||||||
64 | 63 | DataBasic Information | Y-axis length | Number | 70mm | |||||||||||||||||||||
65 | 64 | DataBasic Information | Z-axis length | Number | 280mm | |||||||||||||||||||||
66 | 65 | DataBasic Information | Bounding Box Total | Number | 400mm | |||||||||||||||||||||
67 | 66 | DataBasic Information | Data volume | Number | 100㎤ | |||||||||||||||||||||
68 | 67 | DataBasic Information | Scale Quotation | Number | ||||||||||||||||||||||
69 | 68 | DataBasic Information | Basic Quote(500) | Number | ||||||||||||||||||||||
70 | 69 | DataBasic Information | Mass Production Estimates(400) | Number | ||||||||||||||||||||||
71 | 70 | Assembly | Tolerances applied to modeling | Number | 0.1mm | |||||||||||||||||||||
72 | 71 | Printability Analysis | Optimal mass production angle - X | Number | 30 degrees | |||||||||||||||||||||
73 | 72 | Printability Analysis | Optimal Sunshade Angle - Y | Number | 45 degrees | |||||||||||||||||||||
74 | 73 | Printability Analysis | Optimal production angle - Z | Number | 60 degrees | |||||||||||||||||||||
75 | 80 | Factory Analysis | Total Builds | Number | 100 pieces | |||||||||||||||||||||
76 | 81 | Factory Analysis | Total Successful Builds | Number | 80 pcs | |||||||||||||||||||||
77 | 82 | Factory Analysis | Total Failed Builds | Number | 20 pcs | |||||||||||||||||||||
78 | 84 | Project Basic Information | Quantity Required | Number | 2000 | |||||||||||||||||||||
79 | 88 | Customer Information | Main Projects | Single line text | - | |||||||||||||||||||||
80 | 89 | Printability Analysis | Explanation of the optimal mass production angle | Single line text | ||||||||||||||||||||||
81 | 91 | Project Basic Information | One line summary | Single line text | Commercialized products commemorating the 80th anniversary of the liberation of the Ban Ga Sa Yu Prize | |||||||||||||||||||||
82 | 93 | Management Support | Payout terms | Single select | 1) Lump sum payment 2) Down payment, balance 3) Down payment, middle payment, balance | |||||||||||||||||||||
83 | 94 | Factory Analysis | Cleaning Difficulty Rating | Single select | Divide S~C grades. (Step 4, S: Full automatic washing A: Kell build washing B: Some automatic, some manual washing C: Full manual washing) | |||||||||||||||||||||
84 | 95 | Packaging/Shipping Analysis | Shipping method | Single select | Quick, cash on delivery, home delivery | |||||||||||||||||||||
85 | 96 | Project Basic Information | One-time/periodic | Single select | periodicity | |||||||||||||||||||||
86 | 98 | Post-workability analysis | Surface Treatment | Single select | Grade 5: No supporter removal (N) / Grade 4: Supporter only removed (N) / Grade 3: Basic post-processing (~220 rooms, general outsourcing) (B) / Grade 2: Basic post-processing (~Sponge M,F, outsourcing where the surface must be smooth) (F) / Grade 1: Surface treatment for painting (sponge SF, UF) (U) | |||||||||||||||||||||
87 | 101 | Post-workability analysis | Supporter Removal Difficulty Rating | Single select | Divide S~C grades. (Step 4, Divide by Time) | |||||||||||||||||||||
88 | 102 | marketing | Documenting the production process | URL | ||||||||||||||||||||||
89 | 103 | marketing | Quality Satisfaction Survey | URL | ||||||||||||||||||||||
90 | 104 | Printability Analysis | Full production plan | URL | ||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 |