ACDEFGHIJKLMNOPQRSTUVWXYZ
1
Project:
2
Originated By:
3
Reviewed By:
4
Approved By:
5
Stage:1
6
DeliverableReferencesSelect (DBM)Define (EDS)Detailed EngineeringExecute
7
Requirements
Status
RemarksRequirementsStatusRemarksRequirements
Status
RemarksRequirements
Status
Remarks
8
Process
9
Basis of Design (BOD)IFDAOC scopeIFDAOC scope, update only
10
Battery Limit Table0000-TPL-PE-0009Covered in DBM documentIFDIFC
11
Block Flow Diagram (BFD)IFRIFD
12
Catalyst and Chemical RequirementsIFRIdentification onlyIFDIFDUpdate
13
Emissions and Effluent SummaryIFRIFAIFA
14
Equipment Sizing ReportIFRCalculations and NarrativeIFACalculations and NarrativeIFDUpdate
15
Flare System SimulationIFNAspen Flare System Analyzer V7.2IFN
Aspen Flare System Analyzer V7.2
16
Flare, Relief and Vent ReportIFAIncludes flare load and relief summary tablesIFDUpdate
17
Hazard AssessmentBased on plot plan and PFD
18
HAZOP Action/Parking Lot Close Out Report0000-GUI-PE-0001IFAIFDIFDAs required
19
HAZOP Review0000-GUI-PE-0001Excludes vendor packages
Vendor packages and BOP updates
20
Hydraulic Analysis/CalculationsIFRMajor piping and pipelines onlyIFDIFD
21
Line Sizing Summary Table0000-TPL-PE-0006IFDIFDUpdate
22
Mass & Energy Balance (M&EB)0000-TPL-PE-0002IFRIFDIFDUpdate
23
Material Selection Process Input Table0000-TPL-PE-0005IFDRequired for Material Selection ReportIFDUpdate
24
Piping & Instrumentation Diagrams (P&ID)0000-TPL-PE-0007IFDLead Sheets provided by AOCIFCIFAB
25
Process DescriptionIFRIFA
26
Process Flow Diagrams (PFD)IFRIncludes utility systemsIFDIncludes utility systemsIFDUpdate
27
Process SimulationIFNHYSYS V7.2 Build 7263IFNHYSYS V7.2 Build 7263IFNHYSYS V7.2 Build 7263
28
Relief Valve Sizing CalculationsIFDIFC
29
Utility Balances0000-TPL-PE-0003IFRIFDIFDUpdate
30
Piping / Pipeline
31
Development Area PlanIFRIFDIFC
32
Heat Tracing Schedules and General ArrangementsIFC
33
Hydro Test PlanIFAIFD
34
Isometric DrawingsIFC
35
Line Designation Table (LDT)0000-TPL-PE-0001IFDIFCIFAB
36
Pipeline Alignment DrawingsIFDIFCIFAB
37
Pipeline Bend ScheduleIFDIFC
38
Pipeline Crossing Plan (incl. drawings and crossing list)
IFRIFDIFC
39
Pipeline Elevation/Profile DrawingsIFDIFCIFAB
40
Pipeline Loop DetailIFRTypicalIFDIFC
41
Pipeline Material Take-off (MTO)IFELength, diameter, crossingsIFEIFE
42
Pipeline ROW Cross-sectionIFRIFDIFC
43
Pipeline Shoe DrawingsIFDTypicalsIFC
44
Pipeline Specifications (CSA)IFDAs requiredIFC
45
Pipeline Summary Map/TableIFRIFDIFDUpdateIFAB
46
Piping Material Take-off (MTO)IFEIFE
47
Plot PlanIFRIFDIFCIFAB
48
Stress AnalysisIFAIdentification of lines to be analyzedIFD
49
Tie-in List0000-TPL-PE-0008IFDIFCIFAB
50
3-D Model - 30%IFAPrimarily used for MTO purposesIFDUpdate
51
3-D Model - 60%IFD
52
3-D Model - 90%IFCUpdated as changes made
53
Mechanical
54
Equipment and Material RequisitionIFDLong lead itemsIFD
55
Equipment Data SheetsIFRMajor Equip., process data onlyIFDIFC
Includes HVAC and specialty items
IFAB
56
Equipment List0000-TPL-ME-0001IFRMajor equipment onlyIFDIFDIFAB
57
HVAC DrawingsIFC
58
Long Lead Items List (i.e., purchased prior to sanction)
IFRIncludes instrumentationIFDIncludes instrumentation
59
Material Selection Diagrams (MSD)IFDIFDUpdate
60
Cathodic Protection PlanIFRIFA
61
Cathodic Protection DrawingsIFDIFC
62
Material Selection ReportIFRSummary to support estimateIFDIFDUpdate
63
Speciality Items List0000-TPL-ME-0002IFDIFDUpdateIFAB
64
Civil / Structural
65
Berm, Pond and Drainage DrawingsIFDIFCIFAB
66
Building ListIFRMajor buildings onlyIFDIFD
67
Civil Material Take-off (MTO)IFR
Preliminary for Class 4 cost estimate
IFEIFE
68
Earthwork ModelIFNIFN
69
Foundation / Pile Layout DrawingsIFDIFCIFABPile layout drawings only
70
Geotechnical InvestigationIFRFor site selectionIFAFollow-up as required
71
Pit and Sump DrawingsIFNTypicals onlyIFC
72
Road Plan / Profile DrawingsIFR
Preliminary for Class 4 cost estimate
IFDPreliminaryIFCIFAB
73
Survey Plan / DrawingsPreliminary sketch plansLegal surveyUpdateIFAB
74
Site Clearing, Grading and Drainage PlanIFR
Preliminary for Class 4 cost estimate
IFDIFCIFAB
75
Structural Drawings (including Pipe supports)IFNTypicals onlyIFC
76
Structural Material Take-off (MTO)IFE
Preliminary steel quantities for the Class 3 estimate
IFE
77
Structural ModelIFN
78
Electrical
79
Area Classification DrawingIFDIncludes area classification worksheetIFCIFAB
80
Cables SchedulesIFDPreliminary based on plot plansIFC
81
Control Equipment Layout in MCC'sIFDIFC
82
Electrical Equipment Data SheetsIFDMajor equipment onlyIFCIFAB
83
Electrical Equipment ListIFDIFDIFAB
84
Electrical Load ListIFREstimated total loadIFDIncludes standy-by loads and EHTIFDUpdateIFAB
85
Electrical Material Take-off (MTO)IFEIFE
86
Fugitive Emissions StudyIFARequired for Area Classification
87
I/O ListIFDIFCIFAB
88
MCC Building LayoutIFDIFC
89
Power System Study ReportIFRIFALoad flow, short circuit, motor starting
90
Single Line DiagramsIFDIFCIFAB
91
Typical LV Motor SchematicIFNIFN
92
Typical MV Motor SchematicIFNIFN
93
Instrumentation and Control
94
Control NarrativeIFDAOC scopeIFAB
95
Control PhilosophyIFRAOC scopeIFDAOC scope
96
Control System Engineering & DesignIFDAOC scope, estimates onlyIFDAOC scope
97
I&C Material Take-off (MTO)IFEIFE
98
I/O Assignment General & Packaged EquipmentIFCIncluding HVAC
99
Installation Detail DrawingsIFC
100
Instrument Data SheetsIFDPreliminaryIFCIFAB