| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Last Updated: | 11/04/2025 @ 9:15 PM | 2026 TENTATIVE AUCSC CLASS INDEX *Classes and instructors may change | |||||||||||||||||||||||
2 | Building Location Abbreviations: MRB (Mineral Resources Bldg - Bus Stop A); ESB (Engineering Sciences Bldg - Bus Stops A & B); AER (Advance Engineering Bldg - Bus Stop C); AS Annex (Ag Science Annex - Bus Stop D); AGR (Agricultural Sciences Bldg - Bus Stop C); EVC (Evansdale Crossing - Bus Stop A); NRC (National Research Center for Coal & Energy - Bus Stop B); SAS (South Ag. Science - Bus Stop C) | |||||||||||||||||||||||||
3 | Backup Rooms: ESB 209 (27); MRB 107 (30); AER 137 (60) - MRB 207 (59) being used by Pipeline Integrity and AER 135 (74) being used by Basic | |||||||||||||||||||||||||
4 | Monday 5/11/2026 | |||||||||||||||||||||||||
5 | 2:00 pm-6:00 pm | AMPP Corrosion Technician Exam - Review Session (Go to the AMPP website to schedule this exam at a date/time and location of your choosing - this exam is not given at AUCSC) | ||||||||||||||||||||||||
6 | Location | MRB 113; Bus Stop A | ||||||||||||||||||||||||
7 | Instructor | Bopinder "Bop" Phull | ||||||||||||||||||||||||
8 | ||||||||||||||||||||||||||
9 | 2:00 pm-4:00 pm | Outdoor Clinic | ||||||||||||||||||||||||
10 | Location | Mylan Center | ||||||||||||||||||||||||
11 | Instructor | Kulczyk, Girt, Peace, Crawford | ||||||||||||||||||||||||
12 | ||||||||||||||||||||||||||
13 | 6:00 pm-8:00 pm | Basic Electricity | ||||||||||||||||||||||||
14 | Location | MRB 113; Bus Stop A | ||||||||||||||||||||||||
15 | Instructor | Tim Perkins (alternate - Heather Groll) | ||||||||||||||||||||||||
16 | ||||||||||||||||||||||||||
17 | Tuesday 5/12/2026 | 8:00 am-8:45 am | General Assembly - Welcome by General Chairman, Tom Conner, Program and Schedule Changes, and Feature Slide Presentation | |||||||||||||||||||||||
18 | Location | Mylan Park Ruby Community Center | ||||||||||||||||||||||||
19 | Pick Your Course Track | Fundamentals (116) | Basic (324) | Intermediate (304) | Advanced (248) | Coatings (30) | Pipeline Integrity | Technology | Internal | System | Water & | Outdoor | What's New | |||||||||||||
20 | Management (59) | Today (70) | Corrosion (46) | Diagnostics (71) | Wastewater (30) | Workshop | (40) | |||||||||||||||||||
21 | Program Course Chairs | Bob Sperling | Bill Deaton | Kevin Roberts | T.J. Petrosky | Matt Errett | Dan Joseph | Kevin Groll | Derek Kostuck | Tyler Conley | Jacob Martin (Becky Andrus) | Jim Kulczyk | Steve Alberico | |||||||||||||
22 | Location | AGR G-06; Bus Stop C | SAS 1021; Bus Stop C | AER 135; Bus Stop C | MRB 113; Bus Stop A | EVC 414; Bus Stop A | ESB G39; Bus Stop A | ESB G102; Bus Stop A | MRB 109; Bus Stop A | ESB 207; Bus Stop A | ESB G-83; Bus Stop A | ESB G-84; Bus Stop A | ESB G-78B; Bus Stop A | MRB 105; Bus Stop A | AS Annex; Bus Stop D | MRB 205; Bus Stop A | ||||||||||
23 | Period 1 | 9:30 am-10:30 am | Pipeline | Basic Electricity | Basic Electricity | Corrosion Cells | Corrosion Cells | Stray Current | Stray Current | Fundamentals of | Pipeline Integrity | State of the Technology - | Introduction to | Troubleshooting Cathodic | Water Loss Prevention | Pipe & Cable Location | Cathodic Protection, | |||||||||
24 | Locating | (Part 1) | (Part 1) | in Action | in Action | Inteference Testing | Interference Testing | Pipeline Coatings | and Standards | GPS and UAVs | Internal Corrosion | Protection Rectifiers | Through An Effective | Buried Structures | Testing, Instruments, | |||||||||||
25 | (Part 1) | (Part 1) | (Part 1) | Corrosion Control Program | (Part 1) | & Coatings (Part 1) | ||||||||||||||||||||
26 | Monitor | |||||||||||||||||||||||||
27 | Instructor | Bradley Thomas | Heather Groll | Bopinder "Bop" Phull | Kurt Lawson | Dan Younkin | John Otto | Vince Dalchuk | Matt Errett | Lee Reynolds | Richard Hall | Tom Pickthall | CM Nelson | Michael Nordstrom | Reardon, Verga, Taylor | Open Showcase | ||||||||||
28 | Period 2 | 10:40 am-11:40 am | Bob Payne | |||||||||||||||||||||||
29 | Fundamentals of Corrosion | Basic Electricity | Basic Electricity | Installation of | Installation of | Stray Current | Stray Current | Coating Failures | Data | DC Coupons | Developing an Internal | Troubleshooting Cathodic | Stray Current and | Pipe & Cable Location | Cathodic Protection, | |||||||||||
30 | Mathematics and Electricity | (Part 2) | (Part 2) | Galvanic Anodes | Galvanic Anodes | Inteference Testing | Interference Testing | Case Histories | Integration | AC Coupons | Corrosion Program | Protection Rectifiers | Segmented Pipelines | Buried Structures | Testing, Instruments, | |||||||||||
31 | (Part 2) | (Part 2) | (Part 2) | (Part 2) | & Coatings (Part 2) | |||||||||||||||||||||
32 | Monitor | |||||||||||||||||||||||||
33 | Instructor | Katherine Parr | Heather Groll | Bopinder "Bop" Phull | Michael Nordstrom | Justin Haupt | John Otto | Vince Dalchuk | Greg Hardig | Elizabeth Nicholson | Mike Placzek | Chris Kagarise | CM Nelson | Allen Cox | Reardon, Verga, Taylor | Open Showcase | ||||||||||
34 | Exhibits | 11:00 am-1:00 pm | ||||||||||||||||||||||||
35 | EXHIBITS--Mylan Park Ruby Community Center | |||||||||||||||||||||||||
36 | ||||||||||||||||||||||||||
37 | ||||||||||||||||||||||||||
38 | Period 3 | 1:30 pm-2:30 pm | ||||||||||||||||||||||||
39 | Fundamentals | Corrosion | Corrosion | Installation of Impressed | Installation of Impressed | Materials for | Materials for | Fusion Bonded Epoxy | ECDA Indirect | Remote | Monitoring Techniques | Understanding the | Linings and Coatings | Impressed Current System | MORGANTOWN | |||||||||||
40 | of Corrosion | Fundamentals | Fundamentals | Current Cathodic | Current Cathodic | Cathodic | Cathodic | Coatings and Mill Inspection | Inspection Tools-CIS | Data | and Selection | Reference Cell | for Ductile Iron Pipe | Hands-On Work Shop | Much about | |||||||||||
41 | (Part 1) | (Part 1) | Protection Systems | Protection Systems | Protection | Protection | Techniques | Acquisition | (Part 1) | Morgantown | ||||||||||||||||
42 | Monitor | |||||||||||||||||||||||||
43 | Instructor | Heather Groll | Heath Hillard | Bopinder "Bop" Phull | Michael Roberts | Frank Greene | Geoff Rhodes | Tom Conner | C J Mason | Jim Walton | Jamey Hilleary | Jason Rine | Michael Baxter | Conor Madden | Kulczyk / Girt / Lapidus / Pawson | Dennis Carenza | ||||||||||
44 | Period 4 | 2:40 pm-3:40 pm | ||||||||||||||||||||||||
45 | Introduction to | Corrosion | Corrosion | Introduction | Introduction | Design of Impressed | Design of Impressed | Quality Control Instrumentation | ECDA Indirect Inspection | PHMSA | Field Sampling | Rectifier | Impressed Current System | RMU - Remote Monitoring | ||||||||||||
46 | Cathodic Protection | Fundamentals | Fundamentals | To Close | To Close | Current Cathodic | Current Cathodic | for Paint and and Coating Instruments | Tools-DCVG-ACVG Current | Program Overview | & Testing | Well Pad Considerations | Basics | Hands-On Work Shop | Roundtable | |||||||||||
47 | (Part 2) | (Part 2) | Interval Surveys | Interval Surveys | Protection Systems (Part 1) | Protection Systems (Part 1) | Attenuation (Part 1) | (Part 1) | (Part 2) | All RMU Vendors & Experts | ||||||||||||||||
48 | Monitor | |||||||||||||||||||||||||
49 | Instructor | Dan Younkin | Heath Hillard | Bopinder "Bop" Phull | Josh Brewer | Roy Fultineer | Tom Williams | Travis Talbott | Kimmer Cline | Jim Walton | Mary Friend | Jason Rine | Tyler Conley | Don Olson | Kulczyk / Girt / Lapidus / Pawson | Dan Joseph | ||||||||||
50 | Period 5 | 3:50 pm-4:50 pm | ||||||||||||||||||||||||
51 | Corrosion Control | Corrosion Control | Soil | Soil | Design of Impressed | Design of Impressed | Changes to Industry Standards | ECDA Indirect Inspection | Conducting | Internal Corrosion | Corrosion Control Training - | Impressed Current System | Pin Brazing | |||||||||||||
52 | Review of the day | Methods | Methods | Resistivity | Resistivity | Current Cathodic | Current Cathodic | for Jeeping Coated Pipe | Tools-DCVG-ACVG Current | Close Interval | Design Planning | Well Pad Considerations | GACP and ICCP Systems | Hands-On Work Shop | Lithium Battery | |||||||||||
53 | Measurements | Measurements | Protection Systems (Part 2) | Protection Systems (Part 2) | Attenuation (Part 2) | Surveys | and Communication | (Part 2) | (Part 3) | Technology | ||||||||||||||||
54 | Monitor | |||||||||||||||||||||||||
55 | Instructor | Heather Groll | Donald Savoie | Bryan Evans | Josh Brewer | Roy Fultineer | Tom Williams | Travis Talbott | Kimmer Cline | Jim Walton | Sam Lewis | Derek Kostuck | Tyler Conley | Sasan Hosein | Kulczyk / Girt / Lapidus / Pawson | Steve Gorings | ||||||||||
56 | Exhibits | 4:30 pm-7:30 pm | EXHIBITS--Mylan Park Ruby Community Center | |||||||||||||||||||||||
57 | ||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||
59 | Corrosion Math | 7:00 pm-9:00 pm | ||||||||||||||||||||||||
60 | Corrosion Mathematics in MRB 113; Bus Stop A | |||||||||||||||||||||||||
61 | Instructor | Michael Baxter (alternate - TBD) | ||||||||||||||||||||||||
62 | Wednesday 5/13/2026 | Your Course Track -> | Fundamentals (116) | Basic (324) | Intermediate (304) | Advanced (248) | Coatings (30) | Pipeline Integrity | Technology | Internal | System | Water & | Outdoor | What's New | ||||||||||||
63 | Management (59) | Today (70) | Corrosion (46) | Diagnostics (71) | Wastewater (30) | Workshop | (40) | |||||||||||||||||||
64 | Location | AGR G-06; Bus Stop C | SAS 1021; Bus Stop C | AER 135; Bus Stop C | MRB 113; Bus Stop A | EVC 414; Bus Stop A | ESB G39; Bus Stop A | ESB G102; Bus Stop A | MRB 109; Bus Stop A | ESB 207; Bus Stop A | ESB G-83; Bus Stop A | ESB G-84; Bus Stop A | ESB G-78B; Bus Stop A | MRB 105; Bus Stop A | AS Annex; Bus Stop D | MRB 205; Bus Stop A | ||||||||||
65 | Period 6 | 8:15 am-9:15 am | Pipeline Electrical | Introduction to | Introduction to | Pipeline | Pipeline | Design of Galvanic | Design of Galvanic | Above Ground Coatings For | Inline Inspection Standards, | Mechanisms of | RNG Sampling and | Workshop (Space Limited) | Corrosion Evaluation | Innovative | ||||||||||
66 | Isolation Methods | Pipeline Coatings | Pipeline Coatings | Coatings | Coatings | Cathodic Protection | Cathodic Protection | New Construction & Maintenance | Methods and Tools | AC Corrosion | Monitoring Experiences | Advanced Rectifier (Part 1) | and Inspection | Open Rain Date | Surface | |||||||||||
67 | Systems | Systems | Painting | **Bring Meter to Class** | Preparation | |||||||||||||||||||||
68 | Monitor | |||||||||||||||||||||||||
69 | Instructor | Samantha Parente | Doug Klingensmith | Thomas Keadle | Karen Bowman | Nickey Zafris | Tyler Conley | Tom Holzerman | Curt Bauer | Mike Placzek | Michael Baxter | Ryan Nutter | CM Nelson | David Sullivan | Ben Bussard (6) | |||||||||||
70 | Period 7 | 9:25 am-10:25am | ||||||||||||||||||||||||
71 | Fundamental Introduction | Potential | Potential | Criteria for | Criteria for | Eval of Underground | Eval of Underground | Critical Application Steps | Lightning and Over | Finding | Workshop (Space Limited) | Rockland County Interceptor | Cathodic Protection | |||||||||||||
72 | to Pipeline Coatings | Measurements | Measurements | Cathodic | Cathodic | Coatings Using Aboveground | Coatings Using Aboveground | for Two-Part Epoxies | AC Mitigation | Voltage Protection | Internal Corrosion | Advanced Rectifier (Part 2) | Sewer Rehabilitation | Open Rain Date | Products & Technologies | |||||||||||
73 | Protection (Part 1) | Protection (Part 1) | Techniques (Part 1) | Techniques (Part 1) | for Pipelines | with ILI | **Bring Meter to Class** | |||||||||||||||||||
74 | Monitor | |||||||||||||||||||||||||
75 | Instructor | Thomas Tarantella, Jr. | Travis Talbott | Mike Roberts | Roy Fultineer | Nickey Zafris | Jim Walton | Josh Brewer | Jeff Kunkle / Jeff Bertsche | Bryan Evans | Tim Bechtel | Jason Cramer | CM Nelson | Jacob Patten and Tyler Lowman | Aaron Raath (12) | |||||||||||
76 | Period 8 | 10:35 am-11:35am | ||||||||||||||||||||||||
77 | Fundamentals of | Current | Current | Criteria for | Criteria for | Eval of Underground | Eval of Underground | Coating Selection for | Atmospheric Corrosion | Decoupler Interaction | Corrosion / Erosion | Workshop (Space Limited) | Corrosion Control Procedures for | |||||||||||||
78 | Rectifier Monitoring | Measurements | Measurements | Cathodic | Cathodic | Coatings Using Aboveground | Coatings Using Aboveground | Underground Service | Integrity Management | with CP Systems | Instrumentation | Advanced Rectifier (Part 3) | Water and Sewer Pipeline | Open Rain Date | OPEN / TBD | |||||||||||
79 | Protection (Part 2) | Protection (Part 2) | Techniques (Part 2) | Techniques (Part 2) | Technology | **Bring Meter to Class** | Infrastructure - Part 1 (Design) | |||||||||||||||||||
80 | Monitor | |||||||||||||||||||||||||
81 | Instructor | Don Olson | Tim Perkins | Mike Roberts | Roy Fultineer | Nickey Zafris | Jim Walton | Josh Brewer | Steve Hall / Doug Klingensmith | Bryan Evans | Tony Castillo | Atilla Gajdacsi | CM Nelson | Joe Greulich | ||||||||||||
82 | Exhibits | 11:00 am-1:00pm | ||||||||||||||||||||||||
83 | EXHIBITS--Mylan Park Ruby Community Center | |||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | Period 9 | |||||||||||||||||||||||||
87 | 1:30 pm-2:30 pm | Introduction to | Resistance | Resistance | Installation of Test | Installation of Test | Corrosion | Corrosion | Field Applied Coatings and | Difficult to | CP Analysis using | Introduction to | Troubleshooting | Corrosion Control Procedures for | ECDA Indirect Insp. Field | Gas Storage | ||||||||||
88 | Pipe-to-Soil Potential | Measurements | Measurements | Stations and Electrical | Stations and Electrical | Mechanisms | Mechanisms | Shrink Sleeve Installation | Pig Pipelines | modern Reference | Microbial | Isolation | Water and Sewer Pipeline | Simulation ACVG-CIS-DCVG | Corrosion | |||||||||||
89 | Measurements (Part 1) | Isolation Devices | Isolation Devices | (Outdoor Clinic - 2 hours) | (Part 1) | Electrodes | Influenced Corrosion | Infrastructure - Part 2 (Install & Test) | Current Attenuation (Part 1) | (Part 1) | ||||||||||||||||
90 | Monitor | |||||||||||||||||||||||||
91 | Instructor | Mike Placzek | Tim Perkins | Michael Baxter | Ben Bussard | Jason King | Kevin Groll | Karen Bowman | Shane Quackenbush / Jack Wink | David Wint | Thomas Theissen | Jodi B Wrangham | Sam Parente | Joe Greulich | Walton / Verga / Ransel | Dr. Kashy Aminian | ||||||||||
92 | Period 10 | 2:40 pm-3:40 pm | ||||||||||||||||||||||||
93 | Introduction to | Rectifier Basics | Rectifier Basics | Troubleshooting | Troubleshooting | Direct | Direct | Corrosion Control | Difficult to | Vapor Corrosion Inhibitor | NDT | Regulatory Compliance | Installation of CP Systems | ECDA Indirect Insp. Field | Gas Storage | |||||||||||
94 | Pipe-to-Soil Potential | Cathodic Protection | Cathodic Protection | Examination | Examination | Resulting from Schedule Delays | Pig Pipelines | and Regulatory Standards - | Methods | Inspector & Operator | in Water Towers | Simulation ACVG-CIS-DCVG | Corrosion | |||||||||||||
95 | Measurements (Part 2) | Systems (Part 1) | Systems (Part 1) | (Part 1) | (Part 1) | (Part 2) | What you need to know | Perspectives | Current Attenuation (Part 2) | (Part 2) | ||||||||||||||||
96 | Monitor | |||||||||||||||||||||||||
97 | Instructor | Mike Placzek | Don Olson | Michael Baxter | John Otto | Michael Roberts | Joe Saxton | Karen Bowman | Nickey Zafris | David Wint | Kelly Baker | Rob Leary | Mary Friend | Adam Freeman | Walton / Verga / Ransel | Dr. Kashy Aminian | ||||||||||
98 | Period 11 | 3:50 pm-4:50 pm | S | |||||||||||||||||||||||
99 | Troubleshooting | Troubleshooting | Direct | Direct | Coating Remediation - | Elements of a Metallurgical | ECDA 4-Step | Internal | How to Prepare | Linings, Wet Wells, and Manholes | Gas Storage | |||||||||||||||
100 | Outdoor Workshop @ AS Annex | Cathodic Protection | Cathodic Protection | Examination | Examination | Liquids vs Tapes | Failure Analysis of a | Process Overview | Corrosion | for an Inspection | This is how we roll (and spray) | Basic/Fundamentals Workshop | Corrosion | |||||||||||||