1 | ITEM NO. | DESCRIPTION OF ITEM | QTY | UNIT | UNIT PRICE | Amount | Completion % | Amount | ||||||||||||||||||
2 | Prev. | Pres. | Total | |||||||||||||||||||||||
3 | DIVISION 1 - GENERAL REQUIREMENTS | |||||||||||||||||||||||||
4 | 1 | Site preparation and required demolition works including the removal of unusable and waste material to the approved off-Site disposal area and delivering the reusable materials to the storage area of the owner as per specifications | Item | |||||||||||||||||||||||
5 | 2 | SPECIAL REQUIREMENTS (Temporary Facilities) | ||||||||||||||||||||||||
6 | 2.1 | Establishing of offices and site facilities to cover the requirments of consultant, client representatives and contractor team. | Item | |||||||||||||||||||||||
7 | 2.2 | Maintenance of the Contractor's and Engineer's office and facilities (including cleaning, potable water and power supply during the whole duration of the Project) | Item | |||||||||||||||||||||||
8 | 2.3 | Removal of the Contractor's and Engineer's offices and site facilities on completion of the works and reinstatement of the area to as found" condition" | Item | |||||||||||||||||||||||
9 | 2.4 | Include all costs in connection with the provision of Contractor's site management and supervision staff for the duration of the project | Item | |||||||||||||||||||||||
10 | 2.5 | Include all costs for preparation of all necessary Shop Drawings, Method Statements, Field Sketches and the like | Item | |||||||||||||||||||||||
11 | 2.6 | Allow for all transport of work people to and from the workplace. | Item | |||||||||||||||||||||||
12 | 2.7 | Allow for all compliance with Health , Safety, Environmental and security requirements | Item | |||||||||||||||||||||||
13 | 2.8 | Allow for all compliance with Estidama requirements | Item | |||||||||||||||||||||||
14 | 2.9 | Allow for cost of providing contract Performance Bond. | Item | |||||||||||||||||||||||
15 | 2.10 | Allow for cost of providing the Contractor's All Risk Insurance. | Item | |||||||||||||||||||||||
16 | 2.11 | Allow for all sundry items such as testing of materials and the works, protection from weather, removal of rubbish and cleaning of the works on completion. | Item | |||||||||||||||||||||||
17 | 2.12 | Daily and Monthly reports describing work executed, labor employed, equipment and tools, areas of work in progress, instructions received, points of record, loose leaf presentation | Item | |||||||||||||||||||||||
18 | 2.13 | Include for keeping adjacent roads free of debris and plant and maintaining traffic flows | Item | |||||||||||||||||||||||
19 | 2.14 | Include for all costs involved in complying with all police/security regulations which may affect operations on or about the site but with special reference to the delivery of materials and removal of debris | Item | |||||||||||||||||||||||
20 | 2.15 | Provision of necessary electrical power for carrying out the works including making all connections, extension and removals | Item | |||||||||||||||||||||||
21 | 2.16 | Allow for signboard including maintenance and removal upon completion of works | Item | |||||||||||||||||||||||
22 | 2.17 | Allow for Temporary Fence around the site including maintenance and removal upon completion of Permanent Fence or completion of works. | Item | |||||||||||||||||||||||
23 | 2.18 | Allowance for necessary potable water for carrying out the works including making all connections, extensions and disconnection. | Item | |||||||||||||||||||||||
24 | 2.19 | Allowance for Telephones on Site and payment of all charges. | Item | |||||||||||||||||||||||
25 | 2.20 | Allowance for Internet Connections on Site and payment of all charges. | Item | |||||||||||||||||||||||
26 | 2.21 | Include for temporary lighting and ventilation where required for the works. | Item | |||||||||||||||||||||||
27 | 2.22 | Allow for all safety requirements including but not limited to – fire extinguishers; first aid kits, dust masks and respirator; hard hats, safety shoes, gloves, ear protectors, etc. | Item | |||||||||||||||||||||||
28 | 2.23 | Allow for small plant and tools. | Item | |||||||||||||||||||||||
29 | 2.24 | Allow for cranes and lifting plant. | Item | |||||||||||||||||||||||
30 | 2.25 | Include for setting up and maintaining traffic diversion signs in vicinity of site and removing on completion | Item | |||||||||||||||||||||||
31 | 2.26 | Allow for all sundry items, not elsewhere described, including but not limited to protection from inclement weather, control of noise and pollution and all statutory obligations. | Item | |||||||||||||||||||||||
32 | 2.27 | Allow for providing copies of standards and codes as required by the specifications. | Item | |||||||||||||||||||||||
33 | 2.28 | Allow for compliance with the required quality control and reporting procedures | Item | |||||||||||||||||||||||
34 | 2.29 | Allow for temporary labor accommodation | Item | |||||||||||||||||||||||
35 | TOTAL TO GRAND SUMMARY | |||||||||||||||||||||||||
36 | ||||||||||||||||||||||||||
37 | ||||||||||||||||||||||||||
38 | ||||||||||||||||||||||||||
39 | ||||||||||||||||||||||||||
40 | ||||||||||||||||||||||||||
41 | ||||||||||||||||||||||||||
42 | ||||||||||||||||||||||||||
43 | ||||||||||||||||||||||||||
44 | ||||||||||||||||||||||||||
45 | ||||||||||||||||||||||||||
46 | ||||||||||||||||||||||||||
47 | ||||||||||||||||||||||||||
48 | ||||||||||||||||||||||||||
49 | ||||||||||||||||||||||||||
50 | ||||||||||||||||||||||||||
51 | ||||||||||||||||||||||||||
52 | ||||||||||||||||||||||||||
53 | ||||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||
55 | ||||||||||||||||||||||||||
56 | ||||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||
59 | ||||||||||||||||||||||||||
60 | ||||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||