ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
ITEM NO. DESCRIPTION OF ITEM QTY UNIT UNIT PRICEAmountCompletion %Amount
2
Prev.Pres.Total
3
DIVISION 1 - GENERAL REQUIREMENTS
4
1Site preparation and required demolition works including the removal of unusable and waste material to the approved off-Site disposal area and delivering the reusable materials to the storage area of the owner as per specificationsItem
5
2SPECIAL REQUIREMENTS (Temporary Facilities)
6
2.1Establishing of offices and site facilities to cover the requirments of consultant, client representatives and contractor team.Item
7
2.2Maintenance of the Contractor's and Engineer's office and facilities (including cleaning, potable water and power supply during the whole duration of the Project)Item
8
2.3Removal of the Contractor's and Engineer's offices and site facilities on completion of the works and reinstatement of the area to as found" condition"Item
9
2.4Include all costs in connection with the provision of Contractor's site management and supervision staff for the duration of the projectItem
10
2.5Include all costs for preparation of all necessary Shop Drawings, Method Statements, Field Sketches and the likeItem
11
2.6Allow for all transport of work people to and from the workplace.Item
12
2.7Allow for all compliance with Health , Safety, Environmental and security requirementsItem
13
2.8Allow for all compliance with Estidama requirementsItem
14
2.9Allow for cost of providing contract Performance Bond.Item
15
2.10Allow for cost of providing the Contractor's All Risk Insurance.Item
16
2.11Allow for all sundry items such as testing of materials and the works, protection from weather, removal of rubbish and cleaning of the works on completion.Item
17
2.12Daily and Monthly reports describing work executed, labor employed, equipment and tools, areas of work in progress, instructions received, points of record, loose leaf presentationItem
18
2.13Include for keeping adjacent roads free of debris and plant and maintaining traffic flowsItem
19
2.14Include for all costs involved in complying with all police/security regulations which may affect operations on or about the site but with special reference to the delivery of materials and removal of debrisItem
20
2.15Provision of necessary electrical power for carrying out the works including making all connections, extension and removalsItem
21
2.16Allow for signboard including maintenance and removal upon completion of worksItem
22
2.17Allow for Temporary Fence around the site including maintenance and removal upon completion of Permanent Fence or completion of works.Item
23
2.18Allowance for necessary potable water for carrying out the works including making all connections, extensions and disconnection.Item
24
2.19Allowance for Telephones on Site and payment of all charges.Item
25
2.20Allowance for Internet Connections on Site and payment of all charges.Item
26
2.21Include for temporary lighting and ventilation where required for the works.Item
27
2.22Allow for all safety requirements including but not limited to – fire extinguishers; first aid kits, dust masks and respirator; hard hats, safety shoes, gloves, ear protectors, etc. Item
28
2.23Allow for small plant and tools.Item
29
2.24Allow for cranes and lifting plant.Item
30
2.25Include for setting up and maintaining traffic diversion signs in vicinity of site and removing on completionItem
31
2.26Allow for all sundry items, not elsewhere described, including but not limited to protection from inclement weather, control of noise and pollution and all statutory obligations.Item
32
2.27Allow for providing copies of standards and codes as required by the specifications.Item
33
2.28Allow for compliance with the required quality control and reporting proceduresItem
34
2.29Allow for temporary labor accommodationItem
35
TOTAL TO GRAND SUMMARY
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100