SL noRPMUDistictName of GPName of Schemes to be complettedYwarTS amountFund released from RPMUPC & JPCTarget date of completion Current StatusBalance Work Implementation progress %
6
1MalappuramKozhikkodeKotturThandapuramUp to 21-2217.255.7Sandra Babu& Kochurani sebastian31/3/2026Work ongoing (PWD road cutting issue solved on 23/09/2025 meetingPlastering work, Pumbset work, Balance pumbing main, Cover slab for well, Door for pumb house.70
7
2MalappuramPalakkadAgaliChittoorUp to 21-2240.380Anshad &Prasanth kumar31/5/2026Work of chittoor agrastani, agali gp stopped as per discussion with bg, ward members and secretary. work will start as abd when gp completes gravity main pipeline work. today as per discusion with ward member,she assured that their work will finish by Nov-15 and after that we can start our workWater meter work, House connection, Distribution line 350m pipe line work to tank55
18
3MalappuramPalakkadSholayoorKozhikkudam Pettikkal KuruvampadiUp to 21-2287.2032.69Shri.Anshad & Shri. Prashanth Kumar31/5/2026Now completed all works of four bg under KPK slec viz karunya, thusharam, navajeevan and vanadurga.Inlet and outlet pipe connection for 4 water tank and water meter connections for 4 BG, construciton of water tank and water meter connection for 3 BGs. 40
22
4MalappuramPalakkadChalavaraKendreekrutha kudiveIIa padhadi2022-2321.73.68Aiswarya & Sumalatha M31/1/2026Work ongoing - 900 m pumping main pipe laying work through PWD road pending. The AS amount is limited to do the civil works itself and hence the PWD road restoration amount is an over burden. GP requested to commence the work along with JJM PWD road cutting works,pumpset work completed and mb submitted for pumpset, (VIGILANCE ISSUE) Vigilance case resolved and Got approval letter from gp for laying pipe line.900 m pumping main pipe laying work through PWD road45
23
5MalappuramPalakkadPirayiriKavery swss2022-234.21.15Anshad & Sumalatha M31/3/2026Currently not working due to pump damage.BG is repeatedly raising their requirements .Frequetly damaged pumpset has to be replaced.GI pipe of 50 mm Pumping main of 250m 70
24
6MalappuramPalakkadKavasseryNeIIiyamkkunnu Canal varambu swss2022-235.610.98Aiswarya & Sumalatha M31/12/2025Partially Functioning. The estimate should be recast due to low yield in the borewell Scarcity of water in the locality is severe.pumpset work pending50
26
7MalappuramMalappuramMoothedamSrothus2022-238.990Allen Geo Varghese & Kochurani sebastian31/1/2026Work complete expect Kseb connection, Tank painting, Pipe line inter connectionKseb connection, Tank painting, Pipe line inter connection85
29
8IdukkiIdukkiUdumbannoorEdamaruk2022-237.50Surumi & Amina12.11.2025Proposed pumping line works,house connection rectification works are completed. distribution line replacement ongoingMotor installation and source roofing works remaining85
30
9IdukkiIdukkiUdumbannoorNallathanni2022-2350Surumi & Amina30.12.2025Tank maintenance work,motor replacement,hose connection rectification works are proposedNot started0
31
10IdukkiIdukkiUdumbannoorOlivirup2022-232.60Surumi & Amina12.01.2026Pumping line replacement and tank mantenance works are proposedNot started0
32
11IdukkiKottayamKaroorPathickal2022-23
33
12IdukkiKottayamKaroorThekkedath2022-23
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119