Project ref:C4124
Checking of 8m span of Box Drain in Longitudinal Direction
3
Project Title:
Nicoll Highway Station
Uniform LL =
4
25kN/m2
5
Property of the Box Culvert
6
Section Area A =
m2600mm
7
Top Slab thickness
8
Section Modulus
T = 250mm
9
I =4722333333333mm4
Internal Depth
Lever Arm Z
10
S =3,63256E+09mm3D =2m
Wall thickness
2.5m
11
Internal width
t =250mm
12
(1)-- Design Moment
B =5m
13
Moment coeff. =0,11
(at first interior support)
14
Moment coeff. =0,08
(at interior support)
15
Moment coeff. =0,07
(at middle interior span)
16
M =14902kN.m
(at interior support)
Base Slab thickness
17
Pile support distance
b =350mm
18
Spacing =21m
19
20
Compression stress
21
s =4,102N/mm2
22
23
Simplified Approach: M = F * Z
24
Lever arm Z =2.5m
25
Tension/Comp F =
0kN
26
Tension reinf't req
1mm2
Yield strength =
460mm2
27
reinforcement at Base slab =
T1@150mmc/c
28
Equivalent reinf't area over base slab =
29mm2
Longi reinf't OK
29
30
Design Forces
31
Design LL =25kN/m2=137,5kN/m
32
Earth weight DL=12kN/m2=66kN/m
33
Self weight SW=0kN/m=0kN/m
34
Water Weight WL=
2
m height
=110kN/m
35
Service Load = 1.0*(DL+SW+WL+LL)
=313,5kN/m
36
Ultimate Load qult = 1.4*(DL+SW)+1.0*WL+1.6*LL =
422,4kN/m
37
38
(3) Shear force check
39
Shear coeff. =0,55
(at interior support)
40
Shear foce @ av from supportface
=-5189158
kN/side wall
41
shear stress =-8302,652N/mm2
42
Shear resist. vcmin=
0,4N/mm2Shear OK
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100