ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
2
7.    BID SCHEDULE
3
Name of Project:Museum Annex Addition
4
Contractor Name:
5
6
Contractor is required to provide a detailed proposal of all labor, material, equipment and supplies, as
7
well as completing the summary list below based on the Divisions of this project. (Include general
8
conditions, permits, O&P, etc, if not added into costs).
9
10
Item No.ItemCost
11
1General Conditions (Division 01)
12
2Site Work (Division 02)
13
3Concrete (Division 03)
14
4Masonry (Division 04)
15
5Metals (Division 05)
16
6Woods and Plastics (Division 06)
17
7Thermal and Moisture (Division 07)
18
8Doors and Windows (Division 08)
19
9Finishes (Division 09)
20
10Specialties (Division 10)
21
11Equipment (Division 11)
22
12Furnishings (Division 12)
23
13Special Construction (Division 13)
24
14Conveying Systems (Division 14)
25
15Mechanical and Plumbing (Division 15)
26
16Electrical and Lighting (Division 16)
27
17Earthwork (Division 31)
28
18Utilities (Division 33)
29
19Add/Alt – Patio Deck Removal
30
31
TOTAL BID:
32
33
34
Total Bid Written in Words
35
36
37
Authorized Signer
Authorized Signer and Title (Print)Date
38
(Signature)
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100