Scope:Paint
3
4
Date:12/5/2025
5
SR #REFDESCRIPTIONQUANTITYUNITWASTAGEQUANTITY W/ WASTAGEMATERIAL RATELABOR RATEEQUIPMENT RATEMATERIAL COSTSLABOR COSTSEQUIPMENT COSTSSUB COST
6
1000GENERAL REQUIREMENTS
7
1Supervision and Coordination1LS0%1.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
8
2Submittals and Shop drawings1LS0%1.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
9
3Final Cleaning1LS0%1.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
10
4Mobilization Costs1LS0%1.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
11
5Bond @ 2%1LS0%1.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
12
6Temporary Control & Facilities1LS0%1.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
13
7ScaffoldingSF0%0.00
14
SUBTOTAL$0.00
15
16
9000FINISHES
17
0%0.00
18
Wall Finish
19
8Paint On Wall As;PT-1
-Manufacturer; Sherwin Williams
-Model; SW8917
-Color; Shell White
8,462.00 SF10%9308.20$0.00$0.00$0.00$0.00$0.00$0.00$0.00
20
9Paint On Wall As;PT-2
-Manufacturer; Sherwin Williams
-Model; SW6509
-Color; Georgian Bay
348.00 SF10%382.80$0.00$0.00$0.00$0.00$0.00$0.00$0.00
21
10Paint On Existing Wall As;PT-1
-Manufacturer; Sherwin Williams
-Model; SW8917
-Color; Blue Accent Color
4,974.00 SF10%5471.40$0.00$0.00$0.00$0.00$0.00$0.00$0.00
22
11Patch & Repair Existing Brick Masonry 381.00 SF10%419.10$0.00$0.00$0.00$0.00$0.00$0.00$0.00
23
24
Floor Finish
25
12Epoxy Finish At Floor 4,871.00 SF10%5358.10$0.00$0.00$0.00$0.00$0.00$0.00$0.00
26
27
Ceiling
28
13Paint On Gypsum Board Ceiling 294.00 SF10%323.40$0.00$0.00$0.00$0.00$0.00$0.00$0.00
29
14Paint On Existing Gypsum Board Ceiling 179.00 SF10%196.90$0.00$0.00$0.00$0.00$0.00$0.00$0.00
30
15Paint Existing Exposed Ceiling 695.00 SF10%764.50$0.00$0.00$0.00$0.00$0.00$0.00$0.00
31
32
Exterior Finish
33
16Paint On Brick Facade 4,061.00 SF10%4467.10$0.00$0.00$0.00$0.00$0.00$0.00$0.00
34
17Paint/Stucco On Brick Column & CMU Pillar 157.00 SF10%172.70$0.00$0.00$0.00$0.00$0.00$0.00$0.00
35
18Paint Existing CMU Wall 466.00 SF10%512.60$0.00$0.00$0.00$0.00$0.00$0.00$0.00
36
37
Roof
38
19Paint Acoustical Metal Roof Deck 807.00 SF10%887.70$0.00$0.00$0.00$0.00$0.00$0.00$0.00
39
20TPO Roof Finish (V.I.R) 355.00 SF10%390.50$0.00$0.00$0.00$0.00$0.00$0.00$0.00
40
21Patch & Repair Existing TPO Roof 4,328.00 SF10%4760.80$0.00$0.00$0.00$0.00$0.00$0.00$0.00
41
42
Columns
43
22Paint On Column As;PT-1
-8'-0"High
2.00 EA0%2.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
44
45
Doors
46
23Paint On Single Leaf Doors 14.00 EA0%14.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
47
24Paint On Existing Single Leaf Doors 7.00 EA0%7.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
48
25Paint On Existing Double Leaf Doors 2.00 EA0%2.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
49
50
Misc.
51
26Paint On Door Trim & Frame As;PT-3
-Manufacturer; Sherwin Williams
-Model; SW7052
-Color; Gray Area
794.00 LF5%833.70$0.00$0.00$0.00$0.00$0.00$0.00$0.00
52
27Paint On Window Trim As;PT-3
-Manufacturer; Sherwin Williams
-Model; SW7052
-Color; Gray Area
714.00 LF5%749.70$0.00$0.00$0.00$0.00$0.00$0.00$0.00
53
28Paint On Steel Frame As;PT-3
-Manufacturer; Sherwin Williams
-Model; SW7052
-Color; Gray Area
15.00 LF5%15.75$0.00$0.00$0.00$0.00$0.00$0.00$0.00
54
29Paint Existing Wood Trim 92.00 LF5%96.60$0.00$0.00$0.00$0.00$0.00$0.00$0.00
55
56
57
SUBTOTAL$0.00
58
59
PROJECTED COST$0
60
OVERHEAD AND PROFIT20%$0
61
INSURANCE3%$0
62
CONTINGENCY5%$0
63
SUGGESTED BID$0
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101