CLIENT'S INFORMATION:
3
PROJECT ID:
Irmer Residence RemodelCONTACT:
4
1122 Loring Street San Diego, California 92109
E-MAIL ADDRESS:
5
SCOPE:
Everything
PHONE NUMBER:
6
Date:1/24/2021
7
ITEM #DWG. #DESCRIPTIONQUANTITYUNITMATERIALLABORUNIT COSTTOTAL COSTTRADE COST
8
GENERAL REQUIREMENTS
9
1Supervision1LS$$$
10
2Permits1LS$$$
11
3Final Clean-up1LS$$$
12
4Mobilization Costs1LS$$$
13
5Project Overheads1LS$$$
14
6Bonds1LS$$$
15
7Temporary Control & Facilities1LS$$$
16
8Excavation20CY$$$
17
9Scaffolding1800SF$$$
18
Subtotal (General Requirements)$0
19
20
DIVISION 02- SITE WORK/ EXISTING CONDITIONS
21
Sheet # 1CSite Work
22
10Concrete Pavement423SF$$$$
23
11Fiber Rolls (Straw Wattles)73LF$$$$
24
12Landscaping2266SF$$$$
25
13(12" Wide) Concrete Stair Step (Assumed, Detail Not Given)53LF$$$$
26
Demolition Work$$$$
27
14Remove Window10EA$$$$
28
15Remove Double Leaf Door W/ Side Lite1EA$$$$
29
16Remove Single Leaf Door5EA$$$$
30
17Remove Wall 88LF$$$$
31
18Remove Closet Door2EA$$$$
32
19Remove Floor Finishes (Patch & Repair AS Required)1312SF$$$$
33
Subtotal (Site Work/ Existing Conditions)$0
34
35
DIVISION 03- CONCRETE
36
Sheet # 5Foundation Work
37
20(1'-2" x 1'-0") Concrete Footing W/ Reinforcement5.617CY$$$$
38
21(1'-0" x 1'-4") Concrete Footing W/ Reinforcement0.296CY$$$$
39
22(1'-4" x 2'-8") Concrete Footing W/ Reinforcement2.107CY$$$$
40
23(1'-6" x 2'-8") Concrete Footing W/ Reinforcement0.741CY$$$$
41
24(1'-3" x 1'-6") Concrete Footing W/ Reinforcement0.903CY$$$$
42
25(1'-0" x 1'-0") Concrete Footing W/ Reinforcement0.074CY$$$$
43
26FTG-1 (2'-0" x 2'-0" x 1'-0") Concrete Pad Footing W/ Reinforcement (2 EA)0.296CY$$$$
44
27FTG-2 (3'-0" x 3'-0" x 1'-0") Concrete Pad Footing W/ Reinforcement (2 EA)0.667CY$$$$
45
28FTG-3 (2'-0" x 2'-0" x 1'-0") Concrete Pad Footing W/ Reinforcement (4 EA)0.593CY$$$$
46
29FTG-4 (2'-0" x 2'-0" x 1'-0") Concrete Pad Footing W/ Reinforcement (1 EA)0.148CY$$$$
47
30FTG-5 (2'-0" x 2'-0" x 1'-6") Concrete Pad Footing W/ Reinforce (3 EA)0.667CY$$$$
48
31(8" Thick) Concrete Wall W/ Reinforcement (1-6" High)6.297CY$$$$
49
Slabs$$$$
50
32(4" Thick) Concrete Slab W/ #4 Rebar @ 24" O.C. Each Way Over 4" Compacted Fill W/ 10 Mill Vapor Barrier (244 SF)3.012CY$$$$
51
33(1'-4" High) Compacted Rubber Fill (151 SF)7.455CY$$$$
52
Subtotal (Concrete)$0
53
54
DIVISION 05- METALS
55
Sheet # 5Main Level
56
Simpsons
57
34EPC2EA$$$$
58
35ECCQ9EA$$$$
59
36CCQ1EA$$$$
60
37ECCLLQ1EA$$$$
61
38A35175EA$$$$
62
39HU212-2TF Hanger35EA$$$$
63
40LSTA2427EA$$$$
64
41ST2210EA$$$$
65
42U24 Hanger30EA$$$$
66
43U26 Hanger8EA$$$$
67
Straps$$$$
68
44MST3714EA$$$$
69
45CS16x26'-0"1EA$$$$
70
46CS16x21'-0"1EA$$$$
71
47CS16x11'-0"1EA$$$$
72
Subtotal (Metals)$0
73
74
DIVISION 06- WOOD, PLASTIC & COMPOSITES
75
Sheet # 5Main Level
76
Beams
77
48FLBM-1 (4x8) Wood Beam DF#121LF$$$$
78
49FLBM-2 (4x10) Wood Beam DF#150LF$$$$
79
50Solid Blocking71LF$$$$
80
Floor Framing$$$$
81
512x6 Floor Joist @ 16" O.C. (860 SF)646LF$$$$
82
523/4" Plywood T&G STR 1,40/20. 5 Ply Floor Sheathing860SF$$$$
83
Posts$$$$
84
53(4x4) PTDF Post W/ PC & PB (4" High & 6 EA)2LF$$$$
85
54(4x4) Wood Post (10'-1" H & 10 EA)101LF$$$$
86
55(4x4) Post (8'-1" H & 24 EA)194LF$$$$
87
Stair$$$$
88
56(8'-8" Wide) Wood Stair AS:
-(11" Wide) Tread: 3 EA
-(6" High) Riser: 4 EA
1LOC$$$$
89
Ceiling Framing$$$$
90
572x6 Ceiling Joist @ 16" O.C. (44 SF)44SF$$$$
91
Roof$$$$
92
Headers$$$$
93
58(4x6) Header62LF$$$$
94
59(4x8) Header33LF$$$$
95
60RFBM-1 (4x10) DF#1 Beam8LF$$$$
96
61RFBM-2 (4x12) DF#1 Beam10LF$$$$
97
62RFBM-3 (4x8) DF#1 Beam6LF$$$$
98
63RFBM-4 (3-1/2" x 14) 2.0E Parallam Beam15LF$$$$
99
64RFBM-5 (3-1/2" x 14) 2.0E Parallam Beam15LF$$$$
100
65RFBM-6 (3-1/2" x 14) 2.0E Parallam Beam16LF$$$$
101
66RFBM-7 (4x8) DF#1 Beam6LF$$$$