ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
Name of Company:
2
Well Name & Number:
3
Date:
avril 15, 2026
4
5
0
6
Pump Output, bbl/stroke? =
Hole Size, in? =
7
MD of Well, ft? = DP OD, in? =
8
TVD of Well, ft? = DP ID, in? =
9
Bit or Hole Size, in? =
Sacks of Cement to Use? =
10
Depth Casing Set, ft? = Yield/Sx, ft³? =
11
... Casing ID, in? =
Depth Bottom of Plug, ft? =
12
Length of Drill Pipe, ft? =
13
... Drill Pipe OD, in? =
Plug Height or Length
#DIV/0!
14
... Drill Pipe ID, in? =
Depth to Top of Plug
#DIV/0!
15
Length of HWDP, ft? = Water Ratio #DIV/0!
16
... HWDP OD, in? =
Barrels to Displace or Balance Plug
#DIV/0!
17
... HWDP ID, in? =
18
... Drill Collars OD, in? =
19
... Drill Collars ID, in? =
Air Gap (RKB to Water), ft? =
20
Current Mud Weight, ppg? =
Water Depth, ft? =
21
Slow Pump Pressure? = TVD of Hole, ft? =
22
Shut-in Drill Pipe Pressure, (SIDPP)? =
Current Mud Weight, ppg? =
23
Shut-in Casing Pressure, (SICP)? =
Weight of Sea Water, ppg? =
24
Pit Gain, bbls? =
Mud Weight For Required BHP
#DIV/0!
25
26
Mud Weight to Kill#DIV/0!
27
Initial Circulating Pressure
0 Angle Last Survey? =
28
Final Circulating Pressure
#DIV/0! MD Last Survey? =
29
STKS - Kill Mud Surface to Bit
#DIV/0! TVD Last Survey? =X
30
STKS - Kill Mud Bit to Surface
#DIV/0! MD For New TVD? =
31
STKS - Full Circulation#DIV/0! Result New TVD0'X =#DIV/0!
32
Estimated Length of Kick, ft
#DIV/0!
33
Estimated Density of Kick Material, ppg
#DIV/0!
34
Estimated Max Casing Pressure for a Gas Kick
#DIV/0! Angle Last Survey? =
35
TVD Last Survey? =
36
MD Last Survey? =
37
Top of Liner, TVD? = TVD For New MD? =
38
Mud Weight, ppg? = Result New MD0'Y =#DIV/0!
39
Differential Test Pressure, psi? =
40
Drill Pipe ID, in? =
41
TVD Length of Mud in Drill Pipe, ft
#DIV/0!
Formation Pressure, psi? =
42
Volume Mud to Fill Drill Pipe, bbls
#DIV/0!
Amount of Underbalance PSI to Perforate, psi
43
Differential Test PSI in EMW, ppg
#DIV/0!
Density of Fluid For Cushion, ppg
44
Tubing or Workstring Capacity, bbl/ft? =
45
Water Cushion, bbls#DIV/0!
46
Amount of Underbalance, psi? =
47
Amount of Nitrogen Cushion, psi? =
48
Weight of Fluid in Hole, ppg? =
Total Volume to Build, bbls? =
49
BHP or Formation Pressure of Zone, ppg? =
Weight of Base Fluid, ppg? =
50
TVD of Zone, ft? =
% KCl Required, (1-10)? =
51
*TVD length of fluid column to displace with N2
#DIV/0!
Pounds of KCL in One Sack? =
52
Sacks of KCl Required
#DIV/0!
53
54
Volume of interval from Caliper Log, ft3? =
55
Length of Interval, ft? =
Mud Weight in Use, ppg? =
56
Average Hole Size, in#DIV/0!
Weight of BHA in Air, Lbs? =
57
Weight of BHA in Mud*,lbs
0
58
Max Available Weight to Run on Bit*,lbs
0
59
Centigrade temperature, º? =
60
Fahrenheit temperature, º? =
61
Centigrade to Fahrenheit
32 Bit Size, in? =
62
Fahrenheit to Centigrade
-17,77777778
OD of Casing Coupling, in? =
63
Minimum Drill Collar Size*,in
0,000
64
65
1. Support 20K to 35K string weight.
66
2. Shouldn't pump off with the string weight it supports.
Length of Pit, ft? =
67
3. Have a drill-off rate between 1' and 5' per minute.
Width of Pit, ft? =
68
Barrel per Inch of Depth of Fluid
0,0
69
References: Halliburton Cementing Handbook, Baker Oil Tools Handbook, *DRILCO Drilling Assembly Handbook and WCS Well Control School Manual
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
APPLICATION CALCULATIONS - DO NOT REMOVE!
87
CAPACITIES BBL/FTFT/BBL
88
DP & CSG Annulus0,0000#DIV/0!
89
DP & OH Annulus0,0000#DIV/0!
90
HWDP & OH Annulus0,00000,00
91
DC & OH Annulus0,0000#DIV/0!
92
ANNULAR VOLUMESBARRELS
93
Drill Pipe and Casing
0,00
94
Drill Pipe and Open Hole
0,00
95
HWDP and Open Hole
0,00
96
DC and Open Hole0,00
97
DRILL STRING VOLUMESBARRELS
98
Drill Pipe0,0
99
HWDP0,00
100
Drill Collars0,00