THIS SHEET IS NOW DEPRECATED, PLEASE SEE THE UPDATED AND MAINTAINED ONE HERE:
2
https://docs.google.com/spreadsheets/d/17ZQipk7hrhHMKIkH7NgX8mNZbqcx0eAG6KceL1h046g/edit?usp=sharing
3
Contribution
Responsible
Status
Person handling
Comments/details
4
5
Target System
6
target ladder with motor drive and LVDT readoutMITDone
7
power supply with local and remote controlMITDone
8
50 m of cableMITDone
9
tantalum foils (1, 5, and 10 micron)MITDone
10
carbon foils (1 and 5 micron)MITDone
11
BeO screenMITDone
12
modification of target ladder frame (change targets)TRIUMFTo dodoug P?
13
add visual fiducials of some sortTRIUMFdoug P
14
EPICs control of target systemTRIUMFTo do
Controls group - work request exists
15
Check work request to controls: end of range stop?
16
If power is on and any signal is received, ladder will move. So just tell them this and let them figure it out
17
Probably controls will just take apart the box or whatever, and add their own pieces? Make sure that Controls has Doug H and Jan's contact info
18
Scattering Chamber
19
scattering chamberMITDone
20
modification to upstream beamline for bellowsMITDone
21
ion pump and controllerMITDone
22
neg pumpMITDoneDoesn't need controller or cable. Just bring power supply to it.
23
Tell Doug P brand/type of neg so he can confirm we have connector/whatever
TRIUMFTo doLaura
24
convectron gauge, controller, and cableMITDoneIn next shipment
25
hot filament gauge, control cardMITDoneIn next shipment
26
Cable for the aboveTRIUMFTo do
Cable from filament to control card? From where to where, who does this, etc
27
Check we have spare slot in hot filament controllerTRIUMFTo do
28
pump-out port with valveMITDone
29
optical windowMITDone
30
infra-red windowMITDone
31
Do we need an IR camera?No
32
stand with 6-strut systemMITDone
33
design of radiation shieldingMITDone
This is just the stuff around the chamber. The borated poly and the bags of lead shot
34
BPM on upstream beamline (install buttons and cables)TRIUMFTo do
35
manufacture of radiation shieldingTRIUMFTo doDoug P
36
pump-out stationTRIUMFDone
37
cameras for optical TRIUMFTo do
38
Cables for ion pump
MIT/TRIUMF
In progressDoug H
Jim sent some photos of cable ends and website to order more, but what we need was ambiguous. Doug H to clarify with Jim
39
40
Spectrometers
41
dipole magnetic spectrometersMITDone
42
power suppliesMITDone
43
vacuum chambers for dipolesMITDone
44
PEEK insertsMITDone
45
exit windows from vacuum chamber, protective coverMITIn progress
46
collimators and bellows between scattering and dipole chambers
MITDone
47
Hall probesMITDoneHolders done and being sent by MIT
48
NEMA box for cabling and water coolingTRIUMFTo do
Someone check with Doug P
High current connections on back of dipoles - is it safe? How are we protecting it
49
stands with 6 strut systemsMITDone
50
support system for GEMs and Trigger ScintilatorMITDone
51
design of radiation shielding - send to TRIUMFMITIn progress
52
Make GEM radiation shieldingTRIUMFTo doDepends on: taking existing shielding out of beamline
53
Make support stands for shieldingTRIUMFTo doDepends on: getting design from MIT
54
cables to roofTRIUMFIn progressLaura/StephiDependency: getting cables from Marco (he is confused about this)
55
water coolingTRIUMFTo do
56
57
Beamline Elements
58
first round of permanent magnet quadrupolesMITDone
59
second round of permanent magnet quadrupolesTRIUMFIn progress
60
beam position monitorsTRIUMFTo do
61
bellowsTRIUMFTo do
What was this? Which bellows?
62
electromagnetic quadrupolesTRIUMFIn progress
63
collimatorTRIUMFIn progress
64
spool pieces with PMQs
UBC/TRIUMF
In progressFirst one done
65
I suspect there is a lot more that should be added here
66
GEM Detectors
67
GEM detectorsHamptonIn progressMichael2 GEMs will be shipped in March
68
APV cardsHamptonIn progressMichael
26 APV cards, backplanes, ana+dig patch panels, power regulators will be shipped in March
69
HDMI cables with adaptors, 20m
Hampton/TRIUMF
In progresswill be ordered by HU
70
HV divider chains, HV power supplyHamptonIn progressdividers and supplies on hand; what are we doing about cables?
71
HV cables from upstairs to downstairsTRIUMFLaura
Replace cables currently on the GEMs with SHV end so we can just use standard SHV cables? Need help
72
LV distribution cables, LV powerHamptonIn progressMichael
73
LV cables to upstairsHamptonIn progressMichael
4 pairs of 14 (or 12) gauge long cables, 4 pairs of small ones that basically carry nothing. Might already come in groups of 2 thick, 2 thin
74
VME crate with controller, MPD cardsHamptonIn progress
1 VME crate is at TRIUMF and 2 MPDs; another 2 MPDs will be shipped in March
75
gas regulator, pressure gauge, safety valve, shut-off valveMITDone
76
gas manifold with bubblersHamptonDoneOne pre-assembled manifold board with 4 flow meters at TRIUMF
77
TV monitoring of bubblersTRIUMFDone
78
Low voltage power suppliesHamptonIn progress
Michael taking care of it
LV supplies will be ordered by HU
79
80
Trigger Scintillator
81
scintillating strip detectors with SiPM readoutUBCIn progress
82
distribution boardsUBCDone
83
cabling to upstairsUBCTo do
84
power suppliesUBCTo do
85
86
Electronics Rack
87
cable tray from roof to experimentTRIUMFIn progress
88
electronics racksTRIUMFDone
89
desk and chairTRIUMFDoneSufficient
90
computer with monitor, keyboard and mouseSBUDone
91
92
Counting room
93
Get room assignedTRIUMFTo doStephiVia space committee
94
desks with chairsTRIUMFIn progress
95
computers with monitors, keyboards and miceSBUDone
96
97
Office space
98
desks with chairsTRIUMFTo doKateMaybe get space in trailer FF
99
100
Personpower for Installation