CountryHydropower plant nameRiverCommunity; DistrictType: Existing before 2005/Rehabilitation/Conversion/Greenfield (built or planned after 2005)/Cancelled/Duplicate/Unclear/Additional row: Multiple financing sourcesLocation co-ordinates (WGS84)Name of the protected/high biodiversity value areaProtection/Recognition statusInside protected area / Outside protected area with direct impactExisting capacity (MW)Predicted additional capacity (MW)Generation in MWh
Project sponsorInvestorInvestor CountryUltimate owner of investorPublic/Private No of hydros in cascade or concessionDate of concessionLength of concession (years)Concession End DateSubcontractors/ConsultantsDevelopment phase (potential, planned; offered for investment; concession awarded; under construction; operational<5years; operational 5-10years; operational>10years; cancelled, unclear)Date when put into operationTotal project costs - CurrencyTotal project costs - Amount (mil.)Total project costs - EUR equivalent
(mil.)
Financed by own resources in EURMDB finance - Name of MDBMDB finance - Status (Planned/Approved/Signed/Invested/Completed/Cancelled)MDB finance - TypeMDB finance (mil. EUR)Commercial banks - NameCommercial banks - Status (Planned/Signed/Invested/Completed/Cancelled)Commercial banks - Amount (in mil. EUR)Other public financing (special funds, government agencies, regional development banks) - Name of special fundOther public financing (special funds, government agencies, regional development banks) - Status (Planned/Signed/Invested/Completed/Cancelled)Other public financing (special funds. government agencies. regional development banks) - Amount (in mil. EUR)Assistance column construction financingRemarksInfo Source
2
AlbaniaDevoll cascade / Banje (also Banja)DevollBanja village; Gostime Commune; Elbasan DistrictGreenfield0.0070255 GWhDevoll Hydropower Sh.A.Statkraft AS Norway100%private32008Norplan (Norway), Alstom (France), Sweco (Sweden), AF-Consult Switzerland; Limak Construction Group (Turkey); Norconsult (Norway)operational<52016EUR
535Not identifiedOriginally developed under JV between Statkraft and EVN. In March 2013, Norwegian Statkraft AS and Austrian EVN AG signed an agreement by which Statkraft acquired EVN’s 50 percent stake in Devoll Hydropower ShA.

Investments in a group company, Statkraft Markets B.V., Amsterdam/Netherlands, were increased by EUR 51.2 million in 2013. The investment in Statkraft Markets B.V. was made to provide financing for a power plant construction by one of its subsidiaries: Devoll Hydropower Sh. A., Tirana/Albania.

Workers protests against working conditions in August 2014: http://www.devollhydropower.al/new/?p=8441. This was the second time within 3 months Banja hydropower plant workers protested against low wages and fulfilling the conditions at work. When the decision was taken to boycott work, workers were threatened by police officers called by representatives of the firm "Limak.

CDM project

"The total investment of the Devoll project is estimated to approximately EUR 500 million"
http://www.statkraft.de/Statkraft/Documents/de/Investor%20Relations/Anual%20Report%202013%20Statkraft%20Markets%20GmbH_Web%20Vers._ENGLISH.pdf; http://www.balkaneu.com/premier-albania-inaugurates-biggest-projects-hydro-power/; https://www.youtube.com/watch?v=SBEivRbz3ec; http://www.devollhydropower.al/new/?page_id=7754; https://cdm.unfccc.int/Projects/DB/DNV-CUK1324294885.32/view; http://www.statkraft.com/media/press-releases/Press-releases-archive/2013/statkraft-aquires-evns-shares-in-devoll-hydropower-sha/; http://tr.ebrd.com/tr13/index.php/en/country-assessments/1/albania; http://www.limak.com.tr/sectors/construction/projects/dams
http://balkangreenenergynews.com/statkraft-opened-its-first-hydropower-plant-in-albania/
3
AlbaniaAshta 2 (former Bushati)DrinShkoderGreenfieldBuna River – Velioja Protected landscapeNational strict protected area

Emerald
Inside32.200Energji Ashta ShpkVerbund; EVN AGAustriaRepublic of Austria (51%)private2200835Austrian Hydro Power AG (Austria); Poyry (Finland); Andritz Hydro (Austria); Porr AG (Austria)operational 5-102012160EURMultilateral Investment Guarantee Agency (MIGA)Signedguarantee121.40BAWAG P.S.K. BankCompleted140YesIn February 2001, Albania’s power utility KESH contracted the China Water & Electricity Corporation (CWE) to build a HPP at Bushati, on a turnkey basis. The CWE plan would affect the levels of Lake Shkodra. In August 2001, the government suspended the CWE contract for an independent assessment of the plan’s technical, environmental, financial, and economic feasibility by the German engineering firm Lahmeyer International.

In 2001 the Export-Import Bank of China (China Exim Bank) pledged to provide buyer's credit worth more than US$100 million for Bushati HPP.

CDM project

Original currency MDB finance: 159.4 mil. USD

The overall volume of €140 million will be borne equally between VERBUND International Finance B.V. and BAWAG PSK Bank für Arbeit und Wirtschaft und Österreichische Postsparkasse Aktiengesellschaft, and the sub-participating banks Raiffeisen Landesbank Oberösterreich Aktiengesellschaft and Kommunalkredit Austria Aktiengesellschaft. The term will be ten years.

On July 15, 2013, the Company received a new loan from Raiffeisen Bank International for a sum of 70 million Euro and slammed the debt with Bawag P.S.K Bank for the same amount. New borrowing holds the variable interest rate, currently 3.38%. Borrowing is payable in thirty-five quarterly installments starting on October 15, 2013. On the same date, another borrowing agreement with the same terms and conditions were signed with Verbund International Finance GmbH. Loans are jointly guaranteed by the respective Groups owned by the Owner of the Company, and for these guarantees the Company pays them, a 2% charge on the remaining loan amount.
Verbund Annual Financial Report 2011-2012; http://www.miga.org/projects/index.cfm?pid=1052; http://media-newswire.com/release_1074872.htmlů http://www.premiereservices.al/assets/vendor/pdf/HEC.pdf; https://openknowledge.worldbank.org/bitstream/handle/10986/10545/488270BRI0IFCS1hta0Hydropower1FINAL.pdf?sequence=1; http://www.chinadaily.com.cn/epaper/html/cd/2001/200102/20010209/20010209005_3.html; https://cdm.unfccc.int/filestorage/U/8/1/U81WCZ9ARPBNQMEI64DSY5O2K3VLHF/5662%201%20Revised%20PDD.pdf?t=S2h8bnA5bGVtfDD8wfJ3Dgz3vAoVdI9zix5c
http://www.energji-ashta.al/?id=21&l=17
4
AlbaniaAshta 2 (former Bushati)DrinShkoderAdditional row: Multiple financing sourcesBuna River – Velioja Protected landscapeNational strict protected area

Emerald
InsideEnergji Ashta ShpkVerbund; EVN AGoperational 5-10International Finance Corporation (IFC)Completedadvisory servicesYeshttp://www.ifc.org/wps/wcm/connect/27748785-ef2c-45f4-add0-2bd0094ef342/PPPStories_Albania_AshtaHydropower.pdf?MOD=AJPERES
5
AlbaniaBadelonjeVjosaGreenfieldGermenj-Shelegure-Leskovic-Piskal parkNational strict protected area
Outside0.0030not identifiednot identifiedpotentialNoneHPP is just outside the protected area but impoundment will influence Emerald site (Germenj-Shelegure-Leskovic-Piskal park)http://energjia.al/2014/05/17/a-ja-vlen-te-sakrifikojme-vjosen, http://www.ecoalbania.org/wp-content/uploads/2017/05/HPPs_al_final-report_me-kapak.pdf
6
AlbaniaBele-Topojan concession / Bele 2LumaBele; KukesGreenfield0.0011"Alb-Energy" shpkKADRIA 23.66%, ALB-BUILDING 76.34%private5200835Cheng Hsiung International (China), Hydro Energia (Italy)operational<52015see Bele 1Not identifiedOn 23.4.2015 electricity productionlicense transferred from Alb-Energy shpk to Euron Energy Group shpk for Bele 2 and Topojan 1

Long term loan registered - ALL 502429166 in 2015.
Short term part of the long term loan - ALL 133260343 .
Overdraft at Raiffesen bank - ALL 191405
Later in 2016, the loan taken from Raiffesen bank.
http://mobile.ikub.al/LIGJE/Per-miratimin-e-kontrates-se-Koncesionit-te-formes-Bot-Te-lidhur-ndermjet-ministriSe-se-Ekonomise-Tregtise-dhe-Energjetikes-dhe-bashkimit-te-shoqerive-euron-shpk-Kadria-shpk-dhe-; http://ppi-re.worldbank.org/data/project/euron-kukes-hpp-6658Teuta-konstruksion-shp-812030044.aspx?cookiesEnabled=false; https://it-it.facebook.com/hydroenergiaitalia/posts/330282740444590; http://www.ere.gov.al/doc/VENDIM_NR.54_2015-1.pdf
http://www.qkb.gov.al/umbraco/Surface/SearchSurface/DownloadDocument?documentCode=7DA9ADF0-455F-43D7-BC14-14E3FBB94F77
7
AlbaniaBeleshova cascade / Belesova 1 (also Belesove 1) BelesovesBeratGreenfield0.000.28Korkis-2009 shpk not identifiedprivate22009operational<52012ProCredit Bank (Albania)InvestedYesLitigation case at the Tirana civil court in April 2015: Ramazan Toska; Aurel Toska; Shoqeria Belesova 1 Sh.p.k.; Shoqeria Silva
2003 Sh.p.k.; Shoqeria Korkis Sh.p.k. / Shoqeria Permbarimore Private Executores Litium Sh.p.k; Procredit Bank Sh.a.; Z.V.R.P.P. Tirane; Av.
Shtetit
http://ere.gov.al/doc/ere_annual_report_2011_en_web.pdf; https://webcache.googleusercontent.com/search?q=cache:3jNJs_kLn0UJ:gjykataeapelittirane.al/%3Ffq%3Dkerkim%26gj%3D%26menu%3D2%26kid%3D13%26start%3D12760+&cd=1&hl=en&ct=clnk&gl=cz, http://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
8
AlbaniaBishnica cascade / Bishnica 2BishnicePogradecGreenfield2.400HEC Bishnica 1,2 shpk not identifiedprivatesee Bishnica 1200835GUGLER Water Turbines GmbH (Austria)operational 5-102010Not identifiedhttp://www.ere.gov.al/doc/V_E_N_D_I_M_23.2010.pdf, http://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
9
AlbaniaBletezaSemanGramshGreenfield0.00Claubel sh.pknot identifiedprivateplannedN/ANonehttp://www.rtklive.com/sq/news-single.php?ID=159411
10
AlbaniaBogova (also Bogove or Bogoves) (Wonder Power)BogovaSkraparRehabilitationRegional Park

Other protected areaInside2.500Wonder Power shpknot identifiedprivateoperational>101988Not identifiedWonder Power Sh.A was advised by Haxhia & Hajdari attorneys in regard of a conflict between shareholders.

Mr. Sadik Llapashtica - AdministratorWonder Power sha.a September 2003 – March 2014
http://www.chambersandpartners.com/europe/firm/161201/haxhia-hajdari; https://al.linkedin.com/pub/sadik-llapashtica/3a/1a8/320; http://en.wonder-sha.com/rreth-nesh-2/; https://cdm.unfccc.int/filestorage/q/v/UVZTEC5X7L1JRNS09PYABQM6WH3F24.pdf/PDD.pdf?t=NE98bnA5bW84fDAr54gQFSu8W0HfXct1TF2f, http://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/, https://www.wbif.eu/content/stream//Sites/website/library/WBEC-REG-ENE-01-BR-1-Role-of-hydropower-04.12b.pdf, http://www.ere.gov.al/doc/rap_vjet_2009_derguar_ne_kuvend.pdf
11
AlbaniaBratila 1DevollGreenfield0.00115none yetnone yetpotentialN/ANonehttp://aea-al.org/wp-content/uploads/2014/07/study_on_assessment_of_res_potentials_in_albania.pdf, http://www.politiko.al/2017/07/potencialet-e-reja-per-energji-nga-uji-era-dhe-dielli/#http://www.politiko.al/wp-content/uploads/2017/07/energjia.jpg
12
AlbaniaBushtrica concession / Bushtrica 1 (also Bushtrice)CajeLibrazhdGreenfield
Shebenik-Jabllanice National Park
National Park

Other protected area
Inside0.004.2Doko sh.pknot identifiedprivate2017concession awardedN/ANoneConcession for Bushtrica 1 previously recorded as being held by Fatjon shpk.; Spahiu Gjanc shpk;, Ani shpk; Keanxho shpk; Fusha shpk.; Avel shpk; IRZ shpk; Construction Management Alleance Albania shpk; 2A Power obtained in 2009, assumed it is the same plant but with a new tender. Only Bustrica 1 announced as having a new concessionaire, not others in the cascade.http://aea-al.org/albanias-shala-river-is-also-granted-concession-hpp-100-million-usd-investment/, http://www.albeiti.org/wp-content/uploads/2016/02/Regjistri-i-kocensioneve-n%C3%AB-sektorin-e-hidroenergjitik.pdf, http://open.data.al/sq/corporates/view/id/REF-09833-
13
AlbaniaBorjes cascade / CernaleveBorjesCernaleve; KukesDuplicatenot identifiednot identified42009operational<5UnclearNot identifiedPossibly duplicate with Cernaleve 1 and 2http://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
14
AlbaniaCurraj-Epshem CurrajTropojeExistingCurrajOther protected area (protected landscape or nature monument)
Insidenot identifiednot identifiedoperational>101969N/Ahttps://www.wbif.eu/content/stream//Sites/website/library/WBEC-REG-ENE-01-BR-1-Role-of-hydropower-04.12b.pdf
15
AlbaniaDishniceDishnicaDishnice; KorceGreenfield0.20Dishnica Energy
shpk (also Dishnica Energji shpk)
not identifiedprivate12009Cheng Hsiung International Corporation (China)operational 5-102010Not identifiedhttp://www.ere.gov.al/doc/Annual_Report_2010_ENG.pdf
16
AlbaniaDragobia (also Dragobi) (old)ValbonaValbone; TropojeExistingValbona Valley National Park
National park
Insidenot identifiednot identifiedoperational>101969N/A
https://www.wbif.eu/content/stream//Sites/website/library/WBEC-REG-ENE-01-BR-1-Role-of-hydropower-04.12b.pdf
17
AlbaniaDragot-Tepelena (Dragoti)VjosaTepeleneGreenfieldVjosa

Other protected area (protected landscape or nature monument)Inside0.00130none yetnone yetpotentialN/ANot identifiedThe HPP is to impact the Uji I Ftohte-Tepelene Nature Monument and the Zheji Natural Park.http://aea-al.org/wp-content/uploads/2014/07/study_on_assessment_of_res_potentials_in_albania.pdf, http://www.monitor.al/soegrah-ja-25-hec-et-qe-propozohen-te-ndertohen-ne-vjose-kapaciteti-458-mw/, http://www.politiko.al/2017/07/potencialet-e-reja-per-energji-nga-uji-era-dhe-dielli/#http://www.politiko.al/wp-content/uploads/2017/07/energjia.jpg
18
AlbaniaDukagjin cascade / Dukagjin 1ShalaShkoderDuplicatenot identifiednot identifiedNot identifiedSee Shale cascade
• In 2007 the consortium comprised of Interenergo Albania shpk presented the government with the feasibility studies for "Dukagjin 1", "Dukagjini 2" and "Dukagjini 3" as an unsolicited proposal.
• Through Decision no. 757, dated 07.11.2007 "On the definition of contracting authority for the construction of hydropower stations" Dukagjin 1 "," 2 Dukagjini "and" Dukagjini 3 ", the Council of Ministers decided to start the bidding procedures for the project proposed by the Concessionaire. Through the decision no. 757, dated 07.11.2007 the Contracting Authority invited the participants to submit their offers for the use of all Shala River, without limiting the number of the plants that will be built.
• Following the completion of further studies on the economic, technical and environmental construction and operation of cascade hydropower plants in Shale River, concessionaire has submitted its bid dated 22.04.2008, proposing the construction of six (6) hydropower plants on the river Shale and the end of the competitive selection procedure has been rated as the best bidder.
• Concession for Shala river cascade was awarded based on the unsolicited proposal procedure.
• A concessionary contract dated the 2nd June, 2009 between the Ministry of Economy, Trade and Energy of the Republic of Albania, and the Contractor in the form of “BOT” for the Construction of works comprising the Design, Financing, Construction, Ownership, Operation, Maintenance and Transfer of a Hydro-power Plant Cascade on Shala River, Republic of Albania

Concession failure penalties:
Penalty holder: concessionare for the construction of the HPPs Gur Dukagjin 1 and Dukagjin 2; name blacked out in the document
Total penalty amount:185,385,187
Currency:LEK
Reason:"pay the penalty by the concessionaire for a term not dorёzim the project / implementation in amount
LEK 185,385,187 (242,275,519 0.005% x 10 LEK x 362 days)"
Penalty issued: December 2012
http://renewables.seenews.com/news/albania-licenses-22-hpps-as-producers-of-renewable-energy-351682; http://www.klsh.org.al/web/pub/ministrin_e_ekonomis_441_1.pdf; http://www.energjia.gov.al/files/userfiles/Strategjike/Lista_totale_e_HEC-eve_ne_prodhim_deri_fund_2014.pdf; http://www.qbz.gov.al/doc.jsp?doc=docs/Vendim%20Nr%20698%20Dat%C3%AB%2011-06-2009.htm, http://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
19
AlbaniaDukagjin cascade / Dukagjin 2ShalaShkoderDuplicatenot identifiednot identifiedNot identifiedSee Shale cascade
• In 2007 the consortium comprised of Interenergo Albania shpk presented the government with the feasibility studies for "Dukagjin 1", "Dukagjini 2" and "Dukagjini 3" as an unsolicited proposal.
• Through Decision no. 757, dated 07.11.2007 "On the definition of contracting authority for the construction of hydropower stations" Dukagjin 1 "," 2 Dukagjini "and" Dukagjini 3 ", the Council of Ministers decided to start the bidding procedures for the project proposed by the Concessionaire. Through the decision no. 757, dated 07.11.2007 the Contracting Authority invited the participants to submit their offers for the use of all Shala River, without limiting the number of the plants that will be built.
• Following the completion of further studies on the economic, technical and environmental construction and operation of cascade hydropower plants in Shale River, concessionaire has submitted its bid dated 22.04.2008, proposing the construction of six (6) hydropower plants on the river Shale and the end of the competitive selection procedure has been rated as the best bidder.
• Concession for Shala river cascade was awarded based on the unsolicited proposal procedure.
• A concessionary contract dated the 2nd June, 2009 between the Ministry of Economy, Trade and Energy of the Republic of Albania, and the Contractor in the form of “BOT” for the Construction of works comprising the Design, Financing, Construction, Ownership, Operation, Maintenance and Transfer of a Hydro-power Plant Cascade on Shala River, Republic of Albania
Concession failure penalties:
Penalty holder: concessionare for the construction of the HPPs Gur Dukagjin 1 and Dukagjin 2; name blacked out in the document
Total penalty amount:185,385,187
Currency:LEK
Reason:"pay the penalty by the concessionaire for a term not dorёzim the project / implementation in amount
LEK 185,385,187 (242,275,519 0.005% x 10 LEK x 362 days)"
Penalty issued: December 2012
http://www.klsh.org.al/web/pub/ministrin_e_ekonomis_441_1.pdf; http://www.qbz.gov.al/doc.jsp?doc=docs/Vendim%20Nr%20698%20Dat%C3%AB%2011-06-2009.htm, http://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
20
AlbaniaDukagjin cascade / Dukagjin 3ShalaShkoderDuplicatenot identifiednot identifiedNot identifiedSee Shale cascade
• In 2007 the consortium comprised of Interenergo Albania shpk presented the government with the feasibility studies for "Dukagjin 1", "Dukagjini 2" and "Dukagjini 3" as an unsolicited proposal.
• Through Decision no. 757, dated 07.11.2007 "On the definition of contracting authority for the construction of hydropower stations" Dukagjin 1 "," 2 Dukagjini "and" Dukagjini 3 ", the Council of Ministers decided to start the bidding procedures for the project proposed by the Concessionaire. Through the decision no. 757, dated 07.11.2007 the Contracting Authority invited the participants to submit their offers for the use of all Shala River, without limiting the number of the plants that will be built.
• Following the completion of further studies on the economic, technical and environmental construction and operation of cascade hydropower plants in Shale River, concessionaire has submitted its bid dated 22.04.2008, proposing the construction of six (6) hydropower plants on the river Shale and the end of the competitive selection procedure has been rated as the best bidder.
• Concession for Shala river cascade was awarded based on the unsolicited proposal procedure.
• A concessionary contract dated the 2nd June, 2009 between the Ministry of Economy, Trade and Energy of the Republic of Albania, and the Contractor in the form of “BOT” for the Construction of works comprising the Design, Financing, Construction, Ownership, Operation, Maintenance and Transfer of a Hydro-power Plant Cascade on Shala River, Republic of Albania
http://www.qbz.gov.al/doc.jsp?doc=docs/Vendim%20Nr%20698%20Dat%C3%AB%2011-06-2009.htm
21
AlbaniaDunice HPPS cascade / DuniceKalivac/Dolisti or DuniceGreenfield2.87Hec Dunice shpknot identifiedprivate52009concession awardedN/ANot identifiedHEC-i DUNICE Shpk was a plaintiff in a 22.07.2013 litigation case involving Ministry of Economy, Trade and Energy and Trebinje community demanding indemnification for cancelling the concession contract.

Concession failure penalties:
Penalty holder: concessionare for the construction of the HPPs Trebinja 1, Trebinja 2, Potgozhan, Kalivac and Dunice; name blacked out in the document
Total penalty amount:see Trebinje 1
Currency:see Trebinje 1
Reason:pay LEK 11,939,820 (00:05% x 175,585,602 ALL
(value from the investment without committing x 136 day (for the period 17/08/2011 to 31/12/2011)
Penalty issued: December 2012
http://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/, http://www.azht.gov.al/files/news_files/Dokumenti_i_rregullores_i_miratuar_vendimi_nr_2.pdf, http://www.ere.gov.al/doc/Njoftim_09.02.2018.pdf
22
AlbaniaGostime cascade / Egnatia ShushiceGostime (also Gostima)LibrazhdGreenfieldRegional Park

Other protected areaInside65.63Vëllezërit Tola; Arti shpk;
GPA Konstruksion shpk
not identifiedprivate112013Cheng Hsiung International Corporation (China)concession awardedN/ANot identifiedThe former Prime Minister, Ilir Meta, was accused by the then Minister of Economy, Dritan Prifti, of asking him to favour a business in the tender procedure for the Egnatia Shushice hydropower concession. As a reward they would be paid with EUR 700,000 and a 7 percent share in the plant. Ilir Meta was also accused of taking a EUR 1 million bribe together with Dritan Prifti for favouring a business in a tender of crude oil.

A year after the scandal, the same company involved in the corruption scandal - “Vëllezërit Tola” owned by Agim Rrapaj - won the concession.

Gostime river falls under the Managed Nature Reserve.

Egnatia Association and a group of specialists have proposed that this area be expanded. Citizens of Gaferr and Sopot villages protesting against construction of HPPS due to the concerns over interference with the Shebenik-Jabllanice National Park.

In January 2014 Librazh Municipality annulated concessions for 11 HPPs.


the project was offered for investment

http://www.senior-a.al/index.php/wp6-small-grants-to-env-csos-networks/16-newsinformation/wp6-newsinformations/122-vazhdon-shakterrimi-i-lumit-te-gostimes-ne-gaferr-te-librazhdit; http://www.senior-a.al/index.php/wp6-small-grants-to-env-csos-networks/16-newsinformation/wp6-newsinformations/198-librazhd-anullohen-11-hec-e; http://www.arkivalajmeve.com/Ndertimi-i-HEC-it-banoret-e-Zerqanit-vijojne-protestat.1047531326/; https://www.youtube.com/watch?v=X1-tluM4jTs&feature=share; http://top-channel.tv/lajme/artikull.php?id=279549ů http://gazeta-shqip.com/lajme/2012/08/25/mbyllet-pas-5-vjetesh-tenderi-i-video-skandalit/
23
AlbaniaElbasan 1Unclearnot identifiednot identifiedunclearN/ANo information found
24
AlbaniaDrin River cascade /
Fierza (also Fierze)
DrinTropoja (also Tropoje)Rehabilitation
500.00Korporata Elektroenergjitike Shqiptare sh.a (KESH)not identifiedpublicoperational>101978International Development Agency (IDA)Signedsee Drin River cascade / KomaniSwiss Agency for Development & Co-operation (SDC)YesRehabilitation of Komani, Fierza and Vau i Dejes HPPS was financed under:
1/ World Bank's Energy Community of South East Europe APL Program – the APL 5 for Albania Dam Safety Project (a part of a larger Dam Safety program financed in parallel by other international financial institutions (IFIs) such as SECO-Switzerland, KfW Germany, the European Bank for Reconstruction and Development (EBRD), and the Government of Albania).

2/ World Bank's DAM SAFETY - ADDITIONAL FINANCING
http://www.worldbank.org/projects/P110481/energy-community-south-east-europe-apl-program-apl-5-albania-dam-safety?lang=enhttps://www.wbif.eu/content/stream//Sites/website/library/WBEC-REG-ENE-01-BR-1-Role-of-hydropower-04.12b.pdf
25
AlbaniaDrin River cascade /
Fierza (also Fierze)
Existingnot identifiednot identifiedInternational Bank for Reconstruction and Development (IBRD)Signedsee Drin River cascade / KomaniKreditanstalt für Wiederaufbau (KfW)Yeshttps://www.wbif.eu/content/stream//Sites/website/library/WBEC-REG-ENE-01-BR-1-Role-of-hydropower-04.12b.pdf
26
AlbaniaDrin River cascade /
Fierza (also Fierze)
Existingnot identifiednot identifiedEuropean Bank for Reconstruction and Development (EBRD)Completedcredit1.45Yeshttps://www.wbif.eu/content/stream//Sites/website/library/WBEC-REG-ENE-01-BR-1-Role-of-hydropower-04.12b.pdf
27
AlbaniaGizaveshLibrazhd
GreenfieldShebenik-Jabllanice National Park

National parkInside0.500Dosku Energy
shpk
not identifiedprivate20113027.07.2041 operational 5-102011Not identifiedhttp://www.ere.gov.al/doc/%281%29ere_annual_report_2011.pdf, http://www.ere.gov.al/doc/Raporti_Vjetor_2016.pdf
28
AlbaniaGjancOsumi or LeshnjeKorceRehabilitation
2.960Spahiu Gjanc
shpk.
Mr. Dalip Spahiu100%private

Kossler Gmbh (part of Voith Siemens) (Austria); Schubert Gmbh (Austria); SGA jsc (Albania)operational>101991Not identifiedBuilt in 1988-1991; put in operation in 1991 as state property administered by KESH. Spahiu-Gjanc Ltd in 2003-2007 invested in the full technical rehabilitation of the hydro power plant and in the 2011 – 2013 in the total rehabilitation and expansion of the 7km long water intake channel

Feasiblity study for the expansion of the Gjanc HPP undertaken in February 2012

Financial offer for sale of the Gajnc HPP issued in March 2013

In possible conflict for water with the Gjanci reservoir which ensures irrigation of Korca lowland
http://www.premiereservices.al/assets/vendor/pdf/Finacial-Offer-Gjanc-HPP.pdf; http://www.southeast-europe.net/document.cmt?id=243
29
AlbaniaGrabove (also Grabova)GrabovesGramshUnclearAgna Groupnot identifiedprivate12 or 7 or 5SGA jsc (Albania)potentialN/A45NoneSGA jsc part of consortiumhttp://www.agnagroup.com/new/foto/uploads/File/Projekti%20GRABOVES.pdf
30
AlbaniaGur Shpat cascade / Gur Shpat 1 (Gurshpat 1)GreenfieldShkumbin tributary

Other protected area (protected landscape or nature monument)Inside0.800Gurshpate Energy shpknot identifiedprivate2200935operational<52015Not identifiedOn November 17, 2014, 8 people were charged with the attack against police during the July protests in the village of Polis (Librazhd) against the Gur Shpat 2 HPP. The protesters called for halting the construction of Gur Shpat 1 HPP that has taken away drinking water and water for irrigation.

The village has no running water and uses wells.

On August 10, 2013 around 600 citizens of Polis and other villages protested against the construction of the second Gur Shpat 2 HPP complaining the project will take away the water supply for subsistance agriculture. They also complained they had not been informed of the concession and the planned developments.

Gur shpat 1 was approved by the Municipality in 2006 under the condition that the project moves 15 meters from the irrigation canal. Gur shpat 1 has affected fishermen as it leaves little water in the basin. Allegedly, the Gur Shpat 2 was not approved by the Municipal council.

Allegedly, villagers accused of protests against Gur Shpat 2 were left in jail for months without standing a trial, they were beaten and emerged bloodied from prison.

Allegedly, the village of Polis had a fund of 35 million LEKE for the construction of a drinking water supply, out of which 4 million LEKE were used for equipment and material. THe project was however suspended.

Concession failure penalties:
Penalty holder: "concessionare for the construction of the HPPs Gur
Shpat 1 and Gur Shpat 2; name blacked out in the document"
Total penalty amount: 1,331,000
Currency:LEK
Reason:"pay penalty in the amount of 1,331,000 LEK (0.005
% X 176,738,773 LEK x 149 days)"
Penalty issued: December 2012
http://www.arkivalajmeve.com/Nje-HEC-i-dyte-ne-perroin-e-Gur-Shpatit-protestojne-banoret-Ska-uje.1047421181/; https://ekolevizja.wordpress.com/2014/11/17/burg-per-fshataret-qe-mbrojne-ujin/; http://www.klsh.org.al/web/pub/ministrin_e_ekonomis_441_1.pdf, https://www.wbif.eu/content/stream//Sites/website/library/WBEC-REG-ENE-01-BR-1-Role-of-hydropower-04.12b.pdf, http://www.ere.gov.al/doc/Raporti_Vjetor_2016.pdf
31
AlbaniaGur Shpat cascade / Gur Shpat 2 (Gur Shpat 2)GreenfieldShkumbin tributary

Other protected area (protected landscape or nature monument)Inside0.800Gurshpate Energy shpknot identifiedprivatesee Gur Shpat 1200935operational<52015Not identifiedOn November 17, 2014, 8 people were charged with the attack against police during the July protests in the village of Polis (Librazhd) against the Gur Shpat 2 HPP. The protesters called for halting the construction of Gur Shpat 1 HPP that has taken away drinking water and water for irrigation.

The village has no running water and uses wells.

On August 10, 2013 around 600 citizens of Polis and other villages protested against the construction of the second Gur Shpat 2 HPP complaining the project will take away the water supply for subsistance agriculture. They also complained they had not been informed of the concession and the planned developments.

Gur shpat 1 was approved by the Municipality in 2006 under the condition that the project moves 15 meters from the irrigation canal. Gur shpat 1 has affected fishermen as it leaves little water in the basin. Allegedly, the Gur Shpat 2 was not approved by the Municipal council.

Allegedly, villagers accused of protests against Gur Shpat 2 were left in jail for months without standing a trial, they were beaten and emerged bloodied from prison.

Allegedly, the village of Polis had a fund of 35 million LEKE for the construction of a drinking water supply, out of which 4 million LEKE were used for equipment and material. The project was however suspended.

Concession failure penalties:
Penalty holder: "concessionare for the construction of the HPPs Gur Shpat 1 and Gur Shpat 2; name blacked out in the document"
Total penalty amount: see Gur Shpat 1
Reason:"pay penalty in the amount of 1,331,000 LEK (0.005% X 176,738,773 LEK x 149 days)"
Penalty issued: December 2012
http://www.arkivalajmeve.com/Nje-HEC-i-dyte-ne-perroin-e-Gur-Shpatit-protestojne-banoret-Ska-uje.1047421181/; https://ekolevizja.wordpress.com/2014/11/17/burg-per-fshataret-qe-mbrojne-ujin/; http://www.klsh.org.al/web/pub/ministrin_e_ekonomis_441_1.pdf, https://www.wbif.eu/content/stream//Sites/website/library/WBEC-REG-ENE-01-BR-1-Role-of-hydropower-04.12b.pdf, http://www.ere.gov.al/doc/Raporti_Vjetor_2016.pdf
32
AlbaniaBistrica 1 and 2 cascade /
Bistrica 1
BistricaDelvine; Vlore; SarandaRehabilitation22.50Hec Bistrica 1
dhe 2 sha
Kurum International sha (owned by Kurum Holding A.S.)Turkey100 %private220113005.12.2041operational>101970106International Finance Corporation (IFC)Signedcreditsee Bistrica 2Odeabank, Banka Kombetare Tregtare, Raiffeisen Bank AlbaniaInvestedBlack Sea Trade and
Development Bank
18 (BSTDB); 27 (FMO)Yessee Bistrica 2http://ifcext.ifc.org/IFCExt/spiwebsite1.nsf/78e3b305216fcdba85257a8b0075079d/ec98d972d9675d2385257b5c005f80b4?opendocument; http://ifcext.ifc.org/IFCExt/Pressroom/IFCPressRoom.nsf/0/DADCA1B9C06638CB85257C4700354AE5; http://www.google.cz/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0CCAQFjAA&url=http%3A%2F%2Fwww.cao-ombudsman.org%2Fcases%2Fdocument-links%2Fdocuments%2FCAOComplaint.pdf&ei=lWbwVO6iBsGBUeylgYAB&usg=AFQjCNERrqFHwxcns-j_-HjW99xtgkSM9g&sig2=BQtZ7amXYoQbrwvO5xcWuw&bvm=bv.87269000,d.d24; https://webcache.googleusercontent.com/search?q=cache:yNK3GadtiRIJ:www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2013/05/27/000445729_20130527123345/Rendered/INDEX/751730AR0Alban0Box0377295B00PUBLIC0.txt+&cd=14&hl=en&ct=clnk&gl=cz; http://www.offene-entwicklungshilfe.de/sector/71/230/; http://telegraf.al/aktualitet/pas-privatizimit-kurum-heq-nga-puna-punonjesit-e-hec-eve-bistrica-1-dhe-2
33
AlbaniaBistrica I and II cascade /
Bistrica 2
BistricaDelvine; Vlore; SarandaRehabilitationOther protected areaInside5.00Hec Bistrica 1
dhe 2 sha
Kurum International sha (owned by Kurum Holding A.S.)Turkey100 %private20113005.12.2041operational>101970120International Finance Corporation (IFC)Signedcredit33.00Odeabank, Banka Kombetare Tregtare, Raiffeisen Bank AlbaniaInvestedNetherlands Development Finance Company (FMO)see Bistrica 1
YesOriginal currency MDB finance: 44.91 mil. USD

Uleza, Shkopeti, Bistrica I, and Bistrica II HPPS were privatized through an international competitive bid in December 2012. Kurum International sha won the bid by offering a total amount of EUR 109.5 million. Privatisation involved sale of 100% of the share capital of the energy companies held by the Ministry of Economy Trade and Energy to Kurum International. Through this Project, Kurum International contemplates reducing its electricity purchase costs (a significant production cost item).

As of April 30, 2013, HEC Bistrica 1 & Bistrica 2 SH.A. operates as a subsidiary of Kurum International Sh. A. Kurum International sha purchased 100 percent of the shares "HEC Bistrica 1 and Bistrica 2" shkp worth EUR 52,000,000 (fifty two million).

The debt facility includes a €33 million loan for IFC’s own account and €73
million of financing syndicated to a diverse group of commercial banks and developmental finance institutions. The financing includes B Loans of €27 million from FMO (Netherlands Development Finance Company), and €14 million from Odeabank. It includes parallel loans of €18 million from the Black Sea Trade and Development Bank, €7 million from Banka Kombetare Tregtare and €7 million from Raiffeisen Bank Albania.

IFC has consulted the Government of Albania for the sale and privatization of the HPPs of Ulëz, Shkopet, Bistrica 1 and Bistrica 2. According to a GoA document, “GoA has hired the IFC as its financial advisor for the implementation of this transaction.” IFC will receive a success fee equal to 420.000 Euros for the sale of Bistrica 1 & 22 and 430.000 Euros as a success fee for the sale of Ulëz Shkopet.

Bistrica 1 and 2 were supported under the World Bank's IBRD/IDA Trust Funds:
Assessments of Bistrica 1, Bistrica 2 are listed among Active Bank-executed trust
fund (BETF) Grants in, FY11 - FY13 Q2; ID:TF011752 under PPIAF program,
Grant agreement date: 02/02/2012; Closing date: 09/30/2012; Costs: 0.07

In 2008, BMZ provided ODA loan of 347.778 USD for the Electricity supply South Albania Bistrica II project. In 2008, KfW provided ODA loan of 4.464.255 USD for the Electricity supply South Albania Bistrica II project.Projects focused on the rehabilitation of two major Hydro Power Plants in Bistrica and the respective expansion of the transmission and distribution grid.

In August 2013 workers protested against the privatisation and dismissal of 25 workers from the job. They complained the firing of workers constitutes a violation of the collective agreement, the Labour Code and of the Constitution of Albania. Other employees, through their reactions, have noted that they have been harassed to sign a form for dismissal.

Rehabilitation in 2013.
http://ifcext.ifc.org/IFCExt/spiwebsite1.nsf/78e3b305216fcdba85257a8b0075079d/ec98d972d9675d2385257b5c005f80b4?opendocument; http://ifcext.ifc.org/IFCExt/Pressroom/IFCPressRoom.nsf/0/DADCA1B9C06638CB85257C4700354AE5; http://www.google.cz/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0CCAQFjAA&url=http%3A%2F%2Fwww.cao-ombudsman.org%2Fcases%2Fdocument-links%2Fdocuments%2FCAOComplaint.pdf&ei=lWbwVO6iBsGBUeylgYAB&usg=AFQjCNERrqFHwxcns-j_-HjW99xtgkSM9g&sig2=BQtZ7amXYoQbrwvO5xcWuw&bvm=bv.87269000,d.d24; https://webcache.googleusercontent.com/search?q=cache:yNK3GadtiRIJ:www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2013/05/27/000445729_20130527123345/Rendered/INDEX/751730AR0Alban0Box0377295B00PUBLIC0.txt+&cd=14&hl=en&ct=clnk&gl=cz; http://www.offene-entwicklungshilfe.de/sector/71/230/; http://telegraf.al/aktualitet/pas-privatizimit-kurum-heq-nga-puna-punonjesit-e-hec-eve-bistrica-1-dhe-2
34
AlbaniaVegjelUnclearnot identifiednot identifiedunclearN/ANo information found
35
AlbaniaShkopetit 1+2 (see Ulze and Shkopet cascade)Duplicate
not identifiednot identifiedunclearN/ADuplicate: see Ulze and Shkopet cascadehttp://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
36
AlbaniaHolteDuplicateDevoll tributary

Other protected area (protected landscape or nature monument)Insidenot identifiednot identifiedN/APossibly duplicate with Holta Kabash and Holta Porocanhttp://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
37
AlbaniaKalivacVjosaGreenfield111366622.856SHOQERIA KONCENSIONARE AYEN - ALBAyen Enerji [BIST:AYEN] and Fusha Sh.p.k. TurkeyAYDINER INSAAT ANONIM STIprivate35
concession awardedN/A125.3Deutsche BankCancelledNoneThe ministry broke off a concession contract for the Kalivac power plant with the Italian company BEG which agreed to build a 108 MW hydropower plant in 2012 but failed to complete the project. BEG filed law suits against a number of local subcontractors.

Capacity: 90 (Ministry). 130 (Bechetti). 108 (Enel).

Deutsche Bank funded the works for two years, until 2009, and then left. As a result Kalivac HPP project suffered a blockage in loans that Deutsche Bank had committed to deliver and that forced BEG to refinance the project directly. As of November 2012, BEG paid cca EUR 80,000,000.00 for the realization of the project and amount to about 40% of the total work.

BEG sued Deutsche Bank.

Lack of employment contracts, salaries and social security has forced workers on the Kalivac HPP to stage protests, supported by the residents of the village on December 7, 2013. According Astrit Dervish, head of the municipality of Krahës, construction of HPP for years has caused problems in the lives of residents. Police arrested four citizens for illegal rally.
https://balkangreenenergynews.com/albania-published-tender-for-hpp-kalivac/
https://invest-in-albania.org/consortium-wins-bid-kalivac-hpp-vjosa-river/
http://www.energjia.gov.al/al/njoftime/deklarata-per-shtyp/shpallja-e-rezultatit-te-procedures-konkurruese-per-ndertimin-e-hec-it-kalivac
https://www.kap.org.tr/en/sirket-bilgileri/ozet/872-ayen-enerji-a-s
http://open.data.al/opencorporate/agreements/Fituesi_Kalivac.pdf

http://www.begspa.com/eng/idroelettrico.htm; http://www.corriere.it/notizie-ultima-ora/Economia/Enel-Beg-Cerroni-Becchetti-chiede-430mln-sentenza-Albania/23-05-2012/1-A_001599062.shtml; http://www.pietrangeli.com/kalivac-gravity-dam-design-hydropower-albania-europe#; http://www.seaconsult.eu/dmdocuments/cv_sea_en_2013.pdf; http://www.news.balkanenergy.com/files/EnergyNews_2007_III_2.pdf; http://www.manliocerroni.it/wp-content/uploads/2014/06/21giugnorispostabeg.pdf
http://www.ilgiornale.it/news/politica/becchetti-litaliano-quante-ombre-sul-re-delle-antenne-1076258.html; http://www.lanotiziagiornale.it/tirana-non-vede-le-inchieste-sberla-di-cerroni-allenel-gli-affari-del-re-delle-discariche-in-albania-passo-avanti-nel-contenzioso-da-430-milioni/; http://www.latuavoce.it/notizie/stampabile.asp?id=51698; http://www.google.cz/url?sa=t&rct=j&q=&esrc=s&source=web&cd=8&ved=0CFQQFjAH&url=http%3A%2F%2Fvizionplus.al%2Ftepelene-punetoret-ne-proteste-per-pagat%2F&ei=KDLwVJamCISrU92DgLAJ&usg=AFQjCNGiAS_K1QorLFHrJgHqv8F0Wo5Euw&sig2=tCE9qYJ6xwXsuDf8wcgJMw&bvm=bv.87269000,d.d24&cad=rja; https://www.youtube.com/watch?v=lPxb6eCJpj0; http://abkons.com/en/kalivac-green-energy/
38
AlbaniaKaludhVjosaUnclearVjosa

National strict protected area

Emerald
Inside75not identifiednot identifiedunclearN/Ahttps://www.energy-community.org/portal/page/portal/ENC_HOME/DOCS/36341/0633975AA1057B9CE053C92FA8C06338
39
AlbaniaKelcyre (also Kelcyra)VjosaExistingVjosa

Other protected area (protected landscape or nature monument)Inside0.000not identifiednot identifiedoperational>101978N/AThe HPP has impact on the Zheji Natural Park.https://www.wbif.eu/content/stream//Sites/website/library/WBEC-REG-ENE-01-BR-1-Role-of-hydropower-04.12b.pdf
40
AlbaniaKlosShengjinFan; Lezhe; MirditeGreenfield1.520Malido-Energji
shpk
not identifiedprivate120093022.10.2039 operational<52012Not identifiedhttp://www.energjia.gov.al/files/userfiles/Strategjike/Lista_totale_e_HEC-eve_ne_prodhim_deri_fund_2014.pdf
41
AlbaniaDrin River cascade / Komani (also Koman)DrinShkodra (also Shkoder)Rehabilitation0.00600Korporata Elektroenergjitike Shqiptare sh.a (KESH)not identifiedpublicoperational>101985European Bank for Reconstruction and Development (EBRD)Signedcredit12.70Swiss Agency for Development & Co-operation (SDC)YesRehabilitation of Komani, Fierza and Vau i Dejes HPPS was financed under:
1/ World Bank's Energy Community of South East Europe APL Program – the APL 5 for Albania Dam Safety Project (a part of a larger Dam Safety program financed in parallel by other international financial institutions (IFIs) such as SECO-Switzerland, KfW Germany, the European Bank for Reconstruction and Development (EBRD), and the Government of Albania).

2/ World Bank's DAM SAFETY - ADDITIONAL FINANCING
http://www.worldbank.org/projects/P110481/energy-community-south-east-europe-apl-program-apl-5-albania-dam-safety?lang=en
42
AlbaniaDrin River cascade / Komani (also Koman)Existingnot identifiednot identifiedInternational Development Agency (IDA)SignedKreditanstalt für Wiederaufbau (KfW)YesOriginal currency MDB finance: portion of 35.30 mil. USD.

project financed along other projects under the Energy Community of South East Europe APL Program - APL 5 for Albania DAM SAFETY
http://www.worldbank.org/projects/P110481/energy-community-south-east-europe-apl-program-apl-5-albania-dam-safety?lang=en
43
AlbaniaDrin River cascade / Komani (also Koman)Existingnot identifiednot identifiedInternational Bank for Reconstruction and Development (IBRD)SignedYesOriginal currency MDB finance: portion of 21.6 mil. USD.

project financed along other projects under the Energy Community of South East Europe APL Program - APL 5 for Albania DAM SAFETY
http://www.worldbank.org/projects/P110481/energy-community-south-east-europe-apl-program-apl-5-albania-dam-safety?lang=en
44
AlbaniaKryezi 1 and Kryezi i Eperm cascade / Kryezi 1Perroi i madhGjegjan; Puke; ShkoderGreenfield0.600Bekim Energjetik shpknot identifiedprivate2200935operational<52013Not identifiedhttp://www.ere.gov.al/doc/Annual_Report_2013.pdf
45
AlbaniaKukur 2Duplicatenot identifiednot identifiedunclearN/AN/ADuplicate: see Kukur cascade / Kukur 2http://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
46
AlbaniaLajthize and Mullias concession / LajthizeLajthizeGreenfield0.004.485Merga shpknot identifiedprivate32009unclearN/ANoneNot clear if concession still valid, not listed in 2016 EITI report.http://www.albeiti.org/wp-content/uploads/2014/03/EITI-FINAL_2013-2014_FINAL_ALB.pdf
47
AlbaniaLanabregas 1+2Existing5.000HPP LanabregasUjesjelles-Kanalizime Tirane100public200930
25/03/2039
operational>10UnclearN/AThe Albanian Public Water Supply Company acquired Lanabregas HPP for EUR 15 million in May 2012http://www.energetika.net/eu/novice/oil-and-oil-derivatives/albanian-public-water-supply-company-acquires-hec-lanabregas; http://www.ikub.al/LIGJE/1201300165/Article-PeR-LICENCIMIN-E-SHOQeRISe-HEC-LANABREGAS-SHA-Ne-AKTIVITETIN-E-PRODHIMIT-Te-ENERGJISe-ELEKTRIKE-NGA-HEC-LANABREGAS.aspx
48
AlbaniaLubonjeLubonjaKorceGreenfield0.300Elektro Lubonje
shpk (also Elektro Lubonja shpk)
not identifiedprivate12009Cheng Hsiung International Corporation (China)operational 5-102010Not identifiedhttp://www.ere.gov.al/doc/Raporti_Vjetor_2016.pdf, http://www.ere.gov.al/doc/Annual_Report_2010_ENG.pdf
49
AlbaniaLure cascade (also Lura) / Lure 1Water intake: +1057.89 Molla lura RiverLure; DiberGreenfieldLura

National strict protected area

Emerald
Inside6.54Erdat Lura shpkErdatItalyEtea Rinnovabiliprivate32009Euro Lines shpk (Albania); Andritz Group (Austria); Etea Group (Italy); Eltech srl (Italy) operational 5-102012
Banca IntesaInvested7.5YesThe plant is located outside of the national park, however with direct impacts on it as it takes water from the Big Lake located in the core zone of the Lura NP.

Controversial deforestation linked with the project.

Loan taken via several daughter companies of Etea group.

Project designer Dekliada mentions that the project is financed by the EBRD.
http://www.eurolinesalbania.com/#!project/cngp; http://dekliada-alb.al/en/lure-cascade-hpp

http://www.qkb.gov.al/umbraco/Surface/SearchSurface/DownloadDocument?documentCode=E8DDD8B3-1A5A-42A4-A8D3-A3DF8BB39E2D

http://dekliada-alb.al
50
AlbaniaLure cascade (also Lura) / Lure 2Water intake: +878 Molla lura RiverLure; DiberGreenfieldLura

National ParkOutside4.02Erdat Lura shpkErdatEtea Rinnovabiliprivatesee Lure 12009Euro Lines shpk (Albania); Andritz Group (Austria); Etea Group (Italy); Eltech srl (Italy) operational 5-102012Banca IntesaInvestedYesSee Lure 1See Lure 1
51
AlbaniaLure cascade (also Lura) / Lure 3Water intake: +878 Arre molla RiverLure; DiberGreenfieldLura

National ParkOutside5.66Erdat Lura shpkErdatEtea Rinnovabiliprivatesee Lure 12009Euro Lines shpk (Albania); Andritz Group (Austria); Etea Group (Italy); Eltech srl (Italy) operational 5-102012Banca IntesaInvestedYesSee Lure 1See Lure 1
52
AlbaniaMallkasterra (also Mallkaster)Zalli i OkshtunitGreenfield0.0030.65Mix Tecnic, 2 T, Perxhola,Albadi, UDSA , ME-AJ,
shpk
not identified102009unclearN/ANoneNot clear if concession still valid, it is not mentioned on eg. the EITI 2016 list.http://www.ecoalbania.org/wp-content/uploads/2017/05/HPPs_al_final-report_me-kapak.pdf
53
AlbaniaDevoll cascade /
Moglice
DevollMoglice commune; Korca DistrictGreenfield0.00172455Devoll Hydropower Sh.A.Statkraft AS Norway100%privatesee Banje2009Norplan (Norway), Alstom (France), Sweco (Sweden), AF-Consult Switzerland; Limak Construction Group (Turkey); Norconsult (Norway)under constructionN/AEUR
300300
Not identified"Originally developed under JV between Statkraft and EVN. In March 2013, Norwegian Statkraft AS and Austrian EVN AG signed an agreement by which Statkraft acquired EVN’s 50 percent stake in Devoll Hydropower ShA.

Investments in a group company, Statkraft Markets B.V., Amsterdam/Netherlands, were increased by EUR 51.2 million in 2013. The investment in Statkraft Markets B.V. was made to provide financing for a power plant construction by one of its subsidiaries: Devoll Hydropower Sh. A., Tirana/Albania.

Workers protests against working conditions in August 2014: http://www.devollhydropower.al/new/?p=8441. This was the second time within 3 months Banja hydropower plant workers protested against low wages and fulfilling the conditions at work. When the decision was taken to boycott work, workers were threatened by police officers called by representatives of the firm ""Limak.

CDM project

Rockslide kills three working on Albania's Moglice hydropower project in June 2014

Norwegian company Statkraft has so far invested EUR 150 million in the construction of Moglice hydro power plant....Additional EUR 150 million will be invested before completion,
http://www.statkraft.de/Statkraft/Documents/de/Investor%20Relations/Anual%20Report%202013%20Statkraft%20Markets%20GmbH_Web%20Vers._ENGLISH.pdf; http://www.limak.com.tr/sectors/construction/projects/dams
http://balkangreenenergynews.com/statkraft-invested-eur-150-million-construct-hpp-moglice/
54
AlbaniaLajthize and Mullias concession / MulliasMulliasGreenfield0.00see LajthizeMerga shpknot identifiedprivatesee Lajthize2009unclearN/ANoneNot clear if concession still valid, it is not mentioned on eg. the EITI 2016 list.http://www.albeiti.org/wp-content/uploads/2016/02/Regjistri-i-kocensioneve-n%C3%AB-sektorin-e-hidroenergjitik.pdf
55
AlbaniaMurdhar 1 and 2 cascade /
Murdhar 1
Murdhari or ZallitGreenfield0.002.68HydroEnergy shpkSOL spaItaly75%private22009Unitec Studio Projekt Ltd (Albania)operational<52014Not identifiedhttp://www.sol.it/english/bil2013.pdf; http://www.sol.it/english/bil2011.pdf, http://www.ere.gov.al/doc/Annual_Report_2014.pdf, https://www.wbif.eu/content/stream//Sites/website/library/WBEC-REG-ENE-01-BR-1-Role-of-hydropower-04.12b.pdf
56
AlbaniaPeqinGreenfield0.004.1HEC Peqin shpknot identifiedprivate12009potentialN/ANoneOn November 11, 2011, the Ministry of Economy cancelled concession deal with HEC-I Peqin for the construction and upgrade of hydro power plant as the concessionaire failed to meet the contractual obligations. However it still appears on later EITI lists of concessions. http://renewables.seenews.com/news/albania-cancels-12-hydro-power-plant-concession-deals-209853, http://www.albeiti.org/wp-content/uploads/2016/02/Regjistri-i-kocensioneve-n%C3%AB-sektorin-e-hidroenergjitik.pdf, http://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
57
AlbaniaPermetVjosaUnclearVjosa

Other protected area (protected landscape or nature monument)Insidenot identifiednot identifiedunclearN/ANo information found
58
AlbaniaSkavica cascade / Skavica 1DrinUnclear0.00130not identifiednot identifiedplannedN/A538European Bank for Reconstruction and Development (EBRD)PlannedcreditN/AIn September 2014, KESH met with Turkish companies "Suzer Group" and "Nurol Holding" about possible investment in the Skavica HPP.

Tassara-Geoteca Progetti-Kinglor Consortium listed as a promoter of the project in some documents.

The current scheme probably consists of two plants (see also Skavica 2). EBRD is a lead MDB administering the WBIF grant for developing appropriate studies.
http://www.skyscrapercity.com/showthread.php?t=326771; http://aea-al.org/wp-content/uploads/2014/07/study_on_assessment_of_res_potentials_in_albania.pdf; http://gazetamendimi.com/dy-kompani-turke-te-gatshme-te-investojne-per-hec-skavica/; http://www.jci-plant.or.jp/010jci/pdf/H21_ENE-1-B-albania-Report.pdf
https://www.wbif.eu/wbif-projects/details?code=PRJ-ALB-ENE-008&ogtitle=Skavica%20Hydro%20Power%20Plant&ogdescription=PRJ-ALB-ENE-008&ogimage=Sites/website/projects/PRJ-ALB-ENE-008/Skavica%20HPP.bmp
59
AlbaniaPicar 1Gurra or Reza e KolonjesKolonjeGreenfieldOther protected areaInside0.200Peshku Picar 1 shpknot identifiedprivate12009operational 5-102011Not identified2011 assumed date based on ERE reportshttp://www.ere.gov.al/doc/Raporti_Vjetor_2016.pdf, http://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/, http://www.ere.gov.al/doc/Annual_Report_2013.pdf
60
AlbaniaPocemVjosaGreenfieldKOVLU ENERGJIÇINAR-SAN HARFIYAT NAKLIYAT INSAAT TURIZM
SANAYI VE TICARET LIMITED SIRKETI
AYEN ENERJI
TurkeyplannedN/ANot identifiedOn 3/5/2017 Albanian Administrative Court ruled that the EIA as well as the public consultation process, was highly deficient.http://open.data.al/opencorporate/agreements/Pocem.pdf
https://www.euronatur.org/en/news/detail/news/dam-project-stopped-for-the-present/
61
AlbaniaPrelleUrakeMat; DiberGreenfield14.970PRELL ENERGYEndi-E Italy, AlbaniaG & C HYDROPOWERprivate2013operational<52016Banca IntesaInvested8Not identifiedSeems there was an older version of the project with 2 plantshttp://azure.ikub.al/LIGJE_CATEGORY/17/12/20/MBI-LICENCIMIN-E-SHOQeRISe-PRELL-ENERGY-SHPK-Ne-AKTIVITETIN-E-PRODHIMIT-Te-ENERG-0078.aspx

http://www.opencorporates.al/sq/nipt/l17610901s

http://www.qkb.gov.al/umbraco/Surface/SearchSurface/DownloadDocument?documentCode=68FDBDF9-77B8-44C7-8FE6-FE1AD3854AB4, http://www.ere.gov.al/doc/Raporti_Vjetor_2016.pdf, http://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
62
AlbaniaQukes concession - Qukes 3ShkumbinElbasanGreenfieldShkumbin

Other protected area (protected landscape or nature monument)Inside0.002.9Qukes Powernot identifiedprivate92011concession awardedN/ANot identifiedQukes 1 and 2 are in another concession. Not clear whether concession is still valid, plants do not seem to have been builthttp://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
63
AlbaniaQukes concession - Qukes 4ShkumbinElbasanGreenfieldShkumbin

Other protected area (protected landscape or nature monument)Inside0.002.9Qukes Powernot identifiedprivate92011concession awardedN/ANot identifiedhttp://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
64
AlbaniaQukes concession - Qukes 5ShkumbinElbasanGreenfieldShkumbin

Other protected area (protected landscape or nature monument)Inside0.0010.8Qukes Powernot identifiedprivate92011concession awardedN/ANot identifiedhttp://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
65
AlbaniaQukes concession - Qukes 6ShkumbinElbasanGreenfieldShkumbin

Other protected area (protected landscape or nature monument)Inside0.004.9Qukes Powernot identifiedprivate92011concession awardedN/ANot identifiedhttp://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
66
AlbaniaQukes concession - Qukes 7ShkumbinElbasanGreenfieldShkumbin

Other protected area (protected landscape or nature monument)Inside0.006.6Qukes Powernot identifiedprivate92011concession awardedN/ANot identifiedhttp://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
67
AlbaniaQukes concession - Qukes 8ShkumbinElbasanGreenfieldShkumbin

Other protected area (protected landscape or nature monument)Inside0.006.6Qukes Powernot identifiedprivate92011concession awardedN/ANot identifiedhttp://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
68
AlbaniaQukes concession - Qukes 9 ShkumbinElbasanGreenfieldShkumbin

Other protected area (protected landscape or nature monument)Inside0.0015Qukes Powernot identifiedprivate92011concession awardedN/ANot identifiedhttp://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
69
AlbaniaQukes concession - Qukes 10ShkumbinElbasanGreenfieldShkumbin

Other protected area (protected landscape or nature monument)Inside0.004.98Qukes Powernot identifiedprivate92011concession awardedN/ANot identifiedhttp://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
70
AlbaniaQukes concession - Qukes 11ShkumbinElbasanGreenfieldShkumbin

Other protected area (protected landscape or nature monument)Inside0.005.4Qukes Powernot identifiedprivate92011concession awardedN/ANot identifiedhttp://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
71
AlbaniaQukes concession - Qukes 12ShkumbinElbasanGreenfieldShkumbin

Other protected area (protected landscape or nature monument)Inside0.003.3Qukes Powernot identifiedprivate92011concession awardedN/ANot identifiedhttp://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
72
AlbaniaRadoveCarshoveKolonjeGreenfieldPowerhouse: 40.137266, 20.551491; Intake: 40.138697, 20.550883Bredhi i Hotovës-DangelliNational park

Emerald
Inside2.000MTC Energy shpknot identifiedprivate12009operational<52014Raiffeisen Bank (Albania)InvestedYesThe plant is located at the proximity of the boundary of the Bredhi Hotoves NP - the rivers constituted the natural boundary of the NP.

On 15.11.2013 MTC Energy shpk applied for electricity generation license for the Radove HPP. First year of generation appears to be 2014 based on ERE reports.

Concession failure penalties:
Penalty holder: concessionare for the construction of the HPP Radove; name blacked out in the document
Total penalty amount:2,575,217
Currency:LEK
Reason:"Pay LEK 2,575,217 (2,547,400 LEK (00:05% x 188 million LEK x 271 days (3/9 / 2009-
06.02.2010) plus interest LEK 28217)"
Penalty issued: December 2012
http://www.klsh.org.al/web/pub/ministrin_e_ekonomis_441_1.pdf; http://www.google.cz/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&ved=0CCMQFjAA&url=http%3A%2F%2Fere.gov.al%2Fdoc%2FNjoftim_15.11.2013.doc&ei=haHvVITqBcv_ygOVkoCABA&usg=AFQjCNGz-IWcyl3-0SJQOD2IWOmCJMHPgQ&sig2=UvrXdHHOI-hSEbD2283klw&bvm=bv.86956481,d.d2s&cad=rja, http://www.ere.gov.al/doc/Annual_Report_2014.pdf
http://www.qkb.gov.al/umbraco/Surface/SearchSurface/DownloadDocument?documentCode=90CEE90F-FB7B-4C56-BA36-2E89FDC93F3B
73
AlbaniaLangarice Cascade / Rajan 2Water source: +641.65 Langarica river + water from Hpp OsnatKorceGreenfield0.002.4Rajan Energy shpkEmmecidue SrlItaly100%private12200935concession awardedN/ANoneNot clear whether concession is still valid, it is in latest EITI report but not much other news.http://www.asha.gov.al/wp-content/uploads/2014/06/28.Vendim.301-dt.18.04.2014.pdf; http://dekliada-alb.al/en/langarica-cascade-hpp, http://akm.gov.al/assets/vnm-rajan-2.pdf, http://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
74
AlbaniaSasajKalasa; TatzatiSarandaGreenfieldProtected LandscapeOther protected areaInside8.600Energo-Sas shpk Agna Group Albania100%private2006302036Hydroprojekt (Czech Republic); Wonder-Studio (Albania); Wonder sha (Albania); SGE (China)operational<52012EUR8.58.5Raiffeisen Bank (Albania)CompletedYesWorks on Sasaj date back to 1978 and are connected with the construction of the Saranda coastal Irrigation system built on the river intake of Kalasa (Tatzati stream). Channel to the entrance of the tunnel, tunnel Sasaj, derivation channel were built.

Sasaj tunnel 3.5 km in length, the tunnel is cut through the mountain from the Kalasa river to the coastal slopes continuing in a large canal.

Sasaj HPP is to improve electricity supply to south coast tourist resorts. It was planned to be multipurpose - combining irrigation with power generation.

WB document dated October 2012 notes CEZ Group (100% / Czech Republic) is the project sponsor.

With decision No. 11/6 date 10.07.2006 of Urbanism Department of Lukova Commune, has been approved the destination of construction site and the right of way of Sasaj HPP works. Through an Agreement among Lukova Commune, Sasaj village and “ENERGO-SAS” company dated 26.11.2008, the project got a community approval.

The residents of Lukjova objected to the establishment of the HPP in the village of Lukove, because the project sponsored by another company intended to exploit the steepness of the slopes and excesss water of Sasaj properties of residents which substantially damaged agricultural lands.

Sasaj HPP is different frm the project submitted under the World Bank's Coastal Zone Management project due to the lack of an accord over land ownership. Instead, the project sponsor received unanimous support from Sasaj village community.

A petition was carried out by the Lukova inhabitants, addressed to the Albanian and international institutions concerning the proposed hydro-electric plant in Sasaj Village. The World Bank answered that "While the objections raised in respect of this proposal [the HPP] may well be valid, they are not pertinent to the proposed South Coast Planning Regulations. The Consultants have commented on this proposal in the Engineering Report."

An agreement was reached between the Concessionaire and Village of Sasaj on 26.11.2008. Also this support is confirmed and in the presence of municipal authorities Lukove, at the meeting of common in the village Sasaj to date. 12.28.2008 (minutes of the meeting
tripartite: Community, the Municipal Presidency Lukove and concessionaire)

HPP construction in the territory of the village Lukove was not allowed by the villagers. After protracted negotiations, because they could not convince Lukove residents, project sponsor moved the HPP 500 meters west Piqerasi territories. Residents say that there was no transparency.

Violations of technical safety regulations caused flooding hundreds of hectares of agricultural lands in the village of Bunecit in 2013. Residents of Lukove seek financial compensation. The mayor of Lukjova villages submitted a lawsuit against owners Bunecit HPP to the Attorney.
http://energjia.al/tag/peruron/; http://gazetatelegraf.com/hec-i-i-bunecit-u-demton-tokat-banoret-denoncojne-ne-prokurori/ů http://km.gov.al/index.php?fq=brenda&m=news&lid=16532&gj=gj2; http://ppi-re.worldbank.org/data/project/energo-sas-sasaj-shpp-7408, http://siteresources.worldbank.org/INTALBANIA/Resources/Q&A_Southern_Coast_Development_Plan1.pdf
75
AlbaniaSekeUrakaGreenfield0.0011.2Seka Hydropowernot identifiedprivate12013concession awardedN/ANot identifiedhttp://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
76
AlbaniaSeleniceVjosaSeleniceGreenfieldnone yetnone yetpotentialNoneOld project, not being actively pushed at time of writing.http://www.oranews.tv/videogaleri/vlore-selenica-pa-uje-banoret-botet-shperndahen-ne-zona-selektive/, http://balkanrivers.net/en/key-areas/vjosa-river
77
AlbaniaSeliceUnclearnot identifiednot identifiedunclearN/ANo information found
78
AlbaniaSelitaTiranaExisting5.000not identifiednot identifiedpublicoperational>101952N/Ahttps://www.wbif.eu/content/stream//Sites/website/library/WBEC-REG-ENE-01-BR-1-Role-of-hydropower-04.12b.pdf
79
AlbaniaVloreShushicaVloreUnclearnot identifiednot identifiedunclearN/ANo information found
80
AlbaniaSkavica cascade / Skavica 2DrinUnclear350not identifiednot identifiedplannedN/AEuropean Bank for Reconstruction and Development (EBRD)PlannedN/AIn September 2014, KESH met with Turkish companies "Suzer Group" and "Nurol Holding" about possible investment in the Skavica HPP.

Tassara-Geoteca Progetti-Kinglor Consortium listed as a promoter of the project.
http://www.skyscrapercity.com/showthread.php?t=326771; http://aea-al.org/wp-content/uploads/2014/07/study_on_assessment_of_res_potentials_in_albania.pdf; http://gazetamendimi.com/dy-kompani-turke-te-gatshme-te-investojne-per-hec-skavica/; http://www.jci-plant.or.jp/010jci/pdf/H21_ENE-1-B-albania-Report.pdf
81
AlbaniaSkoranUnclearnot identifiednot identifiedunclearN/ANo information found
82
AlbaniaSllabinje cascade / Sllabinje (also Sllabinja or Slabinja or Slabinje or Sllabinje 1)Shkumbini (also Shkumbin)KorcaGreenfield13.800Power Elektrik Slabinje shpknot identifiedprivate12008operational 5-102012Not identifiedConcession failure penalties:
Penalty holder: concessionaire for the construction of HPP Sllabinje; name blacked out in the document
Total penalty amount: 18,905,045
Currency: LEK
Reason: "pay penalties in the amount of 18,905,045 LEK
(0.05% x difference of outstanding investment (total value 1,290,117,500 LEK -
LEK 1,089,000,000 value of investments to more dated 31/12/2010 with no.
10758 protocol, dated 13/12/2010) x 188 days (from 26/5 / 2010- 31/12/2010)."
Penalty issued: December 2012

The company took a loan from Raiffeisen Bank in 2016.
http://www.klsh.org.al/web/pub/ministrin_e_ekonomis_441_1.pdf

http://www.qkb.gov.al/umbraco/Surface/SearchSurface/DownloadDocument?documentCode=C657AF04-43E8-4311-A4A7-05E7B41D497E
83
AlbaniaSmokthina (also Smokthine or Lepenice)Shushica (also Sushice)VloreRehabilitation9.200Albanian Green Energy shpkEssegei spa (owned by Alpiah srl holding company (Italy))Italyoperational>102004Not identifiedWith ERE’s decision no.2 of date 27.01.2003, ERE has withdrawn the license of “Essegei-Shqipëri” company for not fulfilling the license conditions and managing incapacities and Essegei-Shqipëri Smokthina company is appointed as administrator, to undertake the use of licensed equipments and this company will fulfill all the obligations defined in the license.

With ERE’s Board of Commissioner’s decisions no.69 and no.70, dated 12.12.2007, ERE has transferred the licenses from the concessionary companies of Essegei Shqipëri Smokthina and Hydroelectric Company of Albania to  Albanian Green Energy and Balkan Green Energy companies.

On 09.09.2013 the Tirana District Court confirmed that it registered the civil cause Act no. 171 depositing date 04.06.2009,and registration date 05.06.2009 with complainant Mr. Grigor Zoraqi; defendants: Giorando Gorini, Aldo Francescheti, Essegei spa Company, Albanian Green Energy company, Balkan Green Energy company, the Economy, Trade and Energy Ministry and Energy Regulator Authority.

ERE 2009 report says commissioned in 1974 http://www.ere.gov.al/doc/rap_vjet_2009_derguar_ne_kuvend.pdf
http://mobile.ikub.al/Lajme/LIGJE_CATEGORY/PeR-KUALIFIKIMIN-E-IMPIANTIT-PRODHUES-PeR-HEC-SMOKTHINA-Te-SHOQeRISe-ALBANIAN-GREEN-ENERGY-SHPK-SI-BURIM-I-RINOVUESHeM-ENERGJIE-1309110102.aspx; http://www.alltravels.com/albania/all-regions/bratraj/photos/current-photo-1332607; http://renewables.seenews.com/news/albania-licenses-smokthina-hpp-as-producer-of-renewable-energy-351678; https://cdm.unfccc.int/filestorage/q/v/UVZTEC5X7L1JRNS09PYABQM6WH3F24.pdf/PDD.pdf?t=NE98bnA5bW84fDAr54gQFSu8W0HfXct1TF2f
84
AlbaniaStojan.Greenfield0.001.4El-Er Energy shpknot identifiedprivate12008unclearN/ANoneOn 26 July 2014 the Ministry of Energy and Industry initiated proceeding in cancellation of 14 concessionary contracts for the construction of 30 HPPs approved by Berisha's administration, including the Stojan HPP. However it still appears in a later concession list so it is not clear what the situation is.http://gazeta-shqip.com/lajme/2014/07/26/anulohen-kontratat-e-koncesioneve-per-30-hec-e/, http://www.panorama.com.al/koncesionet-anulohen-14-kontrata-per-hec-e/, http://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
85
AlbaniaThane and Mollas concession / Thane Shishtavecit and RekesFier Shegan; FierGreenfield0.003.9Delia Group shpknot identifiedprivate2200835concession awardedN/ANoneConcession failure penalties:
Penalty holder: concessionare for the construction of the HPPs Thane and Mollas; name blacked out in the document
Total penalty amount:26,020,055
Currency:LEK
Reason:"pay penalties calculated in value when 26,020,055
LEK (for 499 days x0.005% x 1,042,888,000 ALL)."
Penalty issued: December 2012
http://www.deliagroup.com.al/index.php/en/projects, http://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
86
AlbaniaZaje-Turaj-Xhaferraj-Kollovoz-Novosejë-Meshtekën concession / TurajShishtavecit and Rekes (also Reka-Topojan)KukesGreenfieldMali I Dajtit National Park

National ParkInside0.002.92Reka sh.p.k; Albakonstruksion sh.p.k; Xhoino sh.p.k not identifiedprivate62012concession awardedN/ANot identifiedhttp://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/, http://www.ere.gov.al/doc/Raporti_Vjetor_2016.pdf
87
AlbaniaUjanik 2UjanikGreenfieldOther protected areaInside2.5HP Ujaniku Energy
not identifiedprivate12011operational<52016Not identifiedDue-dilligence report prepared by Abkons in February-April 2015.http://abkons.com/bkt/; http://www.qbz.gov.al/botime/fletore_zyrtare/2015/PDF-2015/194-2015.pdf, http://www.ere.gov.al/doc/Raporti_Vjetor_2016.pdf
88
AlbaniaUlzes (also Ulze or Ulza)MatDuplicateOther protected areaInside25.000not identifiednot identifiedoperational>101958N/Ahttps://www.wbif.eu/content/stream//Sites/website/library/WBEC-REG-ENE-01-BR-1-Role-of-hydropower-04.12b.pdf
89
AlbaniaUra e PrenitBushtricaLibrazhdGreenfield0.0029Bushtrica Energy 2009not identifiedconcession awardedN/ANonehttp://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/
90
AlbaniaValbone (also Valbona)ValbonaTropojeGreenfieldLugina e Valbones National Park

National park

Emerald
Inside0.002.3T’Plani shpknot identifiedprivate12009under constructionN/ANot identifiedIn the National Park, heavily opposed by locals and environmentalists.https://al.linkedin.com/pub/sadik-llapashtica/3a/1a8/320; https://www.facebook.com/permalink.php?story_fbid=353672494789170&id=353424184814001, http://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/, http://www.journeytovalbona.com/wp-content/uploads/2016/01/FINAL-Opinion.pdf
91
AlbaniaDrin River cascade / Vau i DejesDrinShkodra (also Shkoder)Rehabilitation250.00Korporata Elektroenergjitike Shqiptare sh.a (KESH)not identifiedpublicoperational>101971International Development Agency (IDA)Signedsee Drin River cascade / KomaniKreditanstalt für Wiederaufbau (KfW)YesRehabilitation of Komani, Fierza and Vau i Dejes HPPS was financed under:
1/ World Bank's Energy Community of South East Europe APL Program – the APL 5 for Albania Dam Safety Project (a part of a larger Dam Safety program financed in parallel by other international financial institutions (IFIs) such as SECO-Switzerland, KfW Germany, the European Bank for Reconstruction and Development (EBRD), and the Government of Albania).

2/ World Bank's DAM SAFETY - ADDITIONAL FINANCING
http://www.worldbank.org/projects/P110481/energy-community-south-east-europe-apl-program-apl-5-albania-dam-safety?lang=en
92
AlbaniaDrin River cascade /
Vau i Dejes
ExistingKorporata Elektroenergjitike Shqiptare sh.a (KESH)not identifiedInternational Bank for Reconstruction and Development (IBRD)Signedsee Drin River cascade / KomaniYeshttps://www.wbif.eu/content/stream//Sites/website/library/WBEC-REG-ENE-01-BR-1-Role-of-hydropower-04.12b.pdf
93
AlbaniaDrin River cascade /
Vau i Dejes
Existingnot identifiednot identifiedEuropean Bank for Reconstruction and Development (EBRD)Completedcreditsee FierzaYeshttps://www.wbif.eu/content/stream//Sites/website/library/WBEC-REG-ENE-01-BR-1-Role-of-hydropower-04.12b.pdf
94
AlbaniaVeleshica cascade / Veleshica 1Water source: 1550 in 2 axes by 0.5 m3/sGreenfield5.67Veleshica Energy sh.p.kEnergia e Territorio sa ?Italyprivate8200935plannedN/ANot identifiedOn 15.07.2014 the Ministry of Culture approved a report on the reorganisation of the Veleshica cascade prepared by Agency Service for Archaeological Projects about archeological monitoring of the construction works. The report applied to Veleshica 1-6, and Sllove and Bjeshke promoted by Veleshica Energy shpk. On November 11, 2011, the Ministry of Economy cancelled concession deal with Veleshica Energy for the construction and upgrade of hydro power plant as the concessionaire failed to meet the contractual obligations. http://www.balkans.com/open-news.php?uniquenumber=42618; http://www.ikub.al/LIGJE/911180053/Article-PeR-MIRATIMIN-E-KONTRATeS-Se-KONCESIONIT-Te-FORMeS-BOT-Te-LIDHUR-NDeRMJET-MINISTRISe-Se-EKONOMISe-TREGTISe-DHE-ENERGJETIKeS-DHE-BASHKIMIT-Te-SHOQeRIVE-ADVISOR-C-ENERGY-SHPK-POLISTAMP-SYSTEM-SRL-E-ENER.aspx; http://www.asha.gov.al/wp-content/uploads/2014/06/Vendimi-332-date-15.07.2014-HEC-Veleshica.pdf; http://renewables.seenews.com/news/albania-cancels-12-hydro-power-plant-concession-deals-209853; http://www.asha.gov.al/wp-content/uploads/2014/06/60.Vendim-332-dt.15.07.2014.pdf; http://dekliada-alb.al/en/veleshice-cascade-hpp
95
AlbaniaVertopit (also Vertop).GreenfieldOsum tributary

National strict protected area

Emerald
Inside0.001.52Hydro Salillari shpk not identifiedprivate12009Vaptech (Bulgaria)operational<52016Not identifiedhttp://www.ere.gov.al/doc/Raporti_Vjetor_2016.pdf
96
AlbaniaVlaschukDevollGreenfieldnone yetnone yetpotentialN/ANonehttp://www.ecoalbania.org/wp-content/uploads/2017/05/HPPs_al_final-report_me-kapak.pdf
97
AlbaniaVukel cascade / Vukel 1Cem i VuklitVukelGreenfieldCem i Vuklit

National strict protected area

Emerald
Inside0.00not identifiednot identifiedpotentialN/ANoneAppears on old list of concessions but not newer ones and in 2009 ERE report but with a different sponsor.http://www.albania-smallhydropower.org/Lista%20e%20Koncesioneve%20per%20Hidrocentralet%20e%20Vegjel%20ne%20Shqiperi.pdf, http://www.ere.gov.al/doc/rap_vjet_2009_derguar_ne_kuvend.pdf
98
AlbaniaVukel cascade / Vukel 2 Cem i VuklitVukelGreenfieldCem i Vuklit

National strict protected area

Emerald
Inside0.00not identifiednot identifiedpotentialN/ANoneAppears on old list of concessions but not newer ones and in 2009 ERE report but with a different sponsor.http://www.albania-smallhydropower.org/Lista%20e%20Koncesioneve%20per%20Hidrocentralet%20e%20Vegjel%20ne%20Shqiperi.pdf, http://www.ere.gov.al/doc/rap_vjet_2009_derguar_ne_kuvend.pdf
99
AlbaniaZalli i Bulqizes (also Vajkali or Vajkal) concessionZalli i BulqizeTernove; DiberGreenfield0.005.3Teodori 2003not identifiedprivate42011concession awardedN/ANonehttp://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/, http://www.akbn.gov.al/wp-content/uploads/2014/10/Investime-Hec-e-Gusht-2015.pdf
100
AlbaniaStebleveZalli i OkshtunitGreenfieldShebenik-Jabllanice National Park

National ParkInside0.003.4Pure Energy Stebleva
shpk
not identifiedprivate12008unclearN/ANot identifiedOn November 11, 2011, the Ministry of Economy cancelled concession deal with Pure Energy Stebleva shpk for the construction and upgrade of hydro power plant as the concessionaire failed to meet the contractual obligations.

On 26 July 2014 the Ministry of Energy and Industry initiated proceeding in cancellation of 14 concessionary contracts for the construction of 30 HPPs approved by Berisha's administration, including the Stebleve HPP.

However the concession is still on the EITI concession list published in 2016.

Concession failure penalties:
Penalty holder: Concessionaire for the construction of HPP Stebleve; the name blacked out in the document
Total penalty amount:
Currency: LEK
Reason: "pay duty in value from 47,504,895 LEK {595 days (25/12 / 2009-08.11.2011) x 0:05% / day x 159,680,320 ALL value from investments}."
Penalty issued: December 2012
http://renewables.seenews.com/news/albania-cancels-12-hydro-power-plant-concession-deals-209853; http://www.klsh.org.al/web/pub/ministrin_e_ekonomis_441_1.pdf; http://gazeta-shqip.com/lajme/2014/07/26/anulohen-kontratat-e-koncesioneve-per-30-hec-e/, http://www.albeiti.org/regjistri-i-koncensioneve-hidroenergjitike/, http://www.albeu.com/ekonomi/mete-zgjidh-12-kontrata-per-ndertimin-e-hec-ve-/51893/, http://www.panorama.com.al/koncesionet-anulohen-14-kontrata-per-hec-e/