ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
2
RAA-ONE CONSTRUCTION & ENGINEERING PTE LTD
3
03-54, 5 Soon Lee Street, Pioneer Point Singapore - 627607
4
www.raaonegroup.com & raaone77@gmail.com Tel No. : 65389517
5
QUOTATION
6
7
To,
CAG group Terminal 2
Singapore
Date 16/07/2024
8
Q Ref No RAA/2024/0047
9
ProjectCAG
10
11
Ref: To supply materials and manpower to lay the SSO points At T2
12
OPTION:1 INSTALLATION WITH EXISTING CARPET WILL HAVE MISMATCHED PATTERN DESIGN
13
S.NoItem DescriptionQTY
Unit Price ($)
Total Price ($)
14
1Safety And Preliminaries1Lot SGD 6,000.00 SGD 6,000.00
15
2To Provide Materials and manpower to lay the additional power points approximately less then 50 no's 13A/15A only. Using existing spare isolator, 50Nos SGD 360.00 SGD 18,000.00
16
3Tranking need for the cable path way 1Lot SGD 5,000.00 SGD 5,000.00
17
4After two years reinstate back the SSO points and patch back the Holes and make good as per item 1Lot SGD 10,000.00 SGD 10,000.00
18
5To supply LEW and add additional single line Drawing 1Lot SGD 6,500.00 SGD 6,500.00
19
6Miscellaneous items 1Lot SGD 4,000.00 SGD 4,000.00
20
7Open & closer floor panel ( CAG selected contractor didn't reply price)1Lot SGD 15,000.00 SGD 15,000.00
21
8Removal and make good of carpet (Existing Carpet) 1Lot SGD 43,570.00 SGD 43,570.50
22
9Insurance 1Lot SGD 5,000.00 SGD 5,000.00
23
Total Price SGD 113,070.50
24
25
OPTION:2: IF REPLACE NEW AXMINSTER CARPET
26
S.NoItem DescriptionQTY
Unit Price ($)
Total Price ($)
27
1Safety And Preliminaries1Lot SGD 6,000.00 SGD 6,000.00
28
2To Provide Materials and manpower to lay the additional power points approximately less then 50 no's 13A/15A only. Using existing spare isolator, 50Nos SGD 360.00 SGD 18,000.00
29
3Tranking need for the cable path way 1Lot SGD 5,000.00 SGD 5,000.00
30
4After two years reinstate back the SSO points and patch back the Holes and make good as per item 1Lot SGD 10,000.00 SGD 10,000.00
31
5To supply LEW and add additional single line Drawing 1Lot SGD 6,500.00 SGD 6,500.00
32
6Miscellaneous items 1Lot SGD 4,000.00 SGD 4,000.00
33
7Open & closer floor panel ( CAG selected contractor didn't reply price)1Lot SGD 15,000.00 SGD 15,000.00
34
8Removal and make good of carpet ( New Carpet) 1Lot SGD 116,656.00 SGD 116,656.50
35
9Insurance 1Lot SGD 5,000.00 SGD 5,000.00
36
Total Price SGD 186,156.50
37
38
Terms and Conditions
39
1. Variations works not included in the above, shall be quoted/billed separately.
2. This Quotation validity 30 days only.
3. CAG sellected contructor didn't replied About panel works to us So we take it as lump sum
40
Yours faithfully;
41
RAA-ONE CONSTRUCTION & ENGINEERING PTE LTD
42
(This is a computer generated quote, signature not required)
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100