NumberRequirement TitleLevelRequirement DescriptionSourceVerification SuccessVerification MethodResultsPass/Fail
4
1Project ScheduleL1Project shall be ready by Wednesday December 13th, 2017Class Objective
5
2
Operational Task - Connect
L1The Goliath will have the functionality to be connected remotely using ArxterraMission Profile
6
3Toy - ElementsL1The Goliath will behave like a toyMission Profile
7
4Driving Surface - StandardL1The Goliath will be able to drive on flat surfacesMission Profile
8
5Driving Surface - TextureL1The Goliath shall traverse on cloth, paper and linoleumMission Profile
9
6Print TimeL1All modifications shall allow the Goliath to be printed under a total print time of 6 hours with no part taking longer than 2 hoursClass Objective
10
7Custom PCBL1The Goliath shall contain a custom PCBClass Objective
11
83DotL1The Goliath will use the 3Dot BoardClass Objective
12
9AppearanceL1The Goliath should appear in scale to the real Goliath 302 tankClass Objective
13
10Operational Task - ControlL1The Goliath should be told to move remotely using ArxterraMission Profile
14
11BudgetL1The total cost of the Goliath shall remain under $350Class Objective
15
12Operation Task - MazeL1The Goliath should traverse a maze under remote controlMission Profile
16
13Operation Task - AutonomousL1The Goliath should traverse the maze without user inputMission Profile
17
14Operation Task - RecallL1The Goliath should remember the manual instructions given, in terms of navigating the mazeMission Profile
18
15Creative - Turn IndicatorL1The Goliath should display the next turn direction on LED grid displayAdded Objective
19
16Creative - Connection AccessL1The Goliath should have easy access for charging and programing hookupAdded Objective
20
17DurationL1The Goliath shall remain operating for at least an hourMission Profile
21
18Creative - SizeL1The Goliath should be smaller than the final design of the previous versionAdded Objective
22
19AssemblyL1All of the Goliath electronics and motors should be disassemble and reassemble within 20 minutesClass Objective
23
20AvoidanceL1The Goliath should detect and avoid running into other bots on the mazeMission Profile
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...
 
 
 
L1 Requirements
L2 Requirements
L2 Sub-Requirements Electronics
L2 Sub-Requirements Manufacturing