ABCDEFGHIJKLMNOPQRSTUVW
1
Checklist for Contribution of a SPECIFICATION (Rev A, Dec 2016)DateNotes
Who added the notes
2
CONTRIBUTION NAMEFacebook - Tioga Pass (next gen Dual Socket Xeon)PROJECT:SERVERS20-Jan-17Created Checklist.akgraner
3
CONTRIBUTING MEMBER/COMPANYFacebookTYPE:SPECIFICATION20-Jan-17Sent to John, Siamak, Bob Ogrey and Facebook Teamakgraner
4
ADDRESS1 Hacker WayCATEGORY:OPENRACK SERVER2-Feb-2017Verified MembershipMS
5
CITY, STATE ZIPMenlo Park, CA94025License:OCPHL-P3/2/2017added link to fileBC
6
COMPANY CONTACT:Whitney Zhao
7
Contact Email: Whitneyzhao@fb.comCURRENT STATUS:ACCEPTED
8
9
LICENSE & MEMBERSHIP REQUIREMENT (Foundation to fill out this section)LINK TO FILESFoundation ApprovalIC/PL Approval
10
REQUIREDThe Submitter must be a Member of OCP in good standing and has executed the Contributor License Agreement and the Copyright License Agreement
Member in good standing. http://files.opencompute.org/oc/public.php?service=files&t=00d71f6a0dff2254b808256315e0cb7f
Confirmed: MS
11
PROJECT REVIEW- Submitted has demonstrated ALL of the following: Action RequiredFoundation ApprovalIC/PL Approval
12
REQUIREDThe project lead has reviewed the specification and sufficient review(s) with the projectSpec review is done and updated. We're in process to submit the Tioga Pass spec.Approved:BC
13
REQUIREDa) There must be contributor(s) that will submit a Product and ORDERABLE SKU that will meet all criteria in the specification.As of submittal, SKU number is not available. Quanta and Wiwynn are the manufactures.
The MP date for the design is scheduled to be Q2 2018. Will provide more details later.
Approved:BC
14
REQUIREDb) That product in (a) above, which adheres to the Specification, shall be capable of meeting at least THREE tenets on the OCP Principles list.Submitter identifies the Accepted Design and provides evidence to foundation
Tioga Pass is the next Gen dual socket server platform which provides higher performance;
TImplementation of BMC with hooks around the board for ability to monitor system telemetry(power, current, voltage, temperature...)and communites with BMC commands;
The server is to operate in FB's datacenter which has to achieve low PUE number;
Provision of relevant documents(to be done when close to MP) such as schematic, CAD, ME drawings etc.
Approved:BC
15
REQUIREDc) That Product and it's ORDERABLE SKU(s) in (a) must be contributed as either OCP Inspired™ or OCP Accepted™ , 2) will be available within a reasonable timeframe after release of the specification, and 3) will be available for purchase by any member company.Submitter provides evidence BELOW that product will meet 3 of the tenets.
a) This is in progress, specifications submittal is a start. Will provide more documents like schematics and design information on a later date.
b) This will be available Q2 of 2018
c) Available to purchase from Quanta and Wiwynn as an Orderable SKU number
Approved:BC
16
REQUIREDd) The Foundation’s Incubation committee has voted to accept the Specification and all submission checklists, licenses, and membership requirements have been met.Approved:BC
17
CONFORMS TO OCP PRINCIPALS (MUST MEET MINIMUM of THREE CRITERIA). The contributor shall provide engineering evidence that the product meets the tenets and the specification criteria.Action RequiredFoundation ApprovalIC/PL Approval
18
COMPLETED1. Efficiency – A key OCP tenant is efficient design. Aspects that can be considered include (but aren’t limited to) power delivery and conversion, thermal efficiency, platform performance (per-W for example), reducing overall infrastructure costs, reducing code weight, reducing latencies and more.Submitter provides evidence to foundation
28%-30% performance per walt gain to Leopard(test dependent).
Approved:BC
19
COMPLETED2. Scale – OCP contributions must be scale-out ready. This means that the technology is designed with the right supporting features to allow for its maintenance in large scale deployments. This includes physical maintenance, remote management, upgradability, error reporting and appropriate documentation. Management tools should strive to adhere to the guideline provided by the OCP Hardware Management Project. Documentation should enable adopters towards a successful deployment, providing guidance on equipment installation, turn on and configuration, as well as physical and remote service.Submitter provides evidence to foundation
Tioga Pass allow remote BMC access its analog sensors, control power status and get logs;
Tioga Pass is designed with better servicebility for example the FRU of PHM(processor heatsink module) down the CPU swapping time from 12mins to 2-3mins;
all FW update can be done via in-band or OOB
Approved:BC
20
COMPLETED3. Openness – OCP encourages as much open source contribution as possible, but understands that in certain cases 100% open source contriution may not be possible. Whether fully open source or not, a contribution should strive to comply with a set of already existing open interfaces, at the very least provide one. Providing a solution compatible with already existing OCP contributions is one way to implement existing (open) interfaces.Submitter provides evidence to foundation
We are contributing Tioga Pass spec at this moment. And will provide full design package when we move to MP stage.
Approved:BC
21
COMPLETED4. Impact – New OCP contributions must create meaningful positive impact within the OCP ecosystem. This can be attained by introducing efficiency gains, introducing new technologies and products that are valuable for scale out computing, creating a multiplier effect by building on top of already existing OCP solutions, and enabling a more robust supply chain by contributing alternative compatible solutions.Submitter provides evidence to foundation
Tioga Pass design shows our continuous support on Dual Socket server design which is cost efficient and power efficient with great performance gain.
Approved:BC
22
COMPATIBILITY & INTEROPERABILITY INFORMATIONLINK TO FILESFoundation ApprovalIC/PL Approval
23
OPTIONALSpechttp://files.opencompute.org/oc/public.php?service=files&t=d47928ffbdd917ff2032009bba6d3d04Approved:BC
24
OPTIONALFile name of uploaded fileLink to additional Supporting Files
25
OPTIONALFile name of uploaded fileLink to additional Supporting Files
26
OPTIONALFile name of uploaded fileLink to additional Supporting Files
27
Links to supporting documentation and filesLINK TO FILESFoundation ApprovalIC/PL Approval
28
OPTIONALFile name of uploaded fileLink to additional Supporting Files
29
OPTIONALFile name of uploaded fileLink to additional Supporting Files
30
OPTIONALFile name of uploaded fileLink to additional Supporting Files
31
OPTIONALFile name of uploaded fileLink to additional Supporting Files
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100