Rincian Claim Back Charge PT. ELANGMAS SURYA
3
4
No. Dokumen : CBC/GTS/X/2026/024
5
Referensi : LOG/FPPPB/V/GTS/2026/043
6
7
Dimensi Sewa Kapal
8
Nama KapalPLTTotal DimensiSatuanHarga SewaHarga Per Meter
9
LCT SSA 774011.541,840.00
10
86.64211.20
11
3.38.14106.92
12
2158.12METERRp2,375,850,000Rp1,100,889
13
14
Spesifikasi Barang Titipan@P*L*T
15
Nama BarangQtyPLTDimensiBeratTotal Berat
16
TYRE 20.5R25 VLTS E4 2A (BRIDGESTONE)11.481.480.541.18636636
17
TYRE 11.00-20 18PR BIAS TBR.KING ASSY GY1001.070.281.070.32555,500
18
INNER TUBE10.400.400.300.052525
19
FLAPP10.500.400.300.063535
20
TYRE 14.00R24 GRL 09 TL (ADVANCE)41.371.370.340.64204816
21
FIBERGLASS EXTENSION LADDER, 40 FEET16.300.500.300.959595
22
DRUM LIFTER 720KG11.030.760.850.678686
23
GENSET AUSTIN POWER CUMMINS 320KVA14.501.502.2014.853,5003,500
24
@Ï€*(r*2)*T
25
Nama BarangQtyπrTVolumeBeratTotal Berat
26
0.0000
27
28
29
Nama BarangTotal DimensiSatuanHarga Barang
30
TYRE 20.5R25 VLTS E4 2A (BRIDGESTONE)1.18M3Rp160,000,000
31
TYRE 11.00-20 18PR BIAS TBR.KING ASSY GY0.32M3Rp432,500,000
32
INNER TUBE0.05M3Rp300,000
33
FLAPP0.06M3Rp85,000
34
TYRE 14.00R24 GRL 09 TL (ADVANCE)0.64M3Rp65,200,000
35
FIBERGLASS EXTENSION LADDER, 40 FEET0.95M3Rp13,090,000
36
DRUM LIFTER 720KG0.67M3Rp17,600,000
37
GENSET AUSTIN POWER CUMMINS 320KVA14.85M3Rp355,000,000
38
Sub Total18.71M3Rp1,043,775,000
39
40
@Harga Sewa/Dimensi0.072%
41
Total Dimensi
Barang
Harga Kapal
Per Meter
Total
Biaya Kapal
Biaya Asuransi
Barang
Total Biaya
Back Charge
42
18.71Rp1,100,889Rp20,597,534Rp 751,518Rp 21,349,052
43
44
Jakarta, 2 Oktober 2026
45
Dibuat Oleh,Diketahui Oleh,Disetujui Oleh,
46
47
48
49
50
Indra Abdi Y.Ismunandar ARRendy Sipahutar
51
Part expeditor OfficerLogistic SuperintendentLogistic Manager
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100