Broad CategorySpecific StrategyLevel of market readinessROIWhole-building energy savings potentialWater efficiencyMaintenance savingsInfluence on quality of work environmentFlexibility to reconfigure in futureAcousticsNeed for on-site skill/trainingInstitutional- ization needsNotes
3
Specific Technologies
4
HVACRadiant slab cooling443n/a34233?
5
Natural ventilation / mixed mode323n/a14323?
6
Electronics & Networks
7
Optimal device specification443n/a134n/a22
8
Optimal device operation443n/a134233
9
Energy Reporting343n/a444n/a33
10
DC power
333n/a334n/a33
11
Integrated Systems
12
Within buildings
13
Diagnostics
14
Tracking energy and operational performance targets444n/an/a2n/an/a24
Difficult break out ROI, training, and insitutional needs for each of these best practices seaparately. I'd prefer to do a cell merge and list give an overall ROI.
15
Fault and energy anomaly detection434n/a22n/an/a34
16
Continuous measurement and verification433n/an/an/an/an/a13
17
Linking diagnostics to controls223n/a12n/an/a32
18
Virtual sensing1n/an/an/an/an/an/an/a11
19
Physical model-based diagnostics1n/an/an/a211n/a31
20
Integrated Building Envelope, Daylighting, and Lighting
21
Glazing/Facade- thermal, solar control444n/an/a43322
22
Opaque Envelope- thermal management444n/an/a31312
23
Daylight /Glare management334n/an/a44n/a32
24
Lighting sources and fixtures444n/an/a44n/a23
25
Lighting/Daylighting controls323n/an/a44n/a33
26
Integrated Envelope/lighting/perimeter control2n/a3n/an/a43324
27
HVAC controls
28
Standard sequences of operation 343n/a442n/a4?
29
Model predictive control 133n/a233n/a4?
30
Automated design and implementation of building controls 143n/a334n/a4* Substantial training needs, but not specifically on-site
31
Internet Building Operating System (iBOS) 143n/a224n/a4* Substantial training needs, but not specifically on-site
32
33
Action-oriented Benchmarking4421334N/A34
34
35
Commissioning
36
New-construction commissioning442444N/A332*Workforce availability considerations; **can prevent larger maintenance issues
37
Existing-buildings commissioning442444N/A332*Workforce availability considerations; **can prevent larger maintenance issues
38
Indoor Environmental Quality
39
Source control441N/AN/A3N/AN/A4
40
Particle filtration44N/AN/AN/A4N/AN/A1
41
Ventilation control342N/A24N/AN/A2
42
IEQ sensor and control1N/A1N/A23N/AN/A4
43
Personal environmental control system1N/A3N/AN/A3N/AN/A4
44
Multi-building & Urban scales
45
District-level energy services
46
Low Temp Hot Water Loop4444444434
47
Chill Water Loop
4344444433
48
Advanced Microgrid2344444424
49
DC Component of Microgrid 333N/A444423
50
V2G Infrastructure 2334344434
51
Bio & Natural Gas Distribution4343344434Biogas depends on local conditions with waste water treatment infrastructure
52
Reclaimed Water 4434344434Depends on local infrastructure
53
Waste heat recovery
54
Waste Heat Recovery Chillers4444444444
55
Data Center Waste Heat Recovery3444344434
56
De-Super Heat - - Waste Heat Recovery333N/A334433
57
Recuperators443N/A333333
58
Heat Recovery Ventilation444N/A343334
59
Waste Water Heat Recovery 223N/A343333
60
Thermo Electric Technologies 1112224432
61
Demand Response and Electric Vehicles
62
HVAC DR Control Strategies33NANA334234
63
Lighting Control Strategies33NANA334234
64
DR Automation23NANA334234
65
Advanced Load Management Systems33NANA334234
66
Smart EV Charging
33NANA344234
67
Coordinated Elec Vehicle Charging2
68
Renewables
69
Renewable Energy Planning 44444444N/A4
70
Solar PV - Onsite4324344N/A44
*Onsite systems can be maintained by service company. No need for staff training to maintain though some operating skill is needed.
71
Solar PV - Offsite44N/A*
4N/AN/A*3N/AN/A4
*Offsite systems that directly feed campus loads would add to resiliency and thereby improve working conditions.
72
Wind - Offsite44N/A
4N/AN/A*3N/AN/A4
*Offsite systems that directly feed campus loads would add to resiliency and thereby improve working conditions.
73
Ground Source Heatpump4344444434
74
Advanced Microgrid (Storage and Controls)2344444434
75
Solar Walls4444444424
76
Bio-Gas - Waste Water/Food & Green Waste42N/A4244444
*If biogas is used in a generator set then some accoustic impacts may occur but if offsite then no impact. **If biogas is owned and onsite then special training would be needed but if offsite and managed by others then less skills needed to manage.
77
Bio-Reactor from Waste Water Nitrogen 2?N/A4?44444
*If bioreactor is used onsite then some accoustic impacts may occur but if offsite then no impact. **If bioreactor is owned and onsite then special training would be needed but if offsite and managed by others then less or no skills needed to manage.
78
79
58
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100