ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
2
3
4
5
6
7
8
9
10
11
12
13
14
BUKU PEMBANTU KAS TUNAI
15
BULAN SEPTEMBER 2026
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
PROGRAM REVITALISASI SATUAN PENDIDIKAN
32
SMKS AR-RAHMA
33
TAHUN 2026
34
35
36
37
38
39
40
41
42
43
44
KEPALA SEKOLAH
:
ERLI MEGAWATI
45
BENDAHARA:
.................................
46
NAMA SEKOLAH
:
SMKS AR-RAHMA
LAPORAN BULAN KE
: I (SATU)
47
NPSN:69758275
BULAN
: SEPTEMBER 2026
48
DESA:JAYABAKTI
49
KECAMATAN:CIDAHU
50
KABUPATEN:SUKABUMI
51
52
NOTANGGAL NO BUKTIURAIANPENERIMAAN PENGELUARANSALDO
53
(Rp)
54
A11/09/202601/UM/IX/2026Terima Kas Tunai Penarikan dari Bank BNI 84.817.600 84.817.600,00
55
56
116/09/202601/UK/IX/2026
Transportasi Pengambilan Uang Ke Bank
57
•Bendahara1Keg @ 50.000 = 50.000 50.000 84.767.600
58
59
216/09/202602/UK/IX/2026
Belanja Konsumsi Rapat P2SP dan Panitia Pembangunan
60
•Snack 10Dus@ 10.000 = 100.000
61
Jumlah 100.000 100.000 84.667.600
62
63
316/09/202603/UK/IX/2026
Dibayar Biaya Transportasi Survey Harga Ke Toko material
64
•
Ketua P2SP, Logistik dan Bendahara, Ket. Pelaksana
1Keg@ 200.000,00 = 200.000 200.000 84.467.600
65
66
416/09/202604/UK/IX/2026
Pembelian Barang Persiapan
67
•
Papan Nama Program dan Papan Informasi
1unit@ 169.000 = 169.000
68
•
Topi Pelindung (Sapety Helmet)
20bh@ 50.000 = 1.000.000
69
•
Sarung Tangan (Sapety Gloves)
20bh@ 10.000 = 200.000
70
•
Sepatu Keselamatan (Safety Shoes)
20pak@ 130.000 = 2.600.000
71
•
Pelindung Pernapasan dan Mulut (Masker)
20bh@ 25.000 = 500.000
72
•P3K5pak@ 125.000 = 625.000
73
Jumlah 5.094.000 5.094.000 79.373.600
74
75
516/09/202605/UK/IX/2026
Dibayar Biaya Jasa Perencanaan
76
•
Biaya / Honoraium Jasa Perencanaan
0,7Keg@ 17.919.209 = 12.543.446 12.543.446 66.830.154
77
78
616/09/202606/UK/IX/2026
Dibayar Biaya Pengawas
79
•
Biaya / Honoraium Jasa Pengawas
0,7Keg@ 11.633.702 = 8.143.591 8.143.591 58.686.562
80
81
716/09/202607/UK/IX/2026
Belanja Bahan Bangunan
82
•Pasir Urug3m3@ 240.000 = 720.000
83
•Pasir Pasang7btg@ 315.000 = 2.205.000
84
•Pasir Beton7m3@ 399.000 = 2.793.000
85
•
Batu Kali / Belah Belah
21m3@ 315.000 = 6.615.000
86
•
Batu Kerikil / Split 2/3 cm
7m3@ 350.000 = 2.450.000
87
•
Bata Merah Bakar Kelas I
8622zak@ 1.300 = 11.208.600
88
•
Semen PC (50 kg)
50m3@ 75.000 3.750.000
89
•
Kayu Kelas III Papan/bekisting
1m3@ 2.750.000 = 2.750.000
90
•Bambu 34m3@ 15.000 = 510.000
91
•
Besi Beton ulir
1185btg@ 11.000 = 13.035.000
92
Jumlah 46.036.600 46.036.600 12.649.962
93
94
B18/09/202602/UM/IX/2026
Terima Kas Tunai Penarikan dari Bank BNI
66.405.000 79.054.962
95
96
818/09/202608/UK/IX/2026
Transportasi Pengambilan Uang Ke Bank
97
•Bendahara1Keg @ 50.000 = 50.000 50.000 79.004.962
98
99
918/09/202609/UK/IX/2026
Dibayar Upah Pekerja Program Revitaliasasi SMKS AR- RAHMA Minggu Ke 1
100
•
Kepala Tukang
5HOK@ 120.000 = 600.000