| A | C | D | E | F | G | H | ||
|---|---|---|---|---|---|---|---|---|
1 | P-1264 | Details of roads for which restoration is in pending after Jal Jeevan project | ||||||
2 | LB | Jal Jeevan / KWA (updated on Feb 2024) | Jal Jeevan / KWA (status as on 12-05-2025) | Remarks | ||||
3 | No. of roads in pending for restoration (Nos) | Approx length of road in pending for restoration (in km only) | No. of roads in pending for restoration (Nos) | Approx length of road in pending for restoration (in km only) | ||||
4 | Manjesawram BP | 0 | 0.00 | 0 | 0 | |||
5 | Enmakaje GP | 0 | 0.00 | 0 | 0 | |||
6 | Mangalpady GP | 7 | 15.00 | 0 | 0 | |||
7 | Manjeswaram GP | 0 | 0.00 | 0 | 0 | |||
8 | Meenja GP | 0 | 0.00 | 0 | 0 | |||
9 | Paivalike GP | 0 | 0.00 | 0 | 0 | |||
10 | Puthiga GP | 0 | 0.00 | 0 | 0 | |||
11 | Vorkady GP | 0 | 0.00 | 0 | 0 | |||
12 | ||||||||
13 | ||||||||
14 | Karaduka BP | 0 | 0 | |||||
15 | Badaduka GP | 0 | 0.00 | 0 | 0 | |||
16 | Beloor GP | 0 | 0.00 | 0 | 0 | Now work stopped by JJM | ||
17 | Delampady GP | 0 | 0.00 | 0 | 0 | JJM work not started | ||
18 | Karadukka GP | 0 | 0.00 | 35 | 15 | |||
19 | Kumbadje GP | 0 | 0.00 | 0 | 0 | |||
20 | Kuttikol GP | 0 | 0.00 | 45 | 30 | |||
21 | Muliyar GP | 2 | 1.00 | 0 | 0 | |||
22 | ||||||||
23 | ||||||||
24 | Parappa BP | 0 | 0.00 | 0 | 0 | |||
25 | Balal GP | 0 | 0.00 | 12 | 5 | |||
26 | East Eleri GP | 1 | 0.80 | 1 | 0.800 | |||
27 | Kallar GP | 0 | 0.00 | 0 | 0 | |||
28 | Kinanoor - Karinthalam GP | 0 | 0.00 | 0 | 0 | |||
29 | Kodom Belur GP | 0 | 0.00 | 0 | 0 | |||
30 | Panathady GP | 0 | 0.00 | 0 | 0 | |||
31 | West Eleri GP | 0 | 0.00 | 1 | 1 | |||
32 | ||||||||
33 | ||||||||
34 | Neeleswaram BP | 0 | 0 | |||||
35 | Cheruvathur GP | 48 | 42.00 | 45 | 41 | KWA has done only the restoration of the road crossing with CC and in some places, due to pressure from local people, Grama Panchayath had to include it in the annual plan and carry out restoration | ||
36 | Kayyur Cheemeni GP | 0 | 0.00 | 0 | 0 | |||
37 | Padanna GP | 0 | 0.00 | 2 | 1 | |||
38 | Pilicode GP | 0 | 0.00 | 7 | 3 | റോഡിനു കുറുകെയുള്ള കണക്ഷൻ ആണ് restore ചെയ്യാൻ ഉള്ളത്.നിലവിൽ cut ചെയ്ത ബാക്കി റോഡുകൾ restore ചെയ്യുകയും, പഞ്ചായത്ത് പദ്ധതിയിൽ re tar ചെയ്യുകയും ചെയ്തിട്ടുണ്ട്. | ||
39 | Thrikkaripur GP | 0 | 0.00 | 71 | 55.0 | KWA has done only the restoration of the road crossing with CC and in some places, due to pressure from local people, Grama Panchayath had to include it in the annual plan and carry out restoration | ||
40 | Valiyaparamba GP | 0 | 0.00 | 0 | 0 | |||
41 | ||||||||
42 | ||||||||
43 | Kanhangad BP | 0 | 0 | |||||
44 | Ajanur GP | 35 | 26.00 | 35 | 26 | |||
45 | Madikai GP | 25 | 5.20 | 0 | 0 | |||
46 | Pallikkara GP | 0 | 0.00 | 4 | 2 | |||
47 | Pullur Periya GP | 0 | 0.00 | 0 | 0 | |||
48 | Uduma GP | 2 | 1.70 | 2 | 2 | |||
49 | ||||||||
50 | ||||||||
51 | Kasaragod BP | 0 | 0.00 | 0 | 0 | |||
52 | Badiyadka GP | 0 | 0.00 | 0 | 0 | |||
53 | Chemmanad GP | 0 | 0.00 | 0 | 0 | |||
54 | Chengala GP | 24 | 17.00 | 18 | 15 | |||
55 | Kumbala GP | 0 | 0.00 | 15 | 5 | List of roads in which works are ongoing is not yet recieved either from KWA or from the GP.Approximate number and length of restoration are included as per instructions. | ||
56 | MadhurGP | 0 | 0.00 | 24 | 4 | |||
57 | Mogral Puthur GP | 0 | 0.00 | 0 | 0 | |||