| A | C | D | E | F | G | H | I | J | K | L | M | N | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | P-1264 | Details of roads for which restoration is in pending after Jal Jeevan project | ||||||||||||
2 | LB | Jal Jeevan / KWA (updated on Feb 2024) | Jal Jeevan / KWA (status as on 12-05-2025) | Total restoration pending (Present status) | Work already arranged by KWA (Present status) | Balance works to be done by LSGD | Remarks | |||||||
3 | No. of roads in pending for restoration (Nos) | Approx length of road in pending for restoration (in km only) | No. of roads in pending for restoration (Nos) | Approx length of road in pending for restoration (in km only) | No. of roads in pending for restoration (Nos) | Approx length of road in pending for restoration (in km only) | No. of roads in pending for restoration (Nos) | Approx length of road in pending for restoration (in km only) | No. of roads in pending for restoration (Nos) | Approx length of road in pending for restoration (in km only) | ||||
4 | Manjesawram BP | 0 | 0.00 | 0 | 0 | 1 | 1.00 | 1 | 1.00 | 0 | 0.00 | |||
5 | Enmakaje GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | |||
6 | Mangalpady GP | 7 | 15.00 | 0 | 0 | 7 | 15.00 | 0 | 0.00 | 7 | 15.00 | List of roads in which works are ongoing is not yet recieved either from KWA or from the GP.Approximate number and length of restoration are included as per instructions. | ||
7 | Manjeswaram GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | |||||||
8 | Meenja GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | |||||||
9 | Paivalike GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | No JJM works proposed | ||
10 | Puthiga GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | No JUM works proposed. | ||
11 | Vorkady GP | 0 | 0.00 | 0 | 0 | 1 | 3.00 | 0 | 0.00 | 1 | 3.00 | JJM WORK COMPLETED.No NEW JJM works proposed | ||
12 | 0 | 0.00 | ||||||||||||
13 | 0 | 0.00 | ||||||||||||
14 | Karaduka BP | 0 | 0 | 0 | 0.00 | |||||||||
15 | Badaduka GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | |||||||
16 | Beloor GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | Now work stopped by JJM | ||||||
17 | Delampady GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | JJM work not started | ||||||
18 | Karadukka GP | 0 | 0.00 | 35 | 15 | 0 | 0.00 | 0 | 0.00 | 0 | 0.00 | Total no of roads 45, Total length 149 km, Number of roads digged till date 36 and length of road digged till date 70 km,Restored length 70 km | ||
19 | Kumbadje GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | Total no of roads 25, Total length 15km, length of road berm digged till date 15km.Restoration works of all the roads in Kumbadaje GP are included in JJM estimates | ||||||
20 | Kuttikol GP | 0 | 0.00 | 45 | 30 | 0 | 0.00 | Total no of roads 45, Total length 20km, length of road berm digged till date 20km.Restoration works of all the roads in kuttikkol GP are included in JJM estimates | ||||||
21 | Muliyar GP | 2 | 1.00 | 0 | 0 | 0 | 0.00 | |||||||
22 | 0 | 0.00 | ||||||||||||
23 | 0 | 0.00 | ||||||||||||
24 | Parappa BP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | |||||||
25 | Balal GP | 0 | 0.00 | 12 | 5 | 0 | 0.00 | |||||||
26 | East Eleri GP | 1 | 0.80 | 1 | 0.800 | 1.000 | 0.80 | 0.000 | 0.00 | 1 | 0.80 | |||
27 | Kallar GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | |||||||
28 | Kinanoor - Karinthalam GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | |||||||
29 | Kodom Belur GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | |||||||
30 | Panathady GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | |||||||
31 | West Eleri GP | 0 | 0.00 | 1 | 1 | 0 | 0.00 | Restoration works of all the roads in West Eleri GP are included in JJM estimates and completed.Work pending in Mouveni Echipoil road, for which restration is included in JJM estimate (details are entered by contacting to AE, Water Authority, Cheruvathur Section)-Upadated on 17/01/2026 | ||||||
32 | 0 | 0.00 | ||||||||||||
33 | 0 | 0.00 | ||||||||||||
34 | Neeleswaram BP | 0 | 0 | 0 | 0.00 | |||||||||
35 | Cheruvathur GP | 48 | 42.00 | 45 | 41 | 15 | 15 | 0.00 | KWA has done only the restoration of the road crossing with CC and in some places, due to pressure from local people, Grama Panchayath had to include it in the annual plan and carry out restoration | |||||
36 | Kayyur Cheemeni GP | 0 | 0.00 | 0 | 0 | 18 | 0.71 | 0 | 0.00 | 18 | 0.71 | KWA has carried out the restoration works by concreting. However, the restored portion is not smooth and is causing inconvenience to vehicular traffic. Based on the enquiry and request from the ward members and considering public demand and local requirements, restoration by tarring is required. Hence, this entry is made here. | ||
37 | Padanna GP | 0 | 0.00 | 2 | 1 | 0 | 0.00 | |||||||
38 | Pilicode GP | 0 | 0.00 | 7 | 3 | 0 | 0.00 | റോഡിനു കുറുകെയുള്ള കണക്ഷൻ ആണ് restore ചെയ്യാൻ ഉള്ളത്.നിലവിൽ cut ചെയ്ത ബാക്കി റോഡുകൾ restore ചെയ്യുകയും, പഞ്ചായത്ത് പദ്ധതിയിൽ re tar ചെയ്യുകയും ചെയ്തിട്ടുണ്ട്. | ||||||
39 | Thrikkaripur GP | 0 | 0.00 | 71 | 55.0 | 55.0 | 31.00 | 0.0 | 55 | 31.00 | KWA has done only the restoration of the road crossing with CC and in some places, due to pressure from local people, Grama Panchayath had to include it in the annual plan and carry out restoration | |||
40 | Valiyaparamba GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | |||||||
41 | 0 | 0.00 | ||||||||||||
42 | 0 | 0.00 | ||||||||||||
43 | Kanhangad BP | 0 | 0 | 0 | 0.00 | |||||||||
44 | Ajanur GP | 35 | 26.00 | 35 | 26 | 35 | 26.00 | 0 | 0.00 | 35 | 26.00 | kwa has not carried out any restoration work in any roads.Restoration work of roads which are included in panchayath annual project was executed by using panchayath own fund | ||
45 | Madikai GP | 25 | 5.20 | 0 | 0 | 0 | 0.00 | |||||||
46 | Pallikkara GP | 0 | 0.00 | 4 | 2 | 11 | 2.45 | 0 | 0.00 | 11 | 2.45 | ജല ജീവന മിഷൻ പദ്ധതിക്കായി റോഡ് കട്ടിങ് നടത്തുന്നതിനായി വിവിധ റോഡുകളുടെ ലിസ്റ്റ് സഹിതം അപേക്ഷ സമർപ്പിച്ചിരുന്നുവെങ്കിലും റോഡിൻറെ വിശദാംശങ്ങൾ ,സ്കെച്ച് എന്നിവ എന്നിവ ലഭ്യമാക്കുന്നതിന് കത്ത് നൽകിയിരുന്നു.ആയവ നാളിതു വരെ ലഭ്യമാക്കുകയോ ആവശ്യമായ റെസ്റ്റോറേഷൻ ഫീസ് അടക്കുകയോ ചെയ്തിട്ടില്ല. | ||
47 | Pullur Periya GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | |||||||
48 | Uduma GP | 2 | 1.70 | 2 | 2 | 0 | 0.00 | |||||||
49 | 0 | 0.00 | ||||||||||||
50 | 0 | 0.00 | ||||||||||||
51 | Kasaragod BP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | |||||||
52 | Badiyadka GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | |||||||
53 | Chemmanad GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | |||||||
54 | Chengala GP | 24 | 17.00 | 18 | 15 | 0 | 0.00 | |||||||
55 | Kumbala GP | 0 | 0.00 | 15 | 5 | 0 | 0.00 | List of roads in which works are ongoing is not yet recieved either from KWA or from the GP.Approximate number and length of restoration are included as per instructions. | ||||||
56 | MadhurGP | 0 | 0.00 | 24 | 4 | 0 | 0.00 | |||||||
57 | Mogral Puthur GP | 0 | 0.00 | 0 | 0 | 0 | 0.00 | |||||||