RFP #2495 - GENERAL CONTRACTING SERVICES FOR THE CONSTRUCTION OF GARNKIRK FARMS
ADDENDUM 2
2
RFI #ReferenceRFIResponse
3
1SpecificationsA residential casework specification section was not provided and the interior design set does not provide a basis of design product for the unit cabinetry. Please provide a basis of design product and residential casework specification section for the unit cabinets and confirm that specification section 06-41-00 Architectural Wood Casework, or specification section 06-41-16 Plastic Laminate Clad Architectural Cabinets apply to the amenity area casework only.The design of all the millwork in the public spaces and the units are detailed on the millwork detail sheets at the end of the ID set. The FFE has additional written specifications as provided.
4
2Architectural; P. 34; A-102The architectural set as well as the civil set make several mentions of exterior dog runs adjacent to the garage as well as an amenity terrace area; however, details are not provided at these locations. A landscape drawing set seems to be referenced in the civil set as well; however, it was not provided. Please provide the landscape plans.Landscape / Site Improvement Drawings are include in the approved Site Plan and SWM drawings.
5
3Architectural; P. 34; A-102Elevation detail 1 on drawing A-317 shows what appears to be coiling doors (Panel Type K from the A-500 Door Schedule) for the Exterior Trash Dumpster Storage room; however, the door schedule lists these same doors as double swing doors (Panel Type H). Please confirm if Doors 286A and 286B in the Exterior Trash Dumpster Room are intended to be coiling doors, in accordance with specification section 08-33-23 for Overhead Coiling Doors.Doors #286A and #286B should be type H. Drawings will be updated.
6
4Architectural; P. 127; A-504AFloor plan A-101B shows SF-3 as a 5 bay storefront with 14’-0” width. Elevation 3/A-504A shows 3 bay storefront with 9’-0” width. Please confirm if storefront SF-3 is to be included per the storefront schedule or per the floorplans/building elevations.SF-3 to be 14'-0" per Storefront Schedule and plan drawings. Elevation view will be updated to match.
7
5Interior Design; P. 50; ID-412No specifications for window treatments at common area/unit windows have been provided, and unit window head details do not depict any window treatments; however, Item 28 on page 2 of Exhibit G - "Summary Cost Estimate" notes "Roller shades at all apartment and common area windows". Please confirm if the window treatments are required at the units and common areas and provide specifications for the desired products.Window treatments have not been finalized at this time. Include a "Window Treatments" allowance of $175,000 for the project.
8
6Interior Design; P. 92; ID-921Per prebid meeting on 01/07, furnish and install of appliances are to be included in our scope of work. Please provide an appliance schedule for residential units and amenity spaces.The Basis of Design Appliances have been posted to the "Bldg Specs" Folder.
9
7Civil; P. 17; Landscape Plan Sheet 13 of 28The civil set of plans includes areas that are believe to be existing/already completed. Please confirm that only the sitework within area 13 shown on the sheet key on landscape plan sheet 13 of 28 is to be included in our scope of work. All areas outside that boundary are assumed to be complete.Only the multifamily portion of the project site (Parcel A) is to be included as defined by the LOD in the Sediment Control / SWM plans.
10
8Solar Residential; P. 3; S-003There is a post layout indicated on the solar drawings, but no corresponding information is provided on the structural or architectural drawings. Please confirm structural requirements and roof detailing for the solar panel array connections.Refer to provided manufacturer typical details.
11
9GeneralPlease confirm that all bidders are to include the garage scope in its entirety.Confirmed, all bidders are to include the garage scope in its entirety.
12
10AIA Contract FilesPlease provide the Microsoft Word versions of all AIA documents (ie., AIA A102, AIA A201, etc.) for easier markup tool use by GC legal teams.All available AIA documents are attached herein in Microsoft Word format.
13
11CAD/Revit ModelsPlease provide all CAD/Revit model files for bidding purposes and coordination purposes.CAD files will be provided.
14
12ContingencyPlease verify with Ownership if there is an Owner-directed contingency that all GC bidders should incorporate into their budgets for inflation/escalation risks, Owner use, etc. (ie., "All GCs to carry __% Contingency")The General Contractors are include any contingency required to complete the project.
15
13Davis-Bacon Wage ScaleWhat is going to be the financial driver for whether Wage Scale will be required, as it is to be carried currently as an Add Alternate? Many subcontractor bidders will withdraw their competitive numbers if Wage Scale is a requirement or not. Additionally, the funding source (ie., CDA, HUD, etc.) may also be direct driver to the minority participation requirements to the project too, which would meet, exceed, or comply differently to HOC's MFD program.Davis Bacon. The driving factor in Davis Bacon applicability for this project is currently FHA Risk Share insurance. If the construction loan is insured with FHA Risk Share, it will trigger Davis Bacon labor laws.
16
14Exhibit G (Alternates)Item 21 asks if monitored security during construction is included. Please confirm that a guard service is not required and that monitored cameras are acceptable.Monitored cameras with two way communication (Blueline / Provigil /or similar) are acceptable.
17
15Exhibit G (Alternates)Per Exhibit G, Clarification Line Item #12 is incomplete, what should the air sealing achieve "more than ____"?The final tested air leaked for each individual apartment shall not exceed 0.15 cfm50.
18
16Exhibit G (Alternates)Per Exhibit G, Clarification Line Items #18 and #19 call for submetering. Please verify if the GC is to furnish all unit water submeters, and if so, what manufacturer does Ownership prefer?The Owner will furnish the water and electrical submetering system materials. The GC and it's contractors shall install and assist with commissioning.
19
17Exhibit G (Alternates)Per Exhibit G, Clarification Line Items #18 and #19 call for submetering. Please confirm that the Owner, not GC, is to furnish all electrical unit submeters.The Owner will furnish the water and electrical submetering system materials. The GC and it's contractors shall install and assist with commissioning.
20
18Exhibit G (Alternates)Per Exhibit G, there is a section called "Pricing Alternates / Allowances". If there are any allowances that should be carried, the Owner should direct the GCs so that all RFP Hard Bids are apples-to-apples.The Bid Form provides the requested information. As a standard rule, please price the specified product and alternates may be provided for Owner consideration. Please indicate the material priced in any alternate. If a budget or scope must be an allowance please create a specific qualification and allowance tracking log item to identify clearly the portion of the proposal that is not a Guaranteed Maximum.
21
19Exhibit G (Alternates)Per Exhibit G, there is a section called "Pricing Alternates / Allowances". The column here days "Add / Deduct". Which items are the GCs required to provide per plans and specs in the budget, and therefore as a Deduct, versus Add Alternate "wish list" items for the Owner?For all items the GCs are required to provide per plans and specs in the budget. Whether less expensive or more expensive. The Owner also requests add / deduct alternates to evaluate the impact of changing the basis of design if desired.
22
20Geo Tech ReportThere are numerous sections in the Geotech report referring to not having the finalized site development plans and that they should be provided to confirm some of the assumptions. Is follow up and a revised report necessary?The site development plans are approved by the local Jurisdiction and Utility as per posted documents.
Owner to Provide revised Geotech report.
23
21Owner/Construction Oversight Services & Self-PerformingOur bidders have let us know that this project was previously bid out in Spring 2024 by another GC group. Additionally, "Consolidated Commercial Services", "Ventaq I LLC", and Duffie Companies are all referenced in these RFP plans as Owner entities all with the same contact (Tim Kamas). On previous projects where Consolidated Commercial Services has been involved during a GC Bidout, our bidders have said that at least one of them recently ultimately was self-performed. The question here: what was the previous GC's role in precon, and what will their role be moving forward during and after this RFP competitive-GC bidout? Once all GC bids are reviewed by HOC, Duffie, and/or RJD Real Estate Advisors, what is the likelihood that Consolidated Commercial Services (or prior GC) will ultimately self-perform any scope (ie., earthwork/horizontal construction, or vertical construction trades) or all of the scope for Garnkirk Farms Apartments?Consolidated Commercial Services, LLC is the Owner's selected Construction Manager for the project. The entities listed in this RFI will not be serving as the General Contractor for the project.
24
22RFP DocumentPer Addendum #1, only a RESIDENTIAL wage scale was provided for the project. The RFP makes mention of separate wage scales between the building and site, and the Garage. Please confirm if two wage scales are required (ie., "BUILDING"/commercial scale for the Garage, which is over 4 stories).If the Garage is approved as an accessory structure to the residential building, it may be eligible to share the Residential scale. If not it would likely be constructed at the Commercial scale. This is not a certainty at this time.
25
23RFP DocumentThe RFP references LEED Platinum on PDF pages 2 and 4, but NGBS Silver on PDF pages 3 and 10. On G-000, it days the project is following NGBS-2020 Silver, but then right underneath it days it is also targeting LEED Platinum. Which is it? Please advise, and provide the applicable sustainability checklist by which this project is designed to. There are many significant cost impacts if a design has LEED Platinum requirements versus NGBS Silver.The project is pursuing several certifications including Energy Star ZERH, LEED Multifamily Midrise Platinum , NGBS Silver Certification, and PHIUS Certification.
26
24RFP DocumentThe RFP refers to Aurora Energy as the project's solar design consultant. Should the GCs only be soliciting solar pricing from Aurora, or will alternate solar manufacturer proposals based on the Aurora design be acceptable? Has Ownership already contracted with Aurora, and if so, please issue the latest Aurora proposal that all GC's need to incorporate into our Budgets.Owner has not contracted with Solar /PV provider/installer. Alternate solar manufacturer proposals based on the Aurora design be acceptable.
27
25RFP DocumentSection F of the RFP states that "all contracts and purchase orders executed between the HOC and Contractors are subject to either Section 3 or the HOC Works, based on the funding source of the project." This is unclear, should this Budget Submission assume Section 3 Requirements, or the HOC Works, or both? Please advise.This contract triggers HOC Works. Section 3 would only be applicable if triggering Housing Community Development funding is utilized. The contractual obligation falls on the prime contractor for this project. The prime contractor may use subcontractors to meet HOC Works compliance requirements, as outlined in the program requirements.
28
26RFP DocumentIn the General Requirements of the RFP, it is stating the contractor must provide a double wide trailer for the owner. Please confirm how many months the trailer is to remain on the site.In lieu of this scope, please provide an office (with door) in the construction trailer for the Owner's use.
29
27Security/Access ControlPlease verify if Ownership has already engaged with an Access Control subcontractor, in order to effectively provide pricing for that scope. Per the Exhibit G, "Integrated credential electronic access control system (apartments and common areas)" is listed as a clarification? Alternatively, does Ownership have an Allowance that all GCs should carry in their budgets?A low voltage vendor is not currently awarded. ABE Systems has been engaged as designer and coordinator and Datawatch is the basis of design access control / cctv provider. The bases of design unit lockset is the Schlage FE series.
30
28Testing & InspectionsPlease verify if Owner is to carry all Testing & Inspections for the project, or if GCs are to carry, by soliciting proposals on behalf of the Owner. Montgomery County requires the owner to hire the special inspections firm directly, and Quality Assurance 1.9 A. seems to confirm that.Confirmed, the Owner will carry all testing and Inspections for the project. The General Contractor will be responsible for scheduling and coordination with the Owner's Testing and Inspections teams. The General Contractor will also be responsible for costs associated with missed appointments and repeated failed test results (more than 2 failures).
31
2984113Most storefront doors are scheduled to receive hardware set #001. Hardware set #001 lists a cylinder and cylinder core only. Hardware requirements listed in storefront specifications 084113-2.5 do not call for any closers, emergency egress panic devices, electric hardware, automatic operators, etc. Please provide complete hardware sets for storefront doors.Storefront door hadwares will be revised and provided.
32
3084113Storefront specifications list EFCO, Kawneer, Vistawall and Traco as approved manufacturers. Please confirm if YKK AP (www.ykkap.com) can be added to the list of approved manufacturers.Other manufacturers are acceptable provided they can meet the performance requirements of the project.
33
3188700Specification section 088700 calls for film to be shop applied. This film is typically field applied by a certified installer. Please confirm field applied film is acceptable.Confirmed.
34
32064100-3Please confirm the basis of design for unit and common area cabinetry. Please clarify the box construction and closing style of the cabinets.3/4" plywood box construction with soft close hinges.
35
33064100-3Please confirm if approved/equal cabinet substitutions are acceptable.Approved/equal cabinet substitutions are acceptable.
36
34084113-2.3-BStorefront specification section 084113-2.3-B calls for a 3 coat painted finish. This is atypical for this type of project. Please confirm if industry standard AAMA 2605 2 coat painted finish is acceptable.A deduct may be provided to utilize a 2 coat finish.
37
35084113-2.4Storefront specification section 084113-2.4 is contradictory. It lists 1-3/4” door thickness
(indicating a non-thermal door) but also calls for thermal door construction. Sheet G-002 calls for 0.77 U-factor for Entrance Doors. We assume this means standard non-thermal doors are acceptable, please confirm.
All exterior doors in the building envelope or separating conditioned space from unconditioned space shall be thermal.
38
36088000-3.5Specification section 088000-3.5 does not list a basis of design. It calls for low-e coating to be on #3 surface. Please confirm Vitro clear Solarban 60 #2 with argon gas is acceptable for exterior storefront glazing.To be coordinated with Energy consultant.
39
37Civil Drawings - Multi-Family OnlyAre there Civil Drawings specifically for this multi-family parcel only? The Civils provided with the RFP appear to be for the entire site development project. This will cause confusion across all civil pages and details as to what scope is to be carried with this project, and what is out of scope. Can the Civil Engineer and Owner issue a Site Scope Narrative?The improvements shown in the Civil Drawings only encompass the multifamily building. The project scope is limited to the multifamily portion (Parcel A) of Certified Site Plan 82012010C.
40
38Sheet 19 of 28Please confirm if GC's should include the playground scope of work.No, this item is out of scope.
41
39Sheet 23 of 28Please provide details/direction on the gates shown for the aluminum picket pool fence and the Wooden Fencing shown near the Bocce Ball Court.Pool fencing, including gates, by Deep Stream.
42
40Sheet 3A of 28Please verify if the Monument Sign on Civil Sheet 3A of 28 is in scope or out of scope.No, this item is out of scope.
43
41Sheet 5 of 28Please verify if there are any segmental retaining walls in the project. Is the wall on Civil Sheet 5 of 28 in scope? Any others like that in scope? Please advise.Sheet 5 of 28 is out of scope. All walls for the multifamily project are cast-in-place concrete.
44
42A-015Are the areas of the building which appear to be 5 stories of wood designed as 5A construction, or should be designed and considered as 3A construction? Please advise as this will impact cost at these 5-story areas, and adjacent sections of the building.The code interpretation for these areas is that the basement level is not counted as a story for the purposes of fire code. By this interpretation all areas are allowable as type 5A construction.
45
43A-102There is minimal detail for this Package Management system/Mailboxes. Please provide direction of quantity of mailboxes, and package systems.See revised sheet ID-1105 for mailbox model numbers.
46
44A-102Please provide a quantity and basis of design for bike racks.Bike racks to be bid with vendor. Layout and quantity will be provided once shop drawings will be received.
47
45A-313Please confirm if the GC is to furnish and install additional mailboxes in Mailroom 278, Sheet A313, does not show any mailboxes in this room labeled "mailroom".Mailboxes should be bid with mailbox vendor. Layout and amount of mailboxes will be provided in project after receiving shop drawings.
48
46A-345Details on A345 call for stair handrails and pickets to be Wood or Better and depict details including metal railings. Please confirm metal handrails and pickets are acceptable stair locations.Wood handrails to be used. Drawings will be updated to show wood as only option for interior stairs.
49
47A-400Please provide the basis of design and type of window treatment for this project."BOD for units is Draper flexShade Ascend
Mounted at window, within jambs with clean anodized square-style fascia
Bedrooms: SheerWeave SW7100RD ATF oyster/beige
Living area: SheerWeave SW2400 (2410) 3% oyster/beige


BOD for common areas is a sheer roller shade for sun protection with a motorized function.
Draper FlexShade Recharge
Mounted at window, within jambs with clean anodized square-style fascia
SheerWeave SW2400 (2410) 3% oyster/beige"
50
48A-400Please verify if unit kitchens will include tile backsplashes or paint finish.Backsplash tile T-11 as indicated on millwork sections and unit elevations.
51
49A-400Please verify if unit kitchens and bathroom room countertops will include 4" solid surface backsplashes at countertop locations only.T-10 wall tile behind all unit vanities as indicated on unit elevations.
52
50A-500Various storefront doors (180, 180A, 185A, etc.) are listed as type “O” doors. Type “O” elevation on A-500 does not appear to be ADA compliant, please confirm these doors should be revised to typical type “D” wide stile storefront doors with 10” ADA bottom rails. If this is not correct, please provide basis of design for type “O” doors.Indicated SF door will be updated to be type D.
53
51A-500Storefront elevation SF-1 appears to be located near a pool. Please confirm if laminated glazing is desired at these locations.Client to respond accordingly.
54
52A-500Openings 184A, 184B, 184C and 185M were originally aluminum with hardware set 001. The drawings dated 12/03/24 now show wood doors in hollow metal frames but with the same hardware 001. What hardware is required for these openings?Hardware set #013 to be used for indicated doors. Door schedule will be updated accordingly.
55
53A-500Please confirm if the doors at the trash enclosure are to be hollow metal swing doors or Overhead coiling doors. The Door Schedule on A500 calls for (2) hollow metal swing doors, but the elevation on A317 depicts (2) overhead coiling doors. Please clarify.Trash enclosure doors will be overhead coiling doors. Drawings will be updated accordingly.
56
54A-500Door schedule A-500: there are a few ‘Glass’ doors that require a 45 min Fire Rating. However, there is no spec section for this. Only the 084113 Storefronts section which applies to the non-rated doors.Thermal hollow metal doors with insulated glass meeting the project's performance requirements are acceptable.
57
55A503Window schedule (A-503) shows all window elevations and include a 4” wide piece around all sides of each window, presumably exterior trim. This is not labeled and no indication of these are shown on the window details. (a.) Is this part of the window or exterior trim? and (b.) If part of the windows, please provide additional information & details of this component.Trim is specified as Supera Flange in manufacturer specifications.Refer to INTUS window specs.
58
56A503General Glazing Notes #7 & #8 on A-503 indicate STC 33 or STC 41 if by highways or airports. There don't seem to be any highways or airports near this jobsite. Is STC 33 for all windows required?Project is not considered in close proximity to highways or airports.
59
57A503Vinyl Window Specification calls for Vinyl windows, however, Sheet A503 calls for Aluminum windows. Please clarify the window type for this project? Are Vinyl Windows acceptable in lieu of Aluminum?The BOD exterior windows are Intus Supera windows and matched Intus Balcony Doors. Contact: Jeff Nail 571-544-3243 jeff@intuswindows.com.
60
58A503Please confirm if a MI Single-hung vinyl window is acceptable as a more cost-effective substitute to the aluminum windows.The BOD exterior windows are Intus Supera windows and matched Intus Balcony Doors. Contact: Jeff Nail 571-544-3243 jeff@intuswindows.com Any substitution would need to be of equal or better performance. And specifically qualified with a proposed Add / Deduct.
61
59A503The windows in the plans are detailed and scheduled as Aluminum with Sliding windows and notes for typical aluminum window ratings. The specifications are for Intus Steel Reinforced Polymer (Vinyl) windows with typical Intus rating requirements. Please note, the design calls for many sliding windows, but Intus doesn't offer sliding windows (only casement or awning), so for this option, all of the operable slider sash will be replaced with operable casements. Please verify the basis of design window for this project.The BOD exterior windows are Intus Supera windows and matched Intus Balcony Doors. Contact: Jeff Nail 571-544-3243 jeff@intuswindows.com.
62
60A-504ASheet A-504A elevation SF-4, door 181, and door 185L shows a hatch pattern on the glass for door 275. Please clarify what this is meant to indicate (i.e. louver, spandrel, film, frosted glass, etc.)Door panel for door #275 will be updated to be type C. Refer to A-500 for panel type.
63
61A-504APlease confirm fire rated storefront door 184D can be revised to 72” x 96” door opening. If acceptable, please confirm if SF-33 height should be revised to 98” or if a small transom is desired.Noted revisions are acceptable alternates. Please provide pricing and list as a qualification.
64
62A-504APlease confirm fire rated storefront door 185L can be revised to 72” x 96” door opening. If acceptable, please confirm if SF-31 height should be revised to 98” or if a small transom is desired.Noted revisions are acceptable alternates. Please provide pricing and list as a qualification.
65
63A-600AA/E please confirm the F.F. elevations listed on civil drawing 4 of 12 (1st Floor 561.00, 2nd Floor 573.00, 3rd Floor 585.00) are the correct slab on grade F.F elevations per level breakouts shown on S-200. Please provide all change in F.F. slab on grade elevations on the architectural plans.Level differences are correct.
66
64A-800Please confirm design intent behind prefabricated balconies. Are these balconies precast? Pressure Treated Wood?Basis of design balcony is prefabricated aluminum. Alternate is requested for wood framed (site built) balcony and railing.
67
65G-000Please verify if this project will meet LEED Platinum and/or NBGS Silver as the drawings have contradicting notes.The project is pursuing several certifications including Energy Star ZERH, LEED Multifamily Midrise Platinum , NGBS Silver Certification, and PHIUS Certification.
68
66FramingPlease confirm that 3/4" square edge w/ply clips will be acceptable in lieu of 3/4" T&G for roof sheathing.BASE4 needs more information, possibly manufacturer or construction information to check with our design to confirm and to give accurate response for the fastener substitution.
69
67S-102Note 6.h refers to "Franchise Brand Standards" as an integral part of the construction documents. Please provide the "Franchise Brand Standards" for review if applicable.This note is not applicable in this project as this is multifamily
and not franchise, BASE4 will remove this note.
70
68S-102Note 10.g. states that long-strip construction method should be used for SOG. Is this required?Note 10.g is a preferred method to provide crack control when constructing the SOG.
GC can provide their method of construction to provide crack control that BASE4 will then review.
71
69S-103Note 28 refers to Hollow Core Slabs. Please clarify where hollow core slabs are being used or confirm notes are not required.Most of the notes in the structural drawings are typical notes that apply when the applicable materials are used, BASE4 can remove them from drawings if requested.
72
70S-200ATypical - Foundation Note #14 requires GC to adjust footing accordingly based on grade elevation and site grades. Please provide stepped footing details/parameters required to transition top of footing grades from one elevation to another to accommodate this note/requirement.BASE4 will add the typical stepped footing details in drawings.
73
71S-200AIn addition to Typical Foundation Note #14 regarding top of footing elevations. A/E please provide top of footing elevations that have been coordinated with dry and wet utility area of influence including but not limited to storm sewer, sanitary sewer (entering the building), water service (entering the building), duct bank (entering the building).Footing elevatiosn and details provided in Contract Documents. Coordination fo final locations is by General Contractor.
74
72Condensing Units on BalconiesThe plans indicate the split system condensers to be on the unit balconies. This is extremely atypical here in the US. Is this design due to avoiding the new A2L refrigerant shaft design issue? What precautions have been discussed with having this unit completely accessible by the resident, the noise that will inevitably impact the resident, and are these condensers placed an acceptable distance away from the units, per code?The units have been placed on the balconies similar to past projects to maximize roof area for solar panels. Alternative mounting options may be proposed. An alternate has been requested to install a cover (Airdeko or similar) over the unit to make it inaccessible.
The provided condensing unit operates with low noise levels as per the manufacturer's submittal, so BASE4 believes this noise issue will not occur in the residence.
75
73New RefrigerantThe specs still call for the old R-410 refrigerant, and none of that equipment is available or will be available due to the new EPA requirements and subsequent A2L. Will this project require the rated shafts that have been designed into all new multi-family apartment buildings since the ruling? Is there a redesign of this project underway which is incorporating these shafts? This will have a significant cost impact if clear direction is not provided during these RFI responses.HVAC systems should be priced with available equipment / refridgerants. If shafts are required in the future they will be added by addendum.
BASE4 will revise the HVAC equipment as per the new EPA requirement. Additionally, a shaft will be added if necessary.
76
74Dry Utility PlansPlease provide all Dry Utility Plans, if available, as applicable to this project.Dry Utility plans have now been posted under the "Civil" drawing set.
77
75P101Does this project require water submeters by the GC or are the water submeters, if applicable, by Owner?The Owner will furnish the water and electrical submetering system materials. The GC and it's contractors shall install and assist with commissioning.
78
76NFPA 13 or 13R at ApartmentsPlease verify if the apartments/building areas are going to be coded for NFPA 13 or NFPA 13R, as the code analysis page does not state this information like it does for the NFPA 13 Garage. Verify with Owner if insurance requirements dictate a direction.Apartments/building area is going to be coded for NFPA 13.
79
77A-504CStorefront door 100.1B appears to be part of elevation SF-22, but is not shown on A-504C
elevation, please clarify.
Elevation view for SF-22 will be updated to include 100.1B door.
80
78A-601Per Garage door schedule sheet A-601, there are fifteen (15) storefront doors in the garage, all appear to be 45 minute fire rated with automatic operators. Please confirm this is the design intent as this will add significant cost to the project.Thermal hollow metal doors with insulated glass meeting the project's performance requirements are acceptable.
81
79SpecificationsPlease provide clarifications and a spec section for window treatments and the desired products/locations for unit and amenity blinds.Set allowance for $150,000.
82
80Interior Design SpecsThe Interior Design Specs file contains another copy of the FF&E Specifications. Please provide the correct file for the ID Specs.ID Specs have been provided in ID Drawings.
83
81Spec 014339Specification Section 014339 for Mockups calls for an exterior mockup of size, location, etc. "as indicated" but a mock up plan has not been provided. Please provide.Mockups shall be provided as directed by owner. Drawings can be provided as needed for each mockup upon request.
84
82Spec 061000, S-102Please confirm that 19% MC lumber is acceptable for all framing lumber as stated in the Timber Notes on S-102 and 15% MC is not required at non-preservative treated lumber as stated in Specification Section 061000 for Rough Carpentry.Confirmed.
85
83A-500Frames for pantry doors UN-I1, UN-I2, and UN-I3 within apartment units are shown as HM in the Unit Door Schedule. Please confirm that wood door frames matching the rest of the unit interior doors are acceptable.Confirmed.
86
84A-500Unit mechanical door UN-J2 which is located within the building corridor is shown in the Unit Door Schedule as a fully louvered SCW door with a 45 minute rating. It appears that this is not an available product. Please confirm that a louvered HM door assembly is acceptable.Please utilize the largest manufacturer recommended fire rated louver (BOD TruDoor Air Louvers 1900A).
87
85A-500Unit interior doors are shown in the Unit Door Schedule as 1-3/4" thick which is not typical and creates added cost for the doors and finish carpentry. Please confirm that 1-3/8" thick doors on casing-applied split-jamb frames are acceptable.1 3/8" thick doors are acceptable. Door schedule will be updated accordingly.
88
86A-500All unit interior doors are shown in the Unit Door Schedule as SCW which is also not typical and creates significant added costs. Please clarify if all unit interior doors are acceptable as HCW or if all doors except bedrooms and bathrooms are acceptable as HCW with the beds & baths remaining SCW.Price as all doors SCW. Please provide deduct to HCW for all doors except bedrooms and bathrooms are acceptable as HCW with the beds & baths remaining SCW.
89
87A-500All of the "glass" panel type doors in the Common Area Door Schedule are shown with HM frames. Confirm that the following door marks are aluminum storefront doors in aluminum frames since they either occur within areas of storefront windows or are door panel type "O": 180, 180A, 181, 184D, 185A, 185B, 185C, 185D, 185E, 185F, 185G, 185H, 185I, 185J, 185L, 190, 194, 273, 273B, 275, 276C. Confirm that the following door marks are HM doors in HM frames: 100.1B, 200.9A, 287B.All doors with glass panels and doors which are part of SF will be updated to be aluminum.
90
88Garage Set A-601There are fifteen doors on the garage door schedule that are called out as "Glass" and they are depicted as aluminum storefront on drawing A-530. These doors have a "C-Label which means that they have to be 45-minute fire rated and that will make them very expensive. Please confirm if Hollow Metal Doors with Glass is an acceptable substitute.Thermal hollow metal doors with insulated glass meeting the project's performance requirements are acceptable.
91
89Residential Set A-500Doors 273 and 185L for the residential building are shown as 45-minute rated but appear to have louver panels, which cannot be fire rated. Please confirm what is required.Please utilize the largest manufacturer recommended fire rated louver (BOD TruDoor Air Louvers 1900A).
92
90Residential Set A-300Drawings A-300 and A-300A show a Porte Cochere described as "by other". Please confirm if this is intended to be design/build within the GC's scope.Porte Cochere to be bid out to a manufacturer. Further details will be provided once received shop drawings.
93
91Spec 084113, A-504ASheet A-504A has a Storefront/Curtain Wall note #1 calling for clear anodized finish. This is contradictory to 084113, please clarify.Specs to be updated.
94
92ID-412, Unit PlansA finish is not specifically called out for the townhome unit stairs. Please confirm that matching treads and risers for RT-11 LVT should be included. Railing requirements are also not provided. Confirm that a painted pine railing on one side of the stairway is acceptable.RT-11 LVT to be used on unit stairs.
95
93ID-412, ID-1003, Unit Plans, A-802Based on the plans, it appears that unit interior trim should be included as base molding, door casing, and window stool only (no window casing or apron per window details), but trim profiles for door casing window stool have not been provided. Please confirm that the same casing used on the unit entries at corridors, Mouldings One 2001, or an equal should be used at unit interior doors and that WM1021 window stool is acceptable. Additionally, confirm that primed FJ Pine is acceptable for painted wood trim in units and common areas.Please assume any window sills, wall caps, and counters at drywall will have stool trim. Unit interior doors must have shop applied trim. Other items on finish and quality are acceptable.
96
94NAWhat is the anticipated award date?Refer to RFP Answer #4 of Addendum 1 of RFP #2495.
97
95RFP Page 1 of 56, Part I.BParagraph two days, "The project is targeting sustainable building certifications including LEED Platinum (USGBC) and Passive House (PHIUS) as well as Energy Star Net Zero Energy Ready (DOE). However, the specifications only include requirements for LEED-Certified. Please clarify the sustainable / green building requirements.The project is pursuing several certifications including Energy Star ZERH, LEED Multifamily Midrise Platinum , NGBS Silver Certification, and PHIUS Certification.
98
96NADue to the RFP being posted right before the holidays, please provide two more weeks to submit the proposal (proposed due date, 2/14/25).As discussed in the Pre-Proposal Conference, the bid date has not been altered at this time.
99
97RFP Page 43 of 56, Part IRegarding "Respondents Personnel", are you looking for corporate (Executive Leadership, estimating, etc.) personnel or project team personnel?Project Team Personnel which may include corporate / department level personnel.
100
98Approved Site PlanArchitectural drawings are included in the approved site plan. Please confirm these architectural drawings have been superseded by the architectural drawings dated. 12/3/24.Confirmed.