Notes: %done is an estimate of the amount of task completed. Last refers to last week, Current refers to the current week. The green background indicates areas where significant time has been spent. The green background under Next indicates planned work for the following week. Note that progress is not linear and it typically exponential, with most progress being noted near the end when the number known-unknowns has gone to zero and the number of possible unknown-unknowns is very small.
3
4
5
6
7
Item% doneStartEndComment
8
5-Jun11-Sep18-Sep25-Sep2-Oct9-OctNext
9
COMMON
10
TMRG slides205/187/1Communicated with Xavi to prep for this
11
TMRG & HCC OutputPath Review7/107/10
12
Build Nandor's computer205/197/23Not critical; removing
13
Install Nandor's computerNot critical; removing
14
Module level simulation5--V0 version had been set up (for HCC FDR)
15
16
17
AMACStar
18
Gating of clock phases579/7Receive ABC block from Pedro
19
Measurement of AMAC current from LinPOL12v6/127/6Mostly analog with some digital support
20
Verification issue - timing violations w & w/o GUI204/136/24Not an issue anymore
21
SET simulation - PNR751004/158/1
22
Understand failure of PNR optimization step6/177/1Solved
23
Review of digital design10855/20Looking at timing violations; synthesis details
24
-- Review reset scheme/timing15505/21
25
Double check Register assignments
26
SEE simulation code review and follow-up7/3Adrian/Sicong/Ben/Bill/PTK
27
PNR review - preliminary1/1Ongoing
28
Design finalization
29
Specification update60
30
FDR Prep1006/227/24FDR: 24 July
31
FDR Follow-up808385878/3
32
33
HCCStar
34
HCC OutputPath ReviewNeed to shedule
35
Fix TMRG implementations of aFIFO931005/288/10
36
Design dual clock buffer955/206/25
37
Update PacketBuilder1006/188/10
38
-- No-cluster clusters from output stream1006/248/20
39
Digital Design check206/29
40
Replace LCB decoder with Verilog version255095971003/210/2
41
-- Adjust register implementation205095971003/210/2
42
-- Rewrite LCB passthru in Verilog
43
-- Rewrite LCB 40 MHz clock recovery in Verilog
44
Switch to synchronous resets202550903/2
45
Update HPR module (triplicated)?
46
Renumber Input Channels
47
Explore std cell use wrt Pedro's do_not_use list306/26/25We wil not pursue this; low priority
48
Make/install PNR version of 1ch AM1006/16/1
49
Verify source of intra-packet IDLEs (reported by Bruce)100--Sequence from Bruce is 2 ABC LP packets
50
Recheck high speed serializer755/13Review from CHiPS pending; 2nd week July
51
V0 validation w/ physics-mode operation20?805/20Jeff/James/Bruce working on it
52
Verification stripped down verilog for 640 MHz simulation305/106/24Will need to revisit with final design
53
Analog simulation of 640 MHz clock path--6/19Nandor - will need to revisit with final design
54
SEE simulations2535455055Potentially a big time sink
55
Explore differences between full chip & standalone sims105/136/24
56
Define and write additional flow control verification
57
Double check Register assignments
58
PNR review - preliminary1/1Ongoing
59
Design finalization
60
Specification update
61
FDR Prep
62
FDR Follow-up
63
64
Other
65
HCC Probe Station setup59/25
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100