T&C Requirement Sheet of BMS
2
Sr. No.Test DescriptionFATSAT
3
BMS
4
1Physical inspection and specs. Verification - This has to be carried out as per the Pre-Cx check sheet given in the commissioning plan/method statement.XY
5
2I/O summary verification - Each point has to be verified as per the approved I/O summary.XY
6
3Graphic verification - System graphics for each system to be verified as per approved graphicsXY
7
4Graphic status & alarm verification with filed devices - Each status on the graphic has to be verified with respect to field status. Alarm pop up page, real time alarm, alarm history logging, etc. has to be verified.XY
8
5Graphic values verification with filed values - All graphic values has to be calibrated and verified as per the field values.XY
9
10
Test Instrumentation Required/Considered For SAT
11
Sr. No.DescriptionQty.
12
1True RMS Multi-meter1 No.
13
2True RMS Clamp meter1 No.
14
3Temporary UPS for Pre-Commissioning1 No.
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100