1 | FDP Form - Bid Results on Civil Works Note: Bid Results are in three (3) separate forms, particularly, for Civil Works (Form 10a - CW), Goods and Services (Form 10b - GS) and Consulting Services (Form 10c - CS). If there is no bidded project, good or service for the quarter, the forms must still be submitted with the said notation and signed accordingly. | |||||||||||||||||||||||||
2 | ||||||||||||||||||||||||||
3 | ||||||||||||||||||||||||||
4 | ||||||||||||||||||||||||||
5 | CIVIL WORKS BID-OUT | |||||||||||||||||||||||||
6 | Province, City or Municipality: Antipolo City | |||||||||||||||||||||||||
7 | 1st Quarter, CY 2022 | |||||||||||||||||||||||||
8 | ||||||||||||||||||||||||||
9 | No. | Reference No. | Name of Project | Approved Budget for Contract | Location | Winning Bidder | Name and Address | Bid Amount | Bidding Date | Contract Duration | ||||||||||||||||
10 | ||||||||||||||||||||||||||
11 | 1 | ANTIPOLO-27JANUARY2022-01 | Rehabilitation/Improvement of Drainage Canal System at Brgy. San Isidro, Antipolo City (2022–Package 01) a. Rehabilitation/Improvement of Drainage Canal at (Portion) M.H. Del Pilar St. (From Dela Paz St. to C. Lawis St.) Brgy. San Isidro, Antipolo City b. Improvement of Drainage System along London Street at Brittany 2 Executive Homes, Circumferential Road, Brgy. Isidro, Antipolo City | a. ₱ 2,304,949.00 b. ₱ 400,000.00 -------------------- ₱ 2,704,949.00 | Brgy. San Isidro, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | a. ₱ 2,292,167.83 b. ₱ 397,782.17 -------------------- ₱ 2,689,950.00 | Jan. 27, 2022 | 210 | ||||||||||||||||
12 | 2 | ANTIPOLO-27JANUARY2022-02 | Repair/Repainting/Improvement of Stage, Covered Court and School Building at Marcelino M. Santos NHS and Repair / Repainting of ComputerLearning Center at Brgy. San Jose, Antipolo City (2022 – Package 02) a. Repair/Repainting of Stage at Marcelino M. Santos National High School at Sitio Tagbac, Brgy. San Jose, Antipolo City b. Repair / Repainting of Computer Learning Center at Sitio Kaysakat, Barangay San Jose, Antipolo City c. Improvement of Covered Court Flooring, Electrical Wiring and Equipment at Marcelino M. Santos National High School at Sitio Tagbac, Brgy. San Jose, Antipolo City d. Improvement of Four (4) Storey, Twenty (20) Rooms DepEd School Building at Marcelino M. Santos National High School at Sitio Tagbac, Brgy. San Jose, Antipolo City | a. ₱ 142,358.59 b. ₱ 572,545.93 c. ₱ 597,447.34 d. ₱ 382,470.99 -------------------- ₱ 1,694,822.85 | Brgy. San Jose, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | a. ₱ 141,518.63 b. ₱ 569,167.73 c. ₱ 593,922.23 d. ₱ 380,214.29 -------------------- ₱ 1,684,822.88 | Jan. 27, 2022 | 210 | ||||||||||||||||
13 | 3 | ANTIPOLO-27JANUARY2022-03 | Concreting of Road Lot 16 at PCUP-RPG Ville (Ondoy Village), Brgy. San Jose, Antipolo City | ₱1,730,000.00 | Brgy. San Jose, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 1,719,000.00 | Jan. 27, 2022 | 180 | ||||||||||||||||
14 | 4 | ANTIPOLO-27JANUARY2022-04 | Improvement of Day Care and Repair/Renovation of Comfort Room and Waiting Area atBrgy. San Jose&Brgy. San Isidro, Antipolo City (2022 – Package 03) a. Improvement of Day Care Center at Sitio Aduas, Barangay San Jose, Antipolo City b. Repair/Renovation of Comfort Room and Waiting Area at SPED Center, Brgy. San Isidro Antipolo City | a. ₱ 1,499,428.74 b. ₱ 758,344.04 ------------------- ₱ 2,257,772.78 | Brgy. San Jose and Brgy. San Isidro, Antipolo City | 1C4M BUILDERS INC. | Meynard C. Ko Antipolo City | a. ₱ 1,493,813.38 b. ₱ 748,293.15 ------------------- ₱ 2,242,106.53 | Jan. 27, 2022 | 210 | ||||||||||||||||
15 | 5 | ANTIPOLO-27JANUARY2022-05 | Construction of Drainage System at Oreta Rd. Brgy. San Isidro, Antipolo City | ₱4,847,617.76 | Brgy. San Isidro, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | 4,832,500.00 | Jan. 27, 2022 | 210 | ||||||||||||||||
16 | 6 | ANTIPOLO-27JANUARY2022-06 | Road Improvement at Knights of Columbus Community (Phase II) atBarangay San Roque, Antipolo City | ₱2,005,314.23 | Brgy. San Jose, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | 1,992,200.00 | Jan. 27, 2022 | 210 | ||||||||||||||||
17 | 7 | ANTIPOLO-27JANUARY2022-07 | Concreting of Road Lot 15 at PCUP-RPG Ville (Ondoy Village), Brgy. San Jose, Antipolo City | ₱1,750,000.00 | Brgy. San Jose, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | 1,736,000.00 | Jan. 27, 2022 | 180 | ||||||||||||||||
18 | 8 | ANTIPOLO-27JANUARY2022-08 | Construction of Fence and Replacement/Improvement of Various School at Brgy. Dela Paz, Antipolo City (2022 – Package 04) a. Construction of Fence at Dela Paz Elementary School, Brgy. Dela Paz , Antipolo City b. Replacement and Additional Electrical Equipment of Various School Buildings at Dela Paz National High School, Brgy. Dela Paz, Antipolo City | a. ₱ 1,050,000.00 b. ₱ 250,759.66 ------------------- ₱ 1,300,759.66 | Brgy. Dela Paz, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | a. ₱ 1,041,291.62 b. ₱ 246,408.38 ------------------- ₱ 1,287,700.00 | Jan. 27, 2022 | 180 | ||||||||||||||||
19 | 9 | ANTIPOLO-27JANUARY2022-09 | Repair/Repainting of Three (3) Storey, Nine (9) Classrooms Ynares School Building at Juan Sumulong Elementary School, Brgy. San Roque, Antipolo City | ₱1,100,000.00 | Brgy. San Roque, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 1,086,000.00 | Jan. 27, 2022 | 180 | ||||||||||||||||
20 | 10 | ANTIPOLO-27JANUARY2022-10 | Repair/Improvement of Various School Buildings and Barangay Health Station at Brgy. Dela Paz and Brgy. San Isidro, Antipolo City (2022 – Package 05) a. Repair of Four(4) Storey, Sixteen(16) Classrooms at Dela Paz National High School, Brgy. Dela Paz, Antipolo City b. Repair of Comfort Room at San Isidro National High School, Brgy San Isidro, Antipolo City c. Improvement of Two (2) Storey Barangay Health Station Sitio Maligaya, Barangay San Isidro, Antipolo City | a. ₱ 385,106.19 b. ₱ 680,045.18 c. ₱ 243,764.22 ------------------ ₱ 1,308,915.59 | Brgy. Dela Paz and Brgy. San Isidro, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | a. ₱ 382,785.40 b. ₱ 678,106.37 c. ₱ 238,289.62 ------------------ ₱ 1,299,181.39 | Jan. 27, 2022 | 180 | ||||||||||||||||
21 | 11 | ANTIPOLO-27JANUARY2022-11 | Concreting of Road Lot 34 at PCUP-RPG Ville (Ondoy Village), Brgy. San Jose, Antipolo City | ₱1,230,000.00 | Brgy. San Jose, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | 1,218,047.92 | Jan. 27, 2022 | 180 | ||||||||||||||||
22 | 12 | ANTIPOLO-27JANUARY2022-12 | Concreting of Road Lot 14 at PCUP-RPG Ville (Ondoy Village), Brgy. San Jose, Antipolo City | ₱1,760,000.00 | Brgy. San Jose, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | 1,747,000.00 | Jan. 27, 2022 | 180 | ||||||||||||||||
23 | 13 | ANTIPOLO-27JANUARY2022-13 | Repair/Repainting/Improvement at Brgy. Cupang and Brgy. San Jose, Antipolo City (2022 – Package 06) a. Repair/ Repainting Works at Satelite Canteen Bldg. at Cupang National High School, Brgy. Cupang, Antipolo City b. Improvement of Covered Court Flooring atthe Back of San Jose Barangay Hall, Brgy. San Jose, Antipolo City | a. ₱ 574,042.81 b. ₱ 359,860.95 ------------------- ₱ 933,903.76 | Brgy. Cupang and Brgy. San Jose, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | a. ₱ 568,000.00 b. ₱ 356,000.00 ------------------- ₱ 924,000.00 | Jan. 27, 2022 | 180 | ||||||||||||||||
24 | 14 | ANTIPOLO-27JANUARY2022-14 | Improvement of Alleys at Phase II Bagong Nayon II, Brgy. San Isidro, Antipolo City (2022 – Package 07) a. Improvement of Alley 33 of Phase II Bagong Nayon II, Brgy. San Isidro, Antipolo City b. Improvement of Alley Between Blk. 18 And Blk. 62 of Phase II Bagong Nayon II, Brgy. San Isidro, Antipolo City | a. ₱ 521,559.31 b. ₱ 576,685.15 ------------------- ₱ 1,098,244.46 | Brgy. San Isidro, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | a. ₱ 515,385.00 b. ₱ 569,858.88 ------------------- ₱ 1,085,243.88 | Jan. 27, 2022 | 180 | ||||||||||||||||
25 | 15 | ANTIPOLO-27JANUARY2022-15 | Rehabilitation of Road at Oreta Rd. Brgy. San Isidro, Antipolo City | ₱1,548,542.16 | Brgy. San Isidro, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | 1,534,500.00 | Jan. 27, 2022 | 180 | ||||||||||||||||
26 | 16 | ANTIPOLO-27JANUARY2022-16 | Repair/ Repainting Works and Construction of Additional Hand Wash Facility at Various Schools, Brgy. Cupangand Brgy. Mayamot, Antipolo City (2022 – Package 08) a. Repair/ Repainting Works at 2Storey 2 Rooms DPWH Building 1 at Cupang National High School, Brgy. Cupang, Antipolo City b. Construction of Additional Hand Wash Facility at Mayamot Elementary School, Brgy. Mayamot, Antipolo City | a. ₱ 639,003.95 b. ₱ 238,840.05 ------------------- ₱ 877,844.00 | Brgy. Cupang and Brgy. Mayamot, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | a. ₱ 633,171.70 b. ₱ 234,690.60 ------------------- ₱ 867,862.30 | Jan. 27, 2022 | 180 | ||||||||||||||||
27 | 17 | ANTIPOLO-27JANUARY2022-17 | Improvement of Covered Court Flooring and Drainage Canal at Peace Village and Bagong Nayon II, Brgy. San Luis, Antipolo City (2022 – Package 09) a. Improvement of Covered Court Flooring at Peace Village Phase 2, Brgy. San Luis, Antipolo City b. Improvement of Covered Court Flooring at Peace Village Phase 3, Brgy. San Luis, Antipolo City c. Improvement of Drainage Canal at Phase 2B Bagong Nayon II, Brgy San Luis, Antipolo City | a. ₱ 257,823.60 b. ₱ 293,100.07 c. ₱ 374,113.62 -------------------- ₱ 925,037.29 | Brgy. San Luis, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | a. ₱ 255,036.43 b. ₱ 289,931.56 c. ₱ 370,069.30 -------------------- ₱ 915,037.29 | Jan. 27, 2022 | 180 | ||||||||||||||||
28 | 18 | ANTIPOLO-27JANUARY2022-18 | Repair/ Repainting of School Stage, School Comfort Room and School Canteen at Various Schools, Brgy. Calawis, Antipolo City (2022 – Package 10) a. Repair/ Repainting of School Stage at Binayoyo Integrated School, Sitio Binayoyo, Brgy. Calawis, Antipolo City b. Repair/ Repainting of Comfort Room at Calawis Elementary School, Brgy. Calawis, Antipolo City c. Repair/ Repainting of School Stage at Calawis Elementary School, Brgy. Calawis, Antipolo City d. Construction of School Canteen at Binayoyo Integrated School, Sitio Binayoyo, Brgy. Calawis, Antipolo City | a. ₱ 244,998.97 b. ₱ 282,425.03 c. ₱ 358,702.11 d. ₱ 1,455,279.52 --------------------- ₱ 2,341,405.63 | Brgy. Calawis, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | a. ₱ 243,670.00 b. ₱ 280,380.00 c. ₱ 357,765.43 d. ₱ 1,444,779.75 --------------------- ₱ 2,326,595.18 | Jan. 27, 2022 | 180 | ||||||||||||||||
29 | 19 | ANTIPOLO-27JANUARY2022-19 | Concreting of Road with Drainage at Aster St. Bermuda Heights Subdivision, Brgy. San Luis, Antipolo City | ₱2,763,514.76 | Brgy. San Luis, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | 2,748,500.00 | Jan. 27, 2022 | 150 | ||||||||||||||||
30 | 20 | ANTIPOLO-27JANUARY2022-20 | Repair / Repainting of Covered Pathwalk and School Building at Kaysakat Elementary School, Brgy. San Jose, Antipolo City(2022 – Package 11) a. Repainting of Covered Pathwalkat Kaysakat Elementary School, Brgy. San Jose, Antipolo City b. Repair / Repainting of Two (2) Storey, Four (4) Rooms PLED Building at Kaysakat Elementary School, Brgy. San Jose, Antipolo City | a. ₱ 203,168.48 b. ₱ 934,767.06 ----------------- ₱ 1,137,935.54 | Brgy. San Jose, Antipolo City | FLS CONSTRUCTION & BUILDERS | Felimon Santos Taytay, Rizal | a. ₱ 200,490.00 b. ₱ 922,445.88 ----------------- ₱ 1,122,935.88 | Jan. 27, 2022 | 180 | ||||||||||||||||
31 | 21 | ANTIPOLO-27JANUARY2022-21 | Repair/ Repainting of Comfort Room and Improvement of Covered Court Flooring at Brgy. Calawis, and Brgy. San Jose, Antipolo City (2022 – Package 12) a. Repair/ Repainting of Comfort Room at Apia Integrated School, Sitio Apia, Brgy. Calawis, Antipolo City b. Improvement of Covered Court Flooring at Apia Elementary School, Brgy. Calawis, Antipolo City c. Improvement of Covered Court Flooring at Joyous Heights Subdivision, Brgy. San Jose, Antipolo City d. Improvement of Covered Court Flooring at PCUP-RPG Ville, Brgy. San Jose, Antipolo City e. Improvement of Covered Court Flooring at Friendship Homeowner Association, Sitio Hinapao, Brgy. San Jose, Antipolo City f. Improvement of Covered Court Flooring at Sitio San Joseph, Brgy. San Jose, Antipolo City | a. ₱ 372,013.76 b. ₱ 293,100.07 c. ₱ 217,237.21 d. ₱ 181,157.37 e. ₱ 144,532.98 f. ₱ 331,005.66 --------------------- ₱ 1,539,047.05 | Brgy. Calawis, and Brgy. San Jose, Antipolo City | PST CONSTRUCTION | Procopio S. Torres Jr. Antipolo City | a. ₱ 369,031.51 b. ₱ 285,212.91 c. ₱ 215,585.84 d. ₱ 180,818.76 e. ₱ 144,468.81 f. ₱ 330,995.15 --------------------- ₱ 1,526,112.98 | Jan. 27, 2022 | 210 | ||||||||||||||||
32 | 22 | ANTIPOLO-27JANUARY2022-22 | Repair/ Repainting /Rehabilitation Works of Various School Building, Brgy San Isidro Antipolo City(2022 – Package 13) a. Repair/ Rehabilitation Works of Two(2) Storey Four (4) Rooms VRS Building at San Isidro Elementary School, Brgy San Isidro Antipolo City b. Repair/Repainting Works of Two (2) Storey Four (4) Rooms PLEDBldgat San Isidro National High School, Brgy San Isidro, Antipolo City c. Repair/Repainting of Three (3) Storey Nine (9) Rooms ACG Building at BagongNayon II National High School - Main, Brgy. San Isidro, Antipolo City | a. ₱ 1,494,068.14 b. ₱ 829,993.21 c. ₱ 1,504,634.07 -------------------- ₱ 3,828,695.42 | Brgy San Isidro Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | a. ₱ 1,492,814.81 b. ₱ 824,504.26 c. ₱ 1,496,845.28 -------------------- ₱ 3,814,164.35 | Jan. 27, 2022 | 210 | ||||||||||||||||
33 | 23 | ANTIPOLO-27JANUARY2022-23 | Repair/Repainting/Improvement of School Stage, Covered Court Flooring and Toilets at Sapinit Elementary School, Brgy. San Juan, Antipolo City(2022 – Package 14) a. Repair/Repainting of School Stage at Sapinit Elementary School, Brgy. San Juan, Antipolo City b. Improvement of 15 X24m Covered Court Flooring at Sapinit Elementary School, Brgy. San Juan, Antipolo City c. Improvement of Toilets at 1 Storey 3 Rooms DepEd BODBldg, Sapinit Elementary School, Brgy. San Juan, Antipolo City | a. ₱ 288,279.27 b. ₱ 293,100.07 c. ₱ 362,754.40 ------------------ ₱ 944,133.74 | Brgy. San Juan, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | a. ₱ 285,211.05 b. ₱ 289,990.37 c. ₱ 358,981.22 ------------------ ₱ 934,182.64 | Jan. 27, 2022 | 210 | ||||||||||||||||
34 | 24 | ANTIPOLO-27JANUARY2022-24 | Repair/Repainting/Improvement of Comfort Room,Fence, Barangay Health Station and School Building at Brgy. Mambugan and Brgy. Muntindilaw, Antipolo City(2022 – Package 15) a. Repair/Improvement of Toilets atMambugan II Elementary School, Brgy. Mambugan, Antipolo City b. Repair/Repainting of Six (6) Seater Comfort Room at Mambugan I Elementary School, Brgy. Mambugan,Antipolo City c. Repair/Repainting of Fence at Mambugan II Elementary School, Brgy, Mambugan, Antipolo City d. Rehabilitation/ Improvement of Two (2) Storey Health Station at Brgy. Hall Comp., Muntindilaw, Antipolo City e. Repair/Repainting of Two (2) Storey Four (4) Rooms SM Building at Muntindilaw National High School, Brgy. Muntindilaw, Antipolo City | a. ₱ 325,826.18 b. ₱ 285,464.90 c. ₱ 182,445.90 d. ₱ 169,609.99 e. ₱ 1,109,407.78 -------------------- ₱ 2,072,754.75 | Brgy. Mambugan and Brgy. Muntindilaw, Antipolo City | FLS CONSTRUCTION & BUILDERS | Felimon Santos Taytay, Rizal | a. ₱ 323,443.28 b. ₱ 284,576.31 c. ₱ 180,178.95 d. ₱ 168,538.54 e. ₱ 1,101,049.06 -------------------- ₱ 2,057,786.14 | Jan. 27, 2022 | 180 | ||||||||||||||||
35 | 25 | ANTIPOLO-27JANUARY2022-25 | Improvement/Concreting of Waling-Waling St., Antipolo Valley Subdivision, Brgy. Mambugan, Antipolo City | ₱3,900,000.00 | Brgy. Mambugan, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 3,885,286.37 | Jan. 27, 2022 | 180 | ||||||||||||||||
36 | 26 | ANTIPOLO-27JANUARY2022-26 | Improvement/Rehabilitation of Drainage Canal and Construction of Stone Masonry Wall at Brgy. Mayamot, Antipolo City(2022 – Package 16) a. Improvement/Rehabilitation of Drainage Canal at Ocean St., Virginia Summerville Subd., Brgy. Mayamot, Antipolo City b. Construction of Stone Masonry Wall Beside Atlas St., along Labahan Creek atCrestview Homes Subdivision, Brgy. Mayamot, Antipolo City | a. ₱ 2,379,875.30 b. ₱ 316,838.26 -------------------- ₱ 2,696,713.56 | Brgy. Mayamot, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | a. ₱ 2,369,196.69 b. ₱ 312,929.72 -------------------- ₱ 2,682,126.41 | Jan. 27, 2022 | 180 | ||||||||||||||||
37 | 27 | ANTIPOLO-27JANUARY2022-27 | Construction of Road With Drainage Canal of Road Lot 1 and Portion of Road Lot 13 at Nazarene Ville Phase 3, Brgy. San Roque, Antipolo City | ₱2,500,000.00 | Brgy. San Roque, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | 2,487,000.00 | Jan. 27, 2022 | 120 | ||||||||||||||||
38 | 28 | ANTIPOLO-27JANUARY2022-28 | Construction of MRFat Taguete Elementary School, Brgy. Cupang, Antipolo City | ₱715,841.03 | Brgy. Cupang, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 704,855.85 | Jan. 27, 2022 | 120 | ||||||||||||||||
39 | 29 | ANTIPOLO-27JANUARY2022-29 | Improvement of Storm Drainage Systemand Construction of Road at Brgy. Cupang, Antipolo City(2022 – Package 17) a. Improvement of Storm Drainage System at Taguete Elementary School, Brgy. Cupang, Antipolo City b. Construction of Road 47 Under Pin No. 008-009-021 at Brgy. Cupang, Antipolo City | a. ₱ 829,835.76 b. ₱ 536,039.99 ------------------ ₱ 1,365,875.75 | Brgy. Cupang, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | a. ₱ 821,172.15 b. ₱ 530,327.85 ------------------ ₱ 1,351,500.00 | Jan. 27, 2022 | 180 | ||||||||||||||||
40 | 30 | ANTIPOLO-31JANUARY2022-01 | Construction of Sun Baffles at City Mall of Antipolo, Brgy. Dela Paz, AntipoloCity | ₱4,000,000.00 | Brgy. Dela Paz, Antipolo City | A,M MAURICIO CONSTRUCTION & BUILDERS INC. | Adrian C. Mauricio Antipolo City | 3,984,663.14 | Jan. 31, 2022 | 150 | ||||||||||||||||
41 | 31 | ANTIPOLO-31JANUARY2022-02 | Various Construction, Repair/Repainting and Improvement of Various Schools and other structures at Brgy. Sta. Cruz and Brgy. San Jose., Antipolo City (2022 – Package18) a. Repair/Repainting of Wash Facility at Sta. Cruz Elementary School, Brgy. Sta. Cruz, Antipolo City b. Construction of Canopy (Portion) for the 10m x 24m Covered Court at Sumilang Elementary School, Brgy. San Jose, AntipoloCity c. Improvement of Stage at Teofila Z. Rovero Memorial Elementary School, SitioHinapao, Brgy. San Jose, Antipolo City d. Improvement of Covered Court Flooring at Sumilang Elementary School, Brgy. SanJose, Antipolo City e. Improvement of Covered Court Flooring atLot 1 Block 18, Phase VI-A, Bagong Nayon II, Resettlement Housing Project, Brgy. Sta Cruz, Antipolo City f. Improvement of Covered Court Flooring at Lot 19 Block 13, Phase VI-A, Bagong Nayon II, Resettlement Housing Project,Brgy. Sta Cruz, Antipolo City g. Improvement of Covered Court Flooring at Lot 20 Block 15, Phase VI-A, Bagong Nayon II, Resettlement Housing Project,Brgy. Sta Cruz, Antipolo City h. Construction of Waiting Shed at Sitio Tanza 2, Brgy. San Jose, AntipoloCity | a. ₱ 63,053.36 b. ₱ 88,054.17 c. ₱ 118,533.42 d. ₱ 217,237.21 e. ₱ 135,901.71 f. ₱ 135,901.71 g. ₱ 135,901.71 h. ₱ 170,734.97 ------------------ ₱ 1,065,318.26 | Brgy. Sta. Cruz and Brgy. San Jose, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | a. ₱ 62,301.03 b. ₱ 87,165.24 c. ₱ 117,156.15 d. ₱ 214,748.12 e. ₱ 134,328.80 f. ₱ 134,328.80 g. ₱ 134,328.80 h. ₱ 168,893.85 ------------------ ₱ 1,053,250.79 | Jan. 31, 2022 | 210 | ||||||||||||||||
42 | 32 | ANTIPOLO-31JANUARY2022-03 | Construction of Road with Drainage Canal of Road Lot 5 at Nazarene Ville Phase 3, Brgy. San Roque, Antipolo City | ₱1,002,747.04 | Brgy. San Roque, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | 989,785.00 | Jan. 31, 2022 | 180 | ||||||||||||||||
43 | 33 | ANTIPOLO-31JANUARY2022-04 | Repair of Perimeter Fence and Improvement of Covered Court at Brgy. Dela Paz and Brgy. Dalig, Antipolo City (2022 – Package 19) a. Repair of Perimeter Fence of Ynares Multi - Purpose Covered Court at PurokLogcom, Barangay Dela Paz, Antipolo City b. Improvement of Covered Court Flooring at Purok Logcom, Brgy. Dela Paz, AntipoloCity c. Improvement of Covered Court Flooring at Ramah Desa Mountain Residences, Brgy. Dela Paz, AntipoloCity d. Improvement of Covered Court Flooring at Bahay Kalinga, Purok Imelda, Brgy. DelaPaz, Antipolo City e. ImprovementofCoveredCourtFlooringatBrgy. Hall, Brgy. Dalig, AntipoloCity | a.₱ 358,720.67 b.₱ 331,005.66 c.₱ 135,168.78 d.₱ 214,828.44 e.₱ 359,860.95 ------------------ ₱ 1,399,584.50 | Brgy. Dela Paz and Brgy. Dalig, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | a.₱ 355,177.01 b.₱ 329,324.88 c.₱ 133,756.74 d.₱ 212,913.48 e.₱ 356,722.67 ------------------ ₱ 1,387,894.78 | Jan. 31, 2022 | 210 | ||||||||||||||||
44 | 34 | ANTIPOLO-31JANUARY2022-05 | Construction and Improvement of Stone Masonry Riverwall at Brgy. San Isidro and Brgy. San Roque, Antipolo City (2022 – Package 20) a. Construction of Stone Masonry Riverwall along theCreekBesideForestRidgeSubdivision,Sitio Sarimanok, Barangay San Isidro, AntipoloCity b. Improvement of Stone Masonry Riverwall along Dimanlig Creek From Sumulong Bridge to M. Santos Bridge, Barangay San Roque, Antipolo City | a.₱ 2,095,671.17 b.₱ 2,041,365.30 ------------------ ₱ 4,137,036.47 | Brgy. San Isidro and Brgy. San Roque, Antipolo City | ANROL CONSTRUCTION | Clarence C. Cacho Samapaloc, Manila | a.₱ 2,090,251.04 b.₱ 2,031,885.60 ------------------ ₱ 4,122,136.64 | Jan. 31, 2022 | 210 | ||||||||||||||||
45 | 35 | ANTIPOLO-31JANUARY2022-06 | Improvement of Existing Stone Masonry Riverwall along Cacalog Creek at Sitio Imelda Intersecting Monang Creek, Brgy. Dela Paz, Antipolo City | ₱3,300,000.00 | Brgy. Dela Paz, Antipolo City | L.L. MARRON CONSTRUCTION & TRADING | Laura L. Marron Binangonan, Rizal | 3,286,000.88 | Jan. 31, 2022 | 210 | ||||||||||||||||
46 | 36 | ANTIPOLO-31JANUARY2022-07 | Improvement of Stone Masonry Riverwall along the Creek near Caprice Street at Village East Executive Village, Brgy. Muntindilaw, Antipolo City (2022 – Package 21) a. Improvement of Stone Masonry Riverwall along the Creek near Caprice Street, Site -1 at Village East Executive Village, Brgy.Muntindilaw, Antipolo City b. Improvement of Stone Masonry Riverwall along the Creek near Caprice Street, Site -2 at Village East Executive Village, Brgy.Muntindilaw, Antipolo City c. Improvement of Stone Masonry Riverwall along the Creek near Caprice Street, Site -3 at Village East Executive Village, Brgy.Muntindilaw, Antipolo City d. Improvement of Stone Masonry Riverwall along the Creek near Caprice Street, Site -4 at Village East Executive Village, Brgy. Muntindilaw, Antipolo City | a.₱ 1,167,479.27 b.₱ 2,066,069.32 c.₱ 1,092,058.68 d.₱ 671,373.24 -------------------- ₱ 4,996,980.51 | Brgy. Muntindilaw, Antipolo City | ANROL CONSTRUCTION | Clarence C. Cacho Samapaloc, Manila | a.₱ 1,163,506.45 b.₱ 2,059,038.67 c.₱ 1,088,343.67 d.₱ 669,090.89 -------------------- ₱ 4,979,979.68 | Jan. 31, 2022 | 210 | ||||||||||||||||
47 | 37 | ANTIPOLO-31JANUARY2022-08 | Construction of Stone Masonry Riverwall at Second Street, Monte Oro, Sitio Oreta, Barangay San Isidro, Antipolo City | ₱3,180,524.05 | Brgy. San Isidro, Antipolo City | L.L. MARRON CONSTRUCTION & TRADING | Laura L. Marron Binangonan, Rizal | 3,166,523.88 | Jan. 31, 2022 | 210 | ||||||||||||||||
48 | 38 | ANTIPOLO-31JANUARY2022-09 | Construction of Riprap at Sapa Puting Kahoy of Peñafrancia Subdivision, Brgy. Cupang, Antipolo City | ₱ 3,176,559.43 | Brgy. Cupang, Antipolo City | ANROL CONSTRUCTION | Clarence C. Cacho Samapaloc, Manila | 3,163,560.88 | Jan. 31, 2022 | 210 | ||||||||||||||||
49 | 39 | ANTIPOLO-31JANUARY2022-10 | Rehabilitation of Stone Masonry Riverwall and Construction of Drainage Canal at Brgy. Cupang and Brgy. Bagong Nayon, Antipolo City (2022 – Package 22) a. RehabilitationofStoneMasonryRiverwallalong the Creek at Palis Compound, Sierra Vista Subdivision, Barangay Cupang, AntipoloCity b. Construction of Drainage Canal at Road 14 Corner Road 16 Phase 3, Cogeo Village, Brgy. Bagong Nayon, AntipoloCity | a.₱ 499,983.06 b.₱ 492,415.03 ------------------ ₱ 992,398.09 | Brgy. Cupang and Brgy. Bagong Nayon, Antipolo City | JEMACON BUILDERS | Ricardo V. Sardea Antipolo, Rizal | a.₱ 494,195.08 b.₱ 486,379.67 ------------------ ₱ 980,574.75 | Jan. 31, 2022 | 180 | ||||||||||||||||
50 | 40 | ANTIPOLO-31JANUARY2022-11 | Construction of Roads with Drainage System for Road Lot-5 at Sitio Kaban, Brgy. San Jose, Antipolo City | ₱ 982,233.17 | Brgy. San Jose, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 972,200.00 | Jan. 31, 2022 | 180 | ||||||||||||||||
51 | 41 | ANTIPOLO-31JANUARY2022-12 | Construction of Roads at Brgy. San Jose, Antipolo City (2022 – Package23) a. Construction of Roads with Drainage Systemfor Road Lot – 4 (Portion) at Sitio Kaban, Brgy.San Jose, AntipoloCity b. Construction of Road at Idaho Street corner Nashville Street, Joyous Heights Subdivision, Sitio Hinapao, Brgy. San Jose, AntipoloCity | a.₱ 903,505.56 b.₱ 600,000.00 ------------------ ₱ 1,503,505.56 | Brgy. San Jose, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | a.₱ 896,505.56 b.₱ 595,094.94 ------------------ ₱ 1,491,600.50 | Jan. 31, 2022 | 210 | ||||||||||||||||
52 | 42 | ANTIPOLO-31JANUARY2022-13 | Road Improvement at Grand Tipolo Subdivision, Brgy. San Roque, Antipolo City (2022 – Package24) a. Road Improvement at Road Lot 4, Grand Tipolo Subdivision, Brgy. San Roque, AntipoloCity b. Road Improvement at Road Lot 3 and 6, Grand Tipolo Subdivision, Brgy. San Roque, Antipolo City | a.₱ 1,216,214.55 b.₱ 3,000,000.00 -------------------- ₱ 4,216,214.55 | Brgy. San Roque, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | a.₱ 1,210,959.43 b.₱ 2,990,240.57 -------------------- ₱ 4,201,200.00 | Jan. 31, 2022 | 210 | ||||||||||||||||
53 | 43 | ANTIPOLO-31JANUARY2022-14 | Concreting of Road Lot 26 at PCUP-RPG Ville (Ondoy Village), Brgy. San Jose, Antipolo City | ₱ 2,371,606.90 | Brgy. San Jose, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 2,358,643.00 | Jan. 31, 2022 | 210 | ||||||||||||||||
54 | 44 | ANTIPOLO-31JANUARY2022-15 | Construction of Roads with Drainage System for Road Lot - 3 at Sitio Kaban, Brgy. San Jose, Antipolo City | ₱ 869,954.46 | Brgy. San Jose, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | 859,920.00 | Jan. 31, 2022 | 180 | ||||||||||||||||
55 | 45 | ANTIPOLO-31JANUARY2022-16 | Construction of Bleacher at ACG Multi-Purpose Covered Court, Sitio Tanza II, Phase I, Brgy. San Jose, Antipolo City | ₱ 889,780.70 | Brgy. San Jose, Antipolo City | RSS CONSTRUCTION & SUPPLIES | Noemi Dolor Soriano Teresa, Rizal | 879,470.06 | Jan. 31, 2022 | 180 | ||||||||||||||||
56 | 46 | ANTIPOLO-31JANUARY2022-17 | Improvement of Drainage System (Portion) at C. Lawis Ext., Brgy. San Isidro, Antipolo City (Phase 2) | ₱ 1,425,602.55 | Brgy. San Isidro, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 1,413,500.00 | Jan. 31, 2022 | 210 | ||||||||||||||||
57 | 47 | ANTIPOLO-31JANUARY2022-18 | Improvement of Covered Court Flooring at Brgy. Mayamot, Antipolo City (2022 – Package25) a. Improvement of Covered Court Flooring at Dama De Noche St., Phase III, Town & Country Subdivision, Brgy. Mayamot, AntipoloCity b. Improvement of Covered Court Flooring at Maries Village Phase 2, Brgy. Mayamot, Antipolo City | a.₱ 397,997.74 b.₱ 331,005.66 ----------------- ₱ 729,003.40 | Brgy. Mayamot, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | a.₱ 392,537.00 b.₱ 326,466.88 ----------------- ₱ 719,003.88 | Jan. 31, 2022 | 180 | ||||||||||||||||
58 | 48 | ANTIPOLO-31JANUARY2022-19 | Repair/Repainting of Comfort Room and School Buildings at Various Schools, Brgy. San Jose, Antipolo City (2022 – Package 26) a. Repair/Repainting of Two(2)-Units Comfort Room at Tanza Elementary School, Brgy. San Jose, AntipoloCity b. Repair/Repainting Two(2) Storey Four(4) Classrooms of AUSAID Building at Jesus S. Cabarrus Elementary School, Brgy. SanJose, Antipolo City c. Repair/Repainting of Two(2) Storey, Four(4) Classrooms DPWH School Building at Pantay Elementary School, Brgy. San Jose, Antipolo City | a.₱ 608,941.67 b.₱ 581,846.75 c.₱ 946,521.68 ----------------- ₱ 2,137,310.10 | Brgy. San Jose, Antipolo City | RSS CONSTRUCTION & SUPPLIES | Noemi Dolor Soriano Teresa, Rizal | a.₱ 605,493.37 b.₱ 578,551.88 c.₱ 941,161.74 ----------------- ₱ 2,125,206.99 | Jan. 31, 2022 | 180 | ||||||||||||||||
59 | 49 | ANTIPOLO-31JANUARY2022-20 | Improvement of Road Pavement and Drainage Canal at ES Villa along Carigma Ext., Brgy. San Jose, Antipolo City | ₱ 3,150,000.00 | Brgy. San Jose, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 3,140,000.00 | Jan. 31, 2022 | 180 | ||||||||||||||||
60 | 50 | ANTIPOLO-31JANUARY2022-21 | Installation of Streetlights at Brgy. Cupang, Antipolo City (2022 – Package27) a. Installation of Streetlights at VillaCorazon, Brgy. Cupang, Antipolo City b. Installation of Streetlights at Panorama Hills Subd., Brgy. Cupang, AntipoloCity | a.₱ 1,509,239.01 b.₱ 3,297,736.26 ------------------- ₱ 4,806,975.27 | Brgy. Cupang, Antipolo City | FLAG CONSTRUCTION CORPORATION | Fernando L. Aranda Binangonan, Rizal | a.₱ 1,507,239.01 b.₱ 3,284,736.26 ------------------- ₱ 4,791,975.27 | Jan. 31, 2022 | 180 | ||||||||||||||||
61 | 51 | ANTIPOLO-31JANUARY2022-22 | Installation of Streetlights at Gloria Heights, Brgy. Dalig, Antipolo City | ₱ 4,601,345.34 | Brgy. Dalig, Antipolo City | L.L. MARRON CONSTRUCTION & TRADING | Laura L. Marron Binangonan, Rizal | 4,586,781.07 | Jan. 31, 2022 | 180 | ||||||||||||||||
62 | 52 | ANTIPOLO-31JANUARY2022-23 | Installation of Streetlights at Brgy. Dalig and San Isidro, Antipolo City (2022 – Package28) a. Installation of Streetlights at Milagros Estate Subdivision, Brgy. Dalig, Antipolo City b. Installation of Streetlights at Brittany 2 Executive Homes, Brgy. San Isidro, Antipolo City | a.₱ 4,121,484.39 b.₱ 634,215.31 ------------------- ₱ 4,755,699.70 | Brgy. Dalig and San Isidro, Antipolo City | L.L. MARRON CONSTRUCTION & TRADING | Laura L. Marron Binangonan, Rizal | a.₱ 4,108,484.88 b.₱ 632,215.00 ------------------- ₱ 4,740,699.88 | Jan. 31, 2022 | 210 | ||||||||||||||||
63 | 53 | ANTIPOLO-31JANUARY2022-24 | Installation of Streetlights at Brgy. Mambugan, Antipolo City (2022 – Package29) a. Installation of Streetlights at Antipolo Valley Subd., Brgy. Mambugan, AntipoloCity b. Installation of Streetlights at FEU Village, Brgy. Mambugan, AntipoloCity | a. ₱3,297,702.54 b. ₱1,639,207.79 --------------------- ₱ 4,936,910.33 | Brgy. Mambugan, Antipolo City | FLAG CONSTRUCTION CORPORATION | Fernando L. Aranda Binangonan, Rizal | a. ₱ 3,287,683.00 b. ₱1,634,227.88 --------------------- ₱ 4,921,910.88 | Jan. 31, 2022 | 210 | ||||||||||||||||
64 | 54 | ANTIPOLO-31JANUARY2022-25 | Installation of Streetlights at La Unica Hija Subd., Brgy. Cupang and Brgy. Mayamot, Antipolo City (2022 – Package 30) a. Installation of Streetlights at La Unica Hija Subd., Brgy. Cupang, AntipoloCity b. Installation of Streetlights at La Unica Hija Subd., Brgy. Mayamot, AntipoloCity | a.₱ 2,435,284.53 b.₱ 2,205,416.32 ------------------- ₱ 4,640,700.85 | Brgy. Cupang and Brgy. Mayamot, Antipolo City | FLAG CONSTRUCTION CORPORATION | Fernando L. Aranda Binangonan, Rizal | a.₱ 2,427,412.25 b.₱ 2,198,387.75 ------------------- ₱ 4,625,800.00 | Jan. 31, 2022 | 210 | ||||||||||||||||
65 | 55 | ANTIPOLO-31JANUARY2022-26 | Installation of Streetlights at Brgy. San Isidro, Antipolo City (2022 – Package 31) a. Installation of Streetlights at Sitio Oreta,Brgy. San Isidro, Antipolo City b. Installation of Streetlights at Monteoro,Brgy. San Isidro, Antipolo City c. Installation of Streetlights at SantanaVillage, Brgy. San Isidro, Antipolo City d. Installation of Streetlights at Rodville Subd., Brgy. San Isidro, AntipoloCity | a.₱ 936,393.11 b.₱ 2,117,388.96 c.₱ 1,223,671.11 d.₱ 323,408.69 ------------------- ₱ 4,600,861.87 | Brgy. San Isidro, Antipolo City | FLAG CONSTRUCTION CORPORATION | Fernando L. Aranda Binangonan, Rizal | a.₱ 933,340.00 b.₱ 2,110,486.00 c.₱ 1,219,682.00 d.₱ 322,353.88 ------------------- ₱ 4,585,861.88 | Jan. 31, 2022 | 210 | ||||||||||||||||
66 | 56 | ANTIPOLO-31JANUARY2022-27 | Installation of Streetlights at Brgy. Dalig and San Roque, Antipolo City (2022 – Package32) a. InstallationofStreetlightsatGoodShepherdville HOA, Sitio Dalig 3, Brgy. Dalig, AntipoloCity b. Installation of Streetlights at Nayong Silangan Subd., Brgy. Dalig, AntipoloCity c. Installation of Streetlights at Marville Park Subd., Brgy. San Roque, AntipoloCity | a.₱ 2,276,532.49 b.₱ 894,422.66 c.₱ 1,667,558.32 ------------------- ₱ 4,838,513.47 | Brgy. Dalig and San Roque, Antipolo City | ANROL CONSTRUCTION | Clarence C. Cacho Samapaloc, Manila | a.₱ 2,269,000.95 b.₱ 891,749.05 c.₱ 1,662,863.00 ------------------- ₱ 4,823,613.00 | Jan. 31, 2022 | 210 | ||||||||||||||||
67 | 57 | ANTIPOLO-31JANUARY2022-28 | Installation of Streetlights at Brgy. Mayamot, Antipolo City (2022 – Package 33) a. Installation of Streetlights at Broadway Pines Executive Village, Brgy. Mayamot, Antipolo City b. Installation of Streetlights at SamsonvilleSubd., Brgy. Mayamot, Antipolo City c. Installation of Streetlights at Rose St., Brgy. Mayamot, AntipoloCity | a.₱ 2,511,904.92 b.₱ 1,638,329.04 c.₱ 491,196.88 ------------------- ₱ 4,641,430.84 | Brgy. Mayamot, Antipolo City | FLAG CONSTRUCTION CORPORATION | Fernando L. Aranda Binangonan, Rizal | a.₱ 2,508,243.40 b.₱ 1,629,006.64 c.₱ 489,340.19 ------------------- ₱ 4,626,590.23 | Jan. 31, 2022 | 210 | ||||||||||||||||
68 | 58 | ANTIPOLO-31JANUARY2022-29 | Installation of Streetlights at Brgy. San Isidro, Brgy. San Juan and Brgy. San Jose, Antipolo City (2022 – Package34) a. Installation of Streetlights at VariousSitios, Brgy. San Isidro, Antipolo City b. Installation of Streetlights at San Juan National Highschool, Brgy. San Juan, AntipoloCity c. Installation of Streetlights at Sumilang Elementary School, Brgy. San Jose, Antipolo City d. Installation of Streetlights at San Ysiro Elementary School, Brgy. San Jose, Antipolo City | a.₱ 2,947,359.12 b.₱ 489,675.17 c.₱ 490,874.74 d.₱ 481,534.40 ------------------ ₱ 4,409,443.43 | Brgy. San Juan and Brgy. San Jose, Antipolo City | L.L. MARRON CONSTRUCTION & TRADING | Laura L. Marron Binangonan, Rizal | a.₱ 2,935,359.12 b.₱ 488,675.17 c.₱ 489,874.74 d.₱ 480,534.40 ------------------ ₱ 4,394,443.43 | Jan. 31, 2022 | 210 | ||||||||||||||||
69 | 59 | ANTIPOLO-02FEBRUARY2022-01 | Rehabilitation of Drainage System along Lake St., Summerville Subd., SitioTocs, Brgy. Mayamot, Antipolo City | ₱4,131,537.03 | Brgy. Mayamot, Antipolo City | CSGER CONSTRUCTION CORPORATION | Carlos S. Geronimo Rodriguez, Rizal | 4,116,427.73 | Feb. 2, 2022 | 210 | ||||||||||||||||
70 | 60 | ANTIPOLO-02FEBRUARY2022-02 | Construction of Drainage System along T. Oldan St. Brgy. Dela Paz, Antipolo City | ₱4,592,505.48 | Brgy. Dela Paz, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 4,577,166.92 | Feb. 2, 2022 | 210 | ||||||||||||||||
71 | 61 | ANTIPOLO-02FEBRUARY2022-03 | Construction of Drainage Canal of (Portion) Road Lot 1 at Palmera V, Brgy. Dela Paz, Antipolo City | ₱3,048,755.24 | Brgy. Dela Paz, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | 3,034,755.88 | Feb. 2, 2022 | 210 | ||||||||||||||||
72 | 62 | ANTIPOLO-02FEBRUARY2022-04 | Construction of Drainage Canal of Road Lot 6 at Palmera V, Brgy. Dela Paz, Antipolo City | ₱2,432,304.90 | Brgy. Dela Paz, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | 2,419,304.88 | Feb. 2, 2022 | 210 | ||||||||||||||||
73 | 63 | ANTIPOLO-02FEBRUARY2022-05 | Repair/Repainting of Three (3) Storey, Six (6) Rooms Principal LED Building at Mambugan National High School, Brgy. Mambugan , Antipolo City | ₱1,078,494.87 | Brgy. Mambugan , Antipolo City | FLS CONSTRUCTION & BUILDERS | Felimon Santos Taytay, Rizal | 1,066,494.88 | Feb. 2, 2022 | 210 | ||||||||||||||||
74 | 64 | ANTIPOLO-02FEBRUARY2022-06 | Construction of Drainage Canal at Amethyst Street, Teremil Subdivision, Brgy. Mambugan, Antipolo City | ₱3,415,489.64 | Brgy. Mambugan, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 3,401,500.00 | Feb. 2, 2022 | 210 | ||||||||||||||||
75 | 65 | ANTIPOLO-02FEBRUARY2022-07 | Construction of Drainage Canal at Ruby Street, Teremil Subdivision, Brgy. Mambugan, Antipolo City | ₱3,270,336.56 | Brgy. Mambugan, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 3,256,300.00 | Feb. 2, 2022 | 210 | ||||||||||||||||
76 | 66 | ANTIPOLO-02FEBRUARY2022-08 | Construction of Drainage Canal at Emerald Street, Teremil Subdivision, Brgy. Mambugan, Antipolo City | ₱4,163,537.57 | Brgy. Mambugan, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 4,148,500.00 | Feb. 2, 2022 | 210 | ||||||||||||||||
77 | 67 | ANTIPOLO-02FEBRUARY2022-09 | Construction of Drainage Canal Phase 2 at (Portion) Don Pablo St., Villa Cecilia Subd., Brgy. Mambugan, Antipolo City | ₱2,687,932.49 | Brgy. Mambugan, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | 2,673,900.00 | Feb. 2, 2022 | 210 | ||||||||||||||||
78 | 68 | ANTIPOLO-02FEBRUARY2022-10 | Construction of Drainage Canal Phase 2 at (Portion) Don Lucas St., Villa Cecilia Subd., Brgy. Mambugan, Antipolo City | ₱2,498,404.76 | Brgy. Mambugan, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | 2,485,400.00 | Feb. 2, 2022 | 210 | ||||||||||||||||
79 | 69 | ANTIPOLO-02FEBRUARY2022-11 | Construction of Drainage Canal at (Portion) Don Juan St., Villa Cecilia Subd., Brgy. Mambugan, Antipolo City | ₱2,381,773.70 | Brgy. Mambugan, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | 2,368,773.88 | Feb. 2, 2022 | 210 | ||||||||||||||||
80 | 70 | ANTIPOLO-02FEBRUARY2022-12 | Rehabilitation/ Improvement of Road at (Portion) Don Juan St., Villa Cecilia Subd., Brgy. Mambugan, Antipolo City | ₱2,963,472.09 | Brgy. Mambugan, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | 2,950,472.88 | Feb. 2, 2022 | 210 | ||||||||||||||||
81 | 71 | ANTIPOLO-02FEBRUARY2022-13 | Improvement of Drainage System at Zinnia St., Antipolo Valley Subdivision, Brgy. Mambugan, Antipolo City | ₱3,984,000.00 | Brgy. Mambugan, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 3,970,006.51 | Feb. 2, 2022 | 210 | ||||||||||||||||
82 | 72 | ANTIPOLO-02FEBRUARY2022-14 | Improvement of School Clinic, Improvement of Covered Court Flooring and Construction ofWash Facilities Structure at Brgy. San Roque and Brgy. Dalig, Antipolo City (2022 – Package 35) a. Improvement of School Clinic at San Roque National High School, Brgy. San Roque, Antipolo City b. Improvement of Covered Court Flooring at San Agustin Village, Brgy. San Roque, Antipolo City c. Construction of Additional One (1) Unit Wash Facilities Structure at San Antonio Village Elem. School, San Antonio Village, Brgy. Dalig, Antipolo City | a. ₱ 611,755.37 b. ₱ 359,860.95 c. ₱ 168,906.77 ------------------- ₱ 1,140,523.09 | Brgy. San Roque and Brgy. Dalig, Antipolo City | JG NORA BUILDERS | James G. Nora Morong, Rizal | a. ₱ 604,782.00 b. ₱ 355,759.00 c. ₱ 166,900.00 ------------------- ₱ 1,127,441.00 | Feb. 2, 2022 | 210 | ||||||||||||||||
83 | 73 | ANTIPOLO-02FEBRUARY2022-15 | Rehabilitation/Improvement of Drainage Canal at M. Gatlabayan St. Brgy. San Roque, Antipolo City | ₱3,047,716.09 | Brgy. San Roque, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | 3,033,375.06 | Feb. 2, 2022 | 210 | ||||||||||||||||
84 | 74 | ANTIPOLO-02FEBRUARY2022-16 | Improvement/Concreting of Zinnia St., Antipolo Valley Subdivision, Brgy. Mambugan, Antipolo City | ₱2,000,000.00 | Brgy. Mambugan, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 1,986,977.74 | Feb. 2, 2022 | 210 | ||||||||||||||||
85 | 75 | ANTIPOLO-02FEBRUARY2022-17 | Improvement of Four (4) Storey Eight (8) Classroom Dpwh Building A at Antipolo National High School Brgy. Sta. Cruz, Antipolo City | ₱1,500,000.00 | Brgy. Sta. Cruz, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 1,488,000.00 | Feb. 2, 2022 | 210 | ||||||||||||||||
86 | 76 | ANTIPOLO-02FEBRUARY2022-18 | Improvement of Road (Portion) With Pin 177-01-016- 022-083 at La Montana Estates, Sumulong Highway, Brgy. Santa Cruz, Antipolo City | ₱2,972,093.13 | Brgy. Santa Cruz, Antipolo City | OLIVER AQUINO CONSTRUCTION | Lauro M. Ubiadas Binangonan, Rizal | 2,958,000.00 | Feb. 2, 2022 | 210 | ||||||||||||||||
87 | 77 | ANTIPOLO-02FEBRUARY2022-19 | Improvement/Rehabilitation of Road at J. Coronado St., Brgy. San Roque, Antipolo City | ₱1,219,859.68 | Brgy. San Roque, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | 1,206,800.00 | Feb. 2, 2022 | 210 | ||||||||||||||||
88 | 78 | ANTIPOLO-02FEBRUARY2022-20 | Improvement of Road (Portion) With Pin 177-01-016- 016-151 (Mckinley) At La Montana Estates, Sumulong Highway, Brgy. Santa Cruz, Antipolo City | ₱2,200,000.00 | Brgy. Santa Cruz, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | 2,185,977.45 | Feb. 2, 2022 | 210 | ||||||||||||||||
89 | 79 | ANTIPOLO-02FEBRUARY2022-21 | Improvement of Road with Pin 177-01-016-015-045 at La Montana Estates, Sumulong Highway, Brgy. Santa Cruz, Antipolo City | ₱1,154,549.66 | Brgy. Santa Cruz, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | 1,141,739.48 | Feb. 2, 2022 | 210 | ||||||||||||||||
90 | 80 | ANTIPOLO-02FEBRUARY2022-22 | Improvement of Road with Pin 177-01-016-015-281 at La Montana Estates, Sumulong Highway, Brgy. Santa Cruz, Antipolo City | ₱1,581,431.50 | Brgy. Santa Cruz, Antipolo City | OLIVER AQUINO CONSTRUCTION | Lauro A. Aquino Binangonan, Rizal | 1,569,431.46 | Feb. 2, 2022 | 210 | ||||||||||||||||
91 | 81 | ANTIPOLO-02FEBRUARY2022-23 | Improvement of Road with Pin 177-01-016-015-264 (Andes St. - Portion) at La Montana Estates,Sumulong Highway, Brgy. Santa Cruz, Antipolo City | ₱2,001,046.88 | Brgy. Santa Cruz, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | 1,988,100.15 | Feb. 2, 2022 | 210 | ||||||||||||||||
92 | 82 | ANTIPOLO-02FEBRUARY2022-24 | Improvement of Road with Pin 177-01-016-015-326 (Andes St. - Portion) at La Montana Estates,Sumulong Highway, Brgy. Santa Cruz, Antipolo City | ₱3,365,513.22 | Brgy. Santa Cruz, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | 3,351,500.00 | Feb. 2, 2022 | 210 | ||||||||||||||||
93 | 83 | ANTIPOLO-02FEBRUARY2022-25 | Improvement of Health Station/ Covered Court and Repair/Repainting of School Building at Brgy. Dalig and Brgy. San Roque, Antipolo City (2022 – Package 36) a. Improvement of Two (2) Storey Barangay Health Station at Sta. Elena St., Milagros Subd., BarangayDalig, Antipolo City b. Improvement of Covered Court Flooring at Lores Elementary School, Brgy. San Roque, Antipolo City c. Improvement of Covered Court Flooring at Knights of Columbus Elementary School, Brgy. San Roque, Antipolo City d. Repair/ Repainting of 2 Storey 6 Classroom DepedBuilding At Knights of Columbus Elementary School, Brgy.San Roque, Antipolo City | a. ₱ 392,056.04 b. ₱ 242,099.70 c. ₱ 331,005.66 d. ₱ 669,610.63 ------------------ ₱ 1,634,772.03 | Brgy. Dalig and Brgy. San Roque, Antipolo City | STEELBEND CONSTRUCTION INC. | Jessa Francisco Payte San Juan City, Metro Manila | a. ₱ 388,698.00 b. ₱ 240,026.00 c. ₱ 328,170.00 d. ₱ 663,876.88 ------------------ ₱ 1,620,770.88 | Feb. 2, 2022 | 210 | ||||||||||||||||
94 | 84 | ANTIPOLO-02FEBRUARY2022-26 | Various Construction of Roads with Drainage Canal at Brgy. San Roque, Antipolo City (2022 – Package 37) a. Construction of Road with Drainage Canal of Road Lot 3 at Nazarene Ville Phase 3, Brgy. San Roque,Antipolo City b. Construction of Road with Drainage Canal of Road Lot 4 at Nazarene Ville Phase 3, Brgy. San Roque, Antipolo City | a. ₱ 960,103.68 b. ₱ 860,988.50 ------------------ ₱ 1,821,092.18 | Brgy. San Roque, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | a. ₱ 953,476.48 b. ₱ 854,282.51 ------------------ ₱ 1,807,758.99 | Feb. 2, 2022 | 210 | ||||||||||||||||
95 | 85 | ANTIPOLO-07FEBRUARY2022-01 | Concreting of Road Lot 27 at PCUP-RPG Ville (Ondoy Village), Brgy. San Jose, Antipolo City | ₱2,718,226.41 | Brgy. San Jose, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 2,705,000.00 | Feb. 7, 2022 | 210 | ||||||||||||||||
96 | 86 | ANTIPOLO-07FEBRUARY2022-02 | Construction of Roads with Drainage System for Road Lot – 2(Portion) at SitioKaban, Brgy. San Jose, Antipolo City | ₱2,410,806.49 | Brgy. San Jose, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | 2,397,800.00 | Feb. 7, 2022 | 210 | ||||||||||||||||
97 | 87 | ANTIPOLO-07FEBRUARY2022-03 | Improvement/ Construction/ Repair of Various Structures at Brgy. Dela Paz and Brgy. San Jose, Antipolo City (2022 – Package 38) a. Improvement/Construction of Roads with Drainage System at Alley 7 & Alley 1 at PurokSilangan, Brgy. Dela Paz, Antipolo City b. Construction/Repair of Damaged Riprap at Maximo L. Gatlabayan National High School at SitioPaenaan, Brgy. San Jose, Antipolo City | a. ₱ 1,299,951.85 b. ₱ 114,156.90 ------------------ ₱ 1,414,108.75 | Brgy. Dela Paz and Brgy. San Jose, AntipoloCity | 1C4M BUILDERS INC. | Meynard C. Ko Antipolo City | a. ₱ 1,288,920.88 b. ₱ 113,189.00 ------------------ ₱ 1,402,109.88 | Feb. 7, 2022 | 210 | ||||||||||||||||
98 | 88 | ANTIPOLO-07FEBRUARY2022-04 | Construction of Ynares Type Multi-Purpose Covered Court at SitioRuhat-III Upper, Barangay Mambugan, Antipolo City | ₱3,000,000.00 | Barangay Mambugan, Antipolo City | HALREY CONSTRUCTION INC. | Ma. Josefa A. Halili Sta. Maria, Bulacan | 2,985,624.95 | Feb. 7, 2022 | 210 | ||||||||||||||||
99 | 89 | ANTIPOLO-07FEBRUARY2022-05 | Concreting of Road Lot 25 at PCUP-RPG Ville (Ondoy Village), Brgy. San Jose, Antipolo City | ₱1,888,755.54 | Brgy. San Jose, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | 1,875,000.00 | Feb. 7, 2022 | 210 | ||||||||||||||||