SCOPE OF WORK RESPONSIBILITY MATRIX BETWEEN CYCLECT (CE) & SUBCONTRACTOR (XXX XXXXX Pte Ltd)
3
Updated: 14/08/2024
4
Responsibility
5
S/NItemCyclectSubconRemarks
6
A1Shop Drawing & Material Submission
7
1Preparation of Shop Drawing
8
2Shop Drawing Coordination with trade contractors
9
3Update Shop Drawing for As-Built DrawingCE shall update the redline changes made by the subcontractor
10
4Update Model and submission of As-Built Drawing
11
5Material Submission to consultant for approvalBrand shall be defined by CE. Subcontractor shall follow the approved material which are under the subcontractor scope of work
12
13
A2Safety, Documentation & Transportation
14
1Project ScheduleCE shall issue Project Schedule. Subcontractor is obliged to complete the installation works within the stipulated timeline
15
2Working HoursMaximum 72hours per week for installation works. Subcontractor shall make all necessary provisions to ensure that the installation works are completed within the stipulated time schedule
16
3Daily PTW application for installation works
17
4Method Statement, Risk Assessment and SWP for individual installation works
18
5Supply complete set of Full PPESubcontractor shall make all necessary provisions for PPE to ensure comply to HSE operation instruction
19
6LEW inspection and sticker for tools and equipmentMonthly Inspection
20
7Provision of MEWP, Scaffolding and Mobilization and demobilizationLicense operator by Subcontractor
21
8Provision of safety barriers, safety cone, nets, etc for the installation worksComply to Main contractor HSE Operation instruction
22
9Safety Induction Course and all other safety course to apply for contractor passCE will arrange to register for all relevant courses for contractor pass application to enter site.
23
10Transportation of workers/staff to working placeNo open or semi open Vehicles are allowed to enter site. Transport provided by CE from Main Site Entrance (1st Security Guardhouse before the bridge) to IWMF Site.
24
11Construction Light at the surrounding building
25
12Task Lighting for the specific working place
26
13Construction Power for the execution of the Subcontract WorksMain Contractor shall provide Tempoary DB. Subcon shall be tapped the power supply from tempoarary DB for installation works. The area where temporary DB is not available, Subcon shall supply generator power supply.
27
14Fuels, oils and lubricants for the Subcontractor's equipment
28
15Repair and maintenance of the Subcontractor's equipment`
29
16Loading, unloading of MaterialsSubcon to assist in loading and unloading of materials.
30
17Making all necessary preparation for the QA/QC inspection of the completed installation worksSubcon to arrange the inspection area in clean, ventilated and sufficient lighting and power provision.
31
18QA/QC Inspection of the completed installation worksLead by CE. Assist by Subcontractor
32
19Submission of daily manpower and work reportSubmission to CE supervisor or engineer daily
33
20Protection of equipment of owner's properties at the installation areaSubcon to provide additional protection if necessary at the installation area
34
35
A3Site Mobilisation & Installation Works
36
1Full Time Site Engineer, Supervisor, Foreman, EHS Supervisor and all other necessary manpower to complete the work and attend all require meeting
37
2Mock Up Installation work Lead by CE. Assist by Subcon for installation works
38
3Defects Rectification
39
4Project LEW for Testing and Commissioning
40
5Provision of Testing Equipment including torque wrenchBrand shall be defined by CE. Subcon shall provide Calibration Cert and valid LEW inspection sticker
41
6Provision of Tools for installation works
42
7Provision of Storage SpaceStorage space shall be maintained by Subcon
43
8Daily Cleaning and removing rubbish and other debris arising from the execution of subcontract works Housekeeping by Subcon. Provision of Rubbish Bin by CE.
44
9Sealing of Wall and Floor Opening with approved fire stop material
45
10Sealing of conduit peneration with apporved fire stop materialBrand shall be defined by CE.
46
11Supply of all Lights Fittings
47
12Installation of all Light Fittings
48
13Supply of like Electrical accessories like Isolators, CEE-Form, Switches, Switch Socket Outlets, etc.Refer to Appendix A - Material Matrix
49
14Installation of all Electricatl accessories like Isolators, CEE-Form, Switches, Switch Socket Outlets, etc.Including direct power supply to field Equipment/Control Panel, etc supply by other.
50
15Supply Cable Containment (Cable Trunking, Cable Tray, Cable Ladder, cable basket)Refer to Appendix A - Material Matrix
51
16Installation cable containment (Cable Trunking, Cable Tray, Cable Ladder, cable basket)
52
17Supply, Install Conduit and accessoriesBrand shall be defined by CE. Refer to Appendix A - Material Matrix
53
18Supply LV Cable (25sqmm and above)
54
19Supply LV Cable (16sqmm and below)Brand shall be defined by CE.
55
20Installation of LV Cables
56
21Cable Pulling through underground pipe with cable sock, pulling rope, cable winch and all other neccessary tools and equipments to complete the works
57
22Bolt, Nuts, Washer, drop-in anchor, Hold-Down clamp (HDG) and all other accessories for installation worksBrand shall be defined by CE. Refer to Appendix A - Material Matrix
58
23Cable Lug, Cable gland, Shroud and End CapBrand shall be defined by CE. Refer to Appendix A - Material Matrix
59
24LV Cable Termination, Cable Tie, Cable Tag and all other accessoriesBrand shall be defined by CE. Refer to Appendix A - Material Matrix
60
25Supply MCT for underground pipes
61
26Installation of MCT modules at underground pipes
62
27Testing and Commissiong
63
- Earth fault loop impedance test
64
- Breaker Trip Test
65
- Protection Relay Trip Test
66
- RCCB Test
67
- Earth resistance test
68
- Contact resistance test
69
- RCD test on socket outlet
70
- lux level test for light fitting
71
A4Commercial
72
1Insurance
73
2Defect Liability Period24 months
74
3Retention (10%)
75
4Night works, Overtime and shiftwork for the completion of the works
76
5MYENA
77
78
79
Subcontractor :
_______________________________________
80
Company Stamp:
_______________________________________
81
Date:_________________
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100