ABCDEFGHIJKLMNOPQRSTUVWXYZAA
1
Route ride:
https://www.youtube.com/watch?v=EFbNcJH2sXY
2
3
Path NameFinch Hydro Corridor Bicycle Path (Norfinch-Beecroft)
4
LocationToronto, Ontario
5
6
Scoreout ofComments
7
CONVENIENCE1930
8
Speed810Few stops but long waits at several traffic signals
9
Effort25No priority at minor streets; Huge hill at Black Creek
10
Directness35Directness Factor:0.8Straight Line:9.2kmPath:11.8km
11
Impedance55Shared use segments have negligible pedestrian volume
12
Legality35Several unnecessary waits at signals; not the most direct route around G.Ross Lord Reservoir
13
Other-20No snow clearance
14
15
COMFORT3435
16
Motor Traffic2020Shared segments have negligible motor traffic
17
Noise, Width1010Peaceful environment; plenty of room to overtake
18
Surface45Perfectly smooth asphalt, bumps at intersections
19
20
SAFETY3135
21
Conflict1920One dangerous left-turn conflict at Sentinel Blvd
22
Clarity1010Uses standard highway traffic control
23
Crime25No lighting at night
24
25
out of
26
Overall Score:84100
Exceeds Expectations
27
28
Recommendations:
29
- Install upstream bicycle detection at traffic signals
30
- Complete route 44B around the south side of G. Ross Lord Reservoir
31
- Install bicycle-priority crossings at minor streets
32
- Build high-level bridge over Black Creek valley
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100