TimestampJob OriginatorJob NameJob CategoryJob DescriptionSkillsets RequiredEstimated number of hours to be awardedContact point to volunteer for jobPriority to CompleteAssigned ToStatus
2
1/25/2017 10:01:48Douglas BryantElectrical PanelClubhouseThe Board has been asked to review the condition of the Clubhouse Electrical Panel, and to estimate cost of replacement. This requires a licensed electrician.
The current panel is original to the construction in 1982. The Board would like to schedule a replacement and identify a licensed electrical contractor able to complete the job.
We would prefer to choose a qualified member of the Club if possible.
Electrical20dwbryan@sympatico.caMedium (next few months)Available
3
4/20/2017 15:25:01Douglas BryantPainting balcony railingClubhouseThe railing on the Club House balcony is chipped and rusting. It should be sanded with coarse sandpaper and painted with black Tremclad or rust resistant paint.
This is a job that may require primer. Paint, brushes and other equipment will be supplied.
Probably two people required since the railing has spindles as well as a rounded top rail.
Painting/ Decorating10dwbryan@sympatico.caHigh (next few weeks)Available
4
4/28/2017 22:46:23Douglas BryantRepair two round tablesSocialThere are two large round tables that need repair. They are similar to the ones in the upper activity room in the Club House.
This may require welding skills, replacement parts, or it may be that the tables can't be fixed. We need to decide what to do with them.
Carpentry5dwbryan@sympatico.caMedium (next few months)Available
5
6/12/2017 16:08:56Douglas BryantRestring the flag poleClubhouseThe flag pole on the pier at the south end is missing both some of its blocks and two of its halyards.
At the foot of the pole there is a through bolt which when removed will allow the pole to be lowered.
This will require a number of people to lower the pole in a controlled manner, and to control traffic while the work is in progress.
This work should be completed in a couple of hours after the bolt is managed.
There is a budget for a new bolt, missing blocks and halyards.
Carpentry, General labour3dwbryan@sympatico.caHigh (next few weeks)Available
6
7/6/2017 21:00:33Don BingleyWeed ControlFacilitiesWeeds growing inside dry sail compound require weed wacking or otherwise removed.General labour4Don BingleyHigh (next few weeks)Elaine KingIn Progress
7
7/6/2017 21:03:30Don BingleyTree trimmingFacilitiesThere is a 10 foot high tree growing outside the South West corner of the dry sail compound. It needs to be trimmed back to height of the fence as it limits the field of vision of school supervision.General labour4Don BingleyHigh (next few weeks)Available
8
7/6/2017 21:12:54Don BingleyCompound MaintenanceFacilitiesPick as much gravel as possible out of post holes and string dividing rope down center line of the compound.General labour3Don BingleyUrgent (immediately)Available
9
7/6/2017 21:54:39Don BingleyPicnic ShelterFacilitiesPicnic shelter in the dock box just inside the parking lot gate next to the ice machine. Install at the North West corner of the dry sail compound. This is a two person job.General labour4Don BingleyUrgent (immediately)Available
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
Loading...
 
 
 
Active Jobs
Completed Jobs