ABCDEFGHIJKLMNOPQRSTUVW
1
SITELAPTOPSDESKTOPSTABLETSCHROMEBOOKSSERVERSCORE SWITCHSEDGE SWITCHESACCESS POINTSPHONESPHONE SYSTEM
INFRASTRUCTURE [1 CAT 6a drop including fiber to IDF]
SECURITY CAMERASNETWORK VIDEO RECORDERS (NVRs)
TVS / PROJECTORS
COPIERSHDMI DROPSSOFTWARE COSTFIrewallContent Filter
2
Bear River45768542212368691138156250350See
"Current District Software"
tab
3
Ghidotti91016701926303000010
4
Nevad County Adult Ed428130001370800404
5
Nevada Union1301061014896247134135128022021327132
6
North Point Academy15160127003615030120616
7
Ranch0000012430830111
8
Silver Springs2633119617223016071119119
9
District Office25221001133216440424
10
TOTAL25426234253187932662944618466521616216$299,100.7111
11
12
Projected life span (years)See belowSee belowSee belowSee below7888121225108856187
13
Estimated cost per device $ 866.00 $ 1,148.73 $ 359.68 $ 387.15 $ 21,373.19 $ 41,446.00 $ 7,226.15 $ 529.71 $ 304.73 $ 10,967.00 $ 627.34 $ 5,000.00 $37,000.00$1,030.18$6,983.93$850.00N/A $ 58,807.63 $12,500.00
14
Can be funded with E-Rate no no no no yes yes yes yes no no yes no nonononono yes no
15
Post E-Rate cost to district N/A N/A N/A N/A $ 8,549.28 $ 16,578.40 $ 2,890.46 $ 211.88 N/A N/A $ 250.94 N/A N/AN/AN/AN/AN/A $ 23,523.05 N/A
16
17
ESTIMATED ANNUAL COSTTOTAL
% SPARE DEVICES PER YEAR
18
4 year plan $ 54,991.00 $ 75,241.82 $ 3,057.28 $ 244,969.16 $ 9,770.60 $ 14,506.10 $ 33,601.60 $ 7,045.14 $ 7,465.89 $ 3,655.67 $ 6,203.14 $ 233,000.00 $ 23,125.00 $ 27,814.86 $ 22,348.58 $ 30,600.00 $ 299,100.71 $ 2,940.38 $ 1,785.71 $ 1,101,222.63
19
4 year + 1% spares
$ 57,190.64 $ 78,251.49 $ 3,179.57 $ 254,767.93 $ 9,770.60 $ 14,506.10 $ 33,601.60 $ 7,045.14 $ 7,465.89 $ 3,655.67 $ 6,203.14 $ 233,000.00 $ 23,125.00 $ 27,814.86 $ 22,348.58 $ 30,600.00 $ 299,100.71 $ 2,940.38 $ 1,785.71 $ 1,116,353.00 1%
20
5 year plan $ 43,992.80 $ 60,193.45 $ 2,445.82 $ 195,975.33 $ 9,770.60 $ 14,506.10 $ 33,601.60 $ 7,045.14 $ 7,465.89 $ 3,655.67 $ 6,203.14 $ 233,000.00 $ 23,125.00 $ 27,814.86 $ 22,348.58 $ 30,600.00 $ 299,100.71 $ 2,940.38 $ 1,785.71 $ 1,025,570.78
21
5 year + 2% spares
$ 48,392.08 $ 66,212.80 $ 2,690.41 $ 215,572.86 $ 9,770.60 $ 14,506.10 $ 33,601.60 $ 7,045.14 $ 7,465.89 $ 3,655.67 $ 6,203.14 $ 233,000.00 $ 23,125.00 $ 27,814.86 $ 22,348.58 $ 30,600.00 $ 299,100.71 $ 2,940.38 $ 1,785.71 $ 1,055,831.52 2%
22
6 year plan $ 36,660.67 $ 50,161.21 $ 2,038.19 $ 163,312.78 $ 9,770.60 $ 14,506.10 $ 33,601.60 $ 7,045.14 $ 7,465.89 $ 3,655.67 $ 6,203.14 $ 233,000.00 $ 23,125.00 $ 27,814.86 $ 22,348.58 $ 30,600.00 $ 299,100.71 $ 2,940.38 $ 1,785.71 $ 975,136.21
23
6 year + 3% spares
$ 43,259.59 $ 59,190.23 $ 2,405.06 $ 192,709.07 $ 9,770.60 $ 14,506.10 $ 33,601.60 $ 7,045.14 $ 7,465.89 $ 3,655.67 $ 6,203.14 $ 233,000.00 $ 23,125.00 $ 27,814.86 $ 22,348.58 $ 30,600.00 $ 299,100.71 $ 2,940.38 $ 1,785.71 $ 1,020,527.32 3%
24
25
Note: Infrastructure price is an estimate for the cost of installing a single drop in a classroom, which includes a percentage of the fiber, IDF cabinet, labor, etc. needed to get internet from the MDF to that room. We are projecting four (4) drops per classroom/office excepting labs. Four was chosen assuming one drop will be used each for VoIP phone and IP intercom/bell/clock systems. Two drops will be required for each access point for future-ready throughput. Phones have data passthrough, which can be used for staff devices requiring a physical network connection.
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100