| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | AA | AB | AC | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | no | Paper ID | Authors | Title | Affiliations | Country | Full Paper | Update time | Keywords | Category | Reviewer-1 | Reviewer-2 | Reviewer-3 | Review Status | Plagiarism Check | Template Check/ Editor Comment | Decision | Decision Score | FP Notif Email sent | Revision | Revision Check | Camera Ready FP | PDF Xpress | Registration Paid | e-CF | |||||
2 | 1 | 013 | Imam Munandar, Kevin Marojahan Banjar Nahor, Pradita Octoviandiningrum Hadi | Reactive Power Absorption Scheme by Distributed Generation and Technical Feasibility Study of Distribution Network Expansion at the Tanah Jawa Substation | 2026-05-29 | distribution network expansion, economic feasibility, Grid Code compliance, reactive power compensation, shunt reactor. | Distributed Generation | Fathin Saifur Rahman Tri (editor) | Deny Hamdani --> Yosua Sahat Halomoan | Rizky Rahmani Arwindra | 1. Sent 26/6/15, due 6/30 (done) 2. Sent 26/6/15 26/6/24 due 6/30 (done) 3. Sent 26/6/15, due 6/30 (done) | 9% | Accept | 2,2,1 | 2026-07-15 | |||||||||||||||
3 | 2 | 017 | Rangga Pribadi Hadi Saputra, Arwindra Rizqiawan | Design of An Adaptive Multiport Charging System for Electric Motorcycle Batteries | 2026-06-07 | adaptive charging, multiport converter, DC–DC buck converter, electric motorcycle, CC–CV charging, C-rate, LiFePO₄ battery. | Power Electronics | Burhanuddin Halimi --> Sofyan Muhammad Ilman | Jihad Furqani | Rejeki Simanjorang Tri (editor) | 1. Sent 26/6/16 26/6/26 due 6/30 (done) 2. Sent 26/6/16, due 6/30 (done) 3. Sent 26/6/16, due 6/27 (done) | 27% | Minor | 2,2,0 | 2026-07-15 | |||||||||||||||
4 | 3 | 024 | Army Frans Tampubolon, Arwindra Rizqiawan | A Thermal-Aware Framework for Distribution Transformer Hosting Capacity Considering Rooftop PV Inverter Harmonics | 2026-06-06 | distribution transformer, hosting capacity, rooftop photovoltaic, harmonic distortion, inverter harmonics, hot-spot temperature | Power Quality | Adinda Ihsani Putri | Novalio Daratha | Slamet Riyadi | 1. Sent 26/6/16, due 6/27 (done) 2. Sent 26/6/16, due 6/27 (done) 3. Sent 26/6/16, due 6/27 (done) | 16% | Accept | 2,2,2 | 2026-07-05 | |||||||||||||||
5 | 4 | 062 | Vannak Vai, Rizal Anas Khasbullah, Anushka Gupta, Kevin Marojahan Banjar Nahor, Arwindra Rizqiawan, Yun Prihantina Mulyani, Hilya Mudrika Arini, Budi Hartono, Rokhima Rostiani, Dawi Karomati Baroroh | Comparative Review of Residential Rooftop Solar PV Regulations in Indonesia, Australia, Germany, and Japan | 2026-04-30 | Solar PV, Regulation, Renewable Energy, Literature Review | Green Facilities and Industries | Suwarno Arpan | Ahmed Abu-Siada | Deny Hamdani Tri (Editor) | 1. Sent 26/5/28 due 5/31 (done) 2. Sent 26/5/28 due 6/5 (done) 3. Sent 26/5/28 due 5/31 (done) | 20% | Accept | 2,2,1 | 2026-07-16 | |||||||||||||||
6 | 5 | 064 | Yanfa'uni Ade Pradena Wibowo, Kevin Marojahan Banjar-Nahor | Comparison of Bank Overvoltage and Unbalance Current on 2 Different Internally Fused Shunt Capacitor Banks Arrangement with Double-Wye Ungrounded Bay Configuration | 2026-05-30 | Shunt capacitor bank, Internally fused capacitor, Overvoltage, Unbalance current, Double-wye ungrounded, Protection | Power System Control and Stability | Pradita Octoviandiningrum Hadi | Fathin Saifur Rahman Tri (Editor) | Rizky Rahmani --> Giga Verian Pratama | 1. Sent 26/6/15, due 6/30 (done) 2. Sent 26/6/15, due 6/30 (done) 3. Sent 26/6/15 26/6/26 due 6/30 (done) | 18% | Minor | 2,0,1 | 2026-07-04 | |||||||||||||||
7 | 6 | 114 | Gamal Fiqih Handono Warih, Adam Wicaksono, Muhammad Hizbullah Abrori | Modification of Operation Mode on the Variable Inlet Guide Vanes Control System to Enhance the 13E1 Gas Turbine Reliability | 2026-06-30 | Turbine, Variable Inlet Guide Vane (VIGV), Frequency Control System, Power Plant Reliability, Active Power Regulation | Power System Control and Stability | Tri Ardiani | Febi Ariefka Septian Putra | Bima Gerry Pratama | 1. Sent 7/6 due 7/8 (done) 2. Sent 7/6 due 7/8 (done) 3. Sent 7/6 due 7/8 (done) | 29% | Accept | 1,2,2 | 2026-07-15 | |||||||||||||||
8 | 7 | 131 | Theodorus Yoganata, Nicky Aditya Mathias, Azmi Nur Karim | Analysis of Charging Station Business Opportunities in Indonesia Based on the Growth of Charging Station Infrastructure Influenced by Electric Car Buying Interest, Public Income, and Electric Car Prices. | 2026-05-21 | charging station, electric vehicle, revenue, price, buying interest, linear regression | Electric Drives | Pradita Octoviandiningrum Hadi | Deny Hamdani --> Dini Hariani Fitri Lubis | Endah Komalasari | 1. Sent 26/6/15, due 6/30 (done) 2. Sent 26/6/15 26/6/24 due 6/30 (done) 3. Sent 26/6/15, due 6/27 (done) | 27% | Major | -2, 1, -1 | ||||||||||||||||
9 | 8 | 139 | Amin, Feri Yusivar, Faiz Husnayain, Aam Muharam, Sunarto Kaleg | The Current Sharing of Passive Battery-Supercapacitor Hybrid Energy Storage System for Electric Vehicles under Real-life Driving Conditions | 2026-04-30 | battery, electric vehicle, hybrid energy storage system (HESS), passive topology, regenerative braking, supercapacitor | Electric Drives | Burhanuddin Halimi --> Sofyan Muhammad Ilman | Muhammad Farid Muttaqin | Slamet Riyadi | 1. Sent 26/5/28 26/6/26 due 5/31 6/30 (done) 2. Sent 26/6/15 due 6/30 (done) 3. Sent 26/5/28 due 6/3 (done) | 27% | Accept | 2,2,3 | 2026-07-04 | |||||||||||||||
10 | 9 | 170 | Linda Faridah, Cepi Nur Awalin, Andri Ulus Rahayu, Rian Nurdiansyah, Imam Taufiqurrahman, Sutisna | Design and Implementation of an Off-Grid Hybrid Photovoltaic System for Fish Ponds Utilizing a Recirculating Aquaculture System (RAS) | 2026-05-29 | Off-grid hybrid PV system, Recirculating Aquaculture System (RAS), PVsyst, solar energy, energy production. | Renewable Power Generation | Burhanuddin Halimi | Muhammad Farid Muttaqin | Musa Partahi Marbun Tri (Editor) | 1. Sent 26/6/15, due 6/30 (done) 2. Sent 26/6/15, due 6/30 (done) 3. Sent 26/6/15, due 6/27 (done) | 22% | Minor | 1,2,0 | 2026-07-11 | |||||||||||||||
11 | 10 | 207 | Hilary Evelyn Tjandra, Intan Nuraini Ciptaning, Rachmawati, Suwarno | Effect of Coating Application Methods on the Hydrophobicity and Electrical Performance of Ceramic Insulators Under Polluted Conditions | 2026-06-24 | High voltage insulator, coating method, hydrophobicity, leakage current, surface resistance | High Voltage Engineering | Bryan Denov Tri (editor) | Arpan Zaeni | Mustamin | 1. Sent 7/6 due 7/8 (done) 2. Sent 7/6 due 7/8 (done) 3. Sent 7/6 due 7/8 (done) | 17% | Accept | 2,3,1 | 2026-07-15 | |||||||||||||||
12 | 11 | 211 | Ritika Yadav | Speed to Spark:From Traffic to Electricity | KIET Group of Instutions,BVG India Pvt Ltd | India | 2026-05-10 | Power Generation, Renewable Energy, Speed Breakers, Infrastructure, Rack & Pinion | Renewable Power Generation | Arwindra Rizqiawan | Burhanuddin Halimi | Dhami Johar Damiri | 1. Sent 26/5/28 due 5/31 (done) 2. Sent 26/5/28 due 5/31 (done) 3. Sent 26/5/28 due 6/3 (done) | 26% | Major | -2, 2, -3 | ||||||||||||||
13 | 12 | 215 | Muhammad Akmal A. Putra, Tina Wahyuningsih, Suwarno, Alvin Harista Rahman, Abdu Yakan Rosyadi, Liska Safarina | Multi-Label Classification of Photovoltaic Cell Cracks in Electroluminescence Images Using Efficient Deep Learning | 2026-05-30 | photovoltaic modules, electroluminescence imaging, crack classification, deep learning, transfer learning, model calibration | Renewable Power Generation | Bryan Denov Rachmawati | Arpan Zaeni | Dian Retno Sawitri | 1. Sent 26/6/15, due 6/30 (done) 2. Sent 26/6/15, due 6/30 (done) 3. Sent 26/6/15, due 6/27 (done) | 19% | Minor | -1,2,3 | 2026-07-15 | |||||||||||||||
14 | 13 | 226 | Irfansyah Abiyu Tamir, Tsaqif Fataher Rizky, Bryan Denov, Syarif Hidayat | Lightning Surge Current Distribution on a Lattice Transmission Tower with Down Conductors: A Full-Wave MoM Analysis | 2026-04-30 | lightning surge, lattice tower, current distribution, down conductor | High Voltage Engineering | Bambang Anggoro | Syamsir Abduh | Zenichiro Kawasaki Tri (editor) | 1. Sent 26/5/28 (done) 2. Sent 26/5/28 due 6/5 (done) 3. Sent 26/5/28 due 6/5 (done) | 20% | Accept | 2,2,1 | 2026-07-11 | |||||||||||||||
15 | 14 | 236 | ANUGRAH KRISNA MEIRENDRA, Leonardus Heru Pratomo | Direct Grid Injection from a Battery-Less Photovoltaic Source via MPPT Boost Converter and Dual-Loop H-Bridge Inverter | 2026-05-31 | h-bridge inverter, grid-connected photovoltaic system, dual-loop control, proportional–integral controller, maximum power point tracking. | Renewable Power Generation | Adinda Ihsani Putri | Novalio Daratha | Rejeki Simanjorang Tri (editor) | 1. Sent 26/6/15, due 6/27 (done) 2. Sent 26/6/15, due 6/27 (done) 3. Sent 26/6/15, due 6/27 (done) | 11% | Major | 0,-2,0 | ||||||||||||||||
16 | 15 | 246 | alqindy rakafsya, Burhanuddin Halimi | Optimization of an Isolated 20 kV Distribution Network by Utilizing Renewable Energy Potential (Case Study: Telaga Diesel Power Plant (PLTD), Central Kalimantan) | 2026-05-31 | isolated power system, hybrid renewable energy system, photovoltaic, battery energy storage system, biomass, techno-economic optimization. | Renewable Power Generation | Muhammad Farid Muttaqin | Dhami Johar Damiri | Musa Partahi Marbun Tri (Editor) | 1. Sent 26/6/15, due 6/30 (done) 2. Sent 26/6/15, due 6/27 (done) 3. Sent 26/6/15, due 6/27 (done) | 14% | Accept | 2,2,1 | 2026-07-11 | |||||||||||||||
17 | 16 | 263 | Lailatul Fauziyah, Burhanuddin Halimi | Event-Based Adaptive Setpoint Strategy with Proactive Lead for Improved Tracking Accuracy and Thermal Performance in Dual-Axis Parabolic Dish Systems | 2026-05-31 | Solar Tracking, Event-Based Control, Proactive Lead Setpoint, Adaptive Setpoint, Parabolic Dish, Thermal Performance | Renewable Power Generation | Jihad Furqani | Muhammad Farid Muttaqin | Wiwit Kastawan | 1. Sent 26/6/15, due 6/30 (done) 2. Sent 26/6/15, due 6/30 (done) 3. Sent 26/6/15, due 6/27 (done) | 20% | Accept | 3,3,2 | 2026-07-04 | |||||||||||||||
18 | 17 | 273 | Ngesti Bayu Satrio Anggodo, Fathin Saifur Rahman, Kevin Marojahan Banjar Nahor | PSO-Based Operating Pattern Optimization of the Bali 150 kV Subsystem Under the Planned 500 kV Java–Bali Interconnection | 2026-05-31 | 500 kV Java–Bali interconnection, Bali 150 kV subsystem, operational readiness, Particle Swarm Optimization, DIgSILENT PowerFactory, generation redispatch, operating cost, transmission overload. | Power Transmission and Distribution | Deny Hamdani --> Yosua Sahat Halomoan | Khai Phuc Nguyen Tri (Editor) | Firman Sasongko | 1. Sent 26/6/15 26/5/24 due 6/30 (done) 2. Sent 26/6/15, due 6/27 (done) 3. Sent 26/6/15, due 6/27 (done) | 20% | Accept | 2,1,1 | 2026-07-11 | |||||||||||||||
19 | 18 | 275 | Dhucha Ajitama, Arwindra Rizqiawan | Techno-Economic and Performance Assessment of an Off-Grid Portable Agrivoltaic Battery System | 2026-06-06 | portable agrivoltaics, off-grid irrigation, PVsyst, battery energy storage, LCOE, loss of load probability, rainfed rice farming | Renewable Power Generation | Burhanuddin Halimi | Pradita Octoviandiningrum Hadi | Slamet Riyadi | 1. Sent 26/6/16, due 6/30 (done) 2. Sent 26/6/16, due 6/30 (done) 3. Sent 26/6/16, due 6/27 (done) | 16% | Accept | 2,2,1 | 2026-07-06 | |||||||||||||||
21 | 20 | 309 | Kridia Agus Burhani, Fathin Saifur Rahman, Eduard Nugroho Theopilus, Ahmad Taufik Yunanto | Voltage Level Selection for Urban Data Center Power Supply: A Comparative Study of 20 kV, 66 kV, and 150 kV Systems | 2026-06-07 | Data Center, Voltage, 66 kV System, Reliability, DIgSilent. | Power Transmission and Distribution | Kevin Marojahan Banjar-Nahor --> Dini Hariani Fitri Lubis | Pradita Octoviandiningrum Hadi | Deny Hamdani Rachmawati | 1. Sent 26/6/16 26/6/24 due 6/30 (done) 2. Sent 26/6/16, due 6/30 (done) 3. Sent 26/6/16, due 6/30 | 9% | Minor | 1,0,1 | ||||||||||||||||
22 | 21 | 310 | Ifah Dea Hapsyari, Tri Desmana Rachmilda | Hybrid Automaton-Based Predictive Control with Adaptive Switching Priority for a Grid-Connected T-Type Inverter | 2026-05-30 | — T-type inverter, model predictive control, hybrid automaton, grid-connected inverter, current tracking, switching constraints | Power Electronics | Arwindra Rizqiawan --> Dini Hariani Fitri Lubis | Novalio Daratha | Rejeki Simanjorang Tri (editor) | 1. Sent 26/6/15 26/6/24 due 6/30 (done) 2. Sent 26/6/15, due 6/27 (done) 3. Sent 26/6/15, due 6/27 (done) | 28% | Minor | 0,1,0 | ||||||||||||||||
23 | 22 | 320 | Imaduddin, Andhy Dharma Setyawan, Gugun Bonar MJD, Fakhrul Risal Djumingin, Achmad Syerif Habibie | AI-Based Tropical Zone Transformer Health Index Classification with Shapely Additive Explanation | 2026-03-15 | transformer health index, insulation, winding capacitance, missing imputation, imbalance class, ensamble learning, gradient boost, recall, accuracy. | Smart Grid | Suwarno Rachmawati | Muhammad Akmal Afibuddin Putra | Syamsir Abduh | 1. Sent 26/5/28 due 5/31 done 2. Sent 26/5/28 due 5/31 (done) 3. Sent 26/5/28 due 6/5 (done) | 29% | Minor | -1,2,2 | 2026-07-04 | |||||||||||||||
24 | 23 | 337 | Ahmad Helmy, Umar Khayam, Arwindra Risqiawan | Health Index Framework Design for DC EV Chargers Based on Failure History and Thermal Sampling | 2026-04-30 | EV Charger, Health Index, FMEA, Condition Based Maintenance, Thermal Sampling | Power Electronics | Rachmawati | Ahmed Abu-Siada | Dian Retno Sawitri | 1. Sent 26/5/28 due 5/31 (done) 2. Sent 26/5/28 due 6/5 (done) 3. Sent 26/5/28 due 6/3 (done) | 18% | Accept | 2,3,1 | 2026-07-05 | |||||||||||||||
25 | 24 | 338 | Giovanni Ryan Setiyawan, Slamet Riyadi | Analysis of Three-Phase Four-Leg Shunt Active Power Filter Performance Under Extreme Loads | 2026-05-26 | active power filter, source instantaneous power, αβ0 trajectory, total harmonic distortion | Power Quality | Arwindra Rizqiawan --> Sofyan Muhammad Ilman | Giga Verian Pratama (pak fathin udah approve) | Endah Komalasari | 1. Sent 26/6/15 26/6/30 due 6/30 (done) 2. Sent 26/6/15, due 6/30 (done) 3. Sent 26/6/15, due 6/27 (done) | 10% | Accept | 2,2,1 | 2026-07-06 | |||||||||||||||
26 | 25 | 341 | Dheny Cipta Firnanda, Mochamad Andrew Sukisworo, Rahmat Fitriadi | Generator Bearing Condition Interpretation Through Vibration and Temperature Forecasting Using LSTM Priok Power Plants | 2026-06-30 | predictive maintenance, condition monitoring, generator bearings, vibration analysis, LSTM, time series forecasting. | Power Generation | Burhanuddin Halimi | Muhammad Farid Muttaqin | Jihad Furqani | 1. Sent 7/6 due 7/8 (done) 2. Sent 7/6 due 7/8 (done) 3. Sent 7/6 due 7/8 (done) | 25% | Accept | 2,3,2 | 2026-07-11 | |||||||||||||||
27 | 26 | 346 | Vannak Vai, Anushka Gupta, Rizal Anas Khasbullah, Kevin Marojahan Banjar Nahor, Arwindra Rizqiawan, Yun Prihantina Mulyani, Hilya Mudrika Arini, Budi Hartono, Dawi Karomati Baroroh, Rokhima Rostiani | Residential Rooftop Solar Deployment Readiness in Emerging Asian Markets: A Comparative Study of India, Indonesia, Malaysia, and Cambodia | Department of Electrical and Energy Engineering Institute of Technology of Cambodia Phnom Penh,Cambodia ; STEI ITB ; UGM | Cambodia ; Indonesia | 2026-05-03 | Residential solar, photovoltaic deployment, rooftop PV, Indonesia, India, Malaysia, Cambodia, maintenance feasibility, LCOE, policy barriers. | Renewable Power Generation | Deny Hamdani --> Febi Ariefka Septian Putra | Musa Partahi Marbun Tri (Editor) | Endah Komalasari | 1. Sent 26/5/28 due 5/31 26/6/26 due 6/30 (done) 2. Sent 26/5/28 due 6/2 (done) 3. Sent 26/5/28 due 6/2 (done) | 24% | Minor | 3,1,-1 | 2026-07-11 | |||||||||||||
29 | 28 | 375 | Tri Santoso, Burhanuddin Halimi, Pradita Octoviandiningrum Hadi | Mutual Shading Mitigation for a 100 MWp Solar Farm on Hilly Terrain | 2026-06-07 | shading, hilly terrain, tilt, inter-row spacing, pitch, azimuth, pitch ruler methode, land use, PVsyst, Banjar, Caipeng | Renewable Power Generation | Kevin Marojahan Banjar-Nahor Tri (editor) | Deny Hamdani Arwindra | Dian Retno Sawitri | 1. Sent 26/6/16, due 6/30 (done) 2. Sent 26/6/16, due 6/30 3. Sent 26/6/16, due 6/27 (done) | 13% | Major | -1,0,2 | ||||||||||||||||
30 | 29 | 414 | Faisal Hadi Kurniawan, Arwindra Rizqiawan | Modeling and Analysis of Voltage Compensation Strategy on 150 kV Isolated Radial System Considering the Impact of Industrial Loads from a Smelting Plant | 2026-06-01 | Isolated radial system, voltage compensation, shunt reactor, industrial smelter load, reactive power, voltage stability. | Power System Control and Stability | Kevin Marojahan Banjar-Nahor --> Dini Hariani Fitri Lubis | Tri (editor) | Firman Sasongko | 1. Sent 26/6/16 26/6/24 due 6/30 (done) 2. Sent 26/6/16, due 6/30 3. Sent 26/6/16, due 6/27 (done) | 9% | Reject | -1,-2,-1 | ||||||||||||||||
31 | 30 | 419 | Reyhan Revandy, Kevin Marojahan Banjar Nahor, Fathin Saifur Rahman | A Two-Stage Hybrid GA-PSO Algorithm for Adaptive Overcurrent Protection in Dynamic Distribution Systems | 2026-04-30 | Adaptive Coordination, Distributed Energy Resources, Hybrid GA-PSO, Overcurrent Relay, Smart Grid | Smart Grid | Pradita Octoviandiningrum Hadi | Ahmed Abu-Siada | Rizky Rahmani Tri (Editor) | 1. Sent 26/5/28 due 5/31 (done) 2. Sent 26/5/28 due 6/5 (done) 3. Sent 26/5/28 due 5/31 (done) | 20% | Accept | 2,3,1 | 2026-07-11 | |||||||||||||||
32 | 31 | 420 | Kayla Nasywa Vilia, Rafid Fadhila, Rachmawati, Suwarno | Performance Enhancement of RTV Silicone Rubber Coating Materials using SiO₂–Al₂O₃–BN Nano Fillers | 2026-06-30 | High-voltage outdoor insulator, RTV-SiR, nano silica, nano-boron nitride, nano-aluminum oxide. | Dielectrics and Insulation Technology | Bryan Denov | Arpan Zaeni | Mustamin | 1. Sent 7/6 due 7/8 (done) 2. Sent 7/6 due 7/8 (done) 3. Sent 7/6 due 7/8 (done) | 25% | Accept | 2,2,2 | 2026-07-09 | |||||||||||||||
33 | 32 | 423 | Choirul Arifin, Arwindra Rizqiawan, Kevin Marojahan Banjar Nahor | Multi-Constraint Hosting Capacity Evaluation of Rooftop Photovoltaic Systems in Industrial Distribution Networks: An Indonesian Case Study | 2026-06-07 | hosting capacity, rooftop photovoltaic, quasi-dynamic analysis, industrial distribution network, harmonics, reverse power flow, voltage, thermal. | Distributed Generation | Adinda Ihsani Putri | Novalio Daratha | Firman Sasongko | 1. Sent 26/6/16, due 6/27 (done) 2. Sent 26/6/16, due 6/27 (done) 3. Sent 26/6/16, due 6/27 (done) | 22% | Reject | 0,-1,-1 | ||||||||||||||||
34 | 33 | 445 | Agil Zusanto, Gopas Radot Napitupulu, Adinda Ihsani Putri | Feasibility Study of a Solar-Powered Electrical Vechicle Charging Station at Tangerang | 2026-06-29 | Electric Vehicles, EV Charging Station, On-Grid Photovoltaic System, Economic Analysis. | Renewable Power Generation | Arwindra Rizqiawan | Febi Ariefka Septian Putra | Sofyan Muhammad Ilman | 1. Sent 7/6 due 7/8 (done) 2. Sent 7/6 due 7/8 (done) 3. Sent 7/6 due 7/8 (done) | 21% | Minor | 2,2,0 | 2026-07-11 | |||||||||||||||
35 | 34 | 452 | Ulrich Ludolfinger, Maren Martens | Live Evaluation of Rule-Based, Model Predictive, and Reinforcement Learning Battery Control in a Student Dormitory | University of Applied Sciences Landshut | Germany | 2026-05-31 | battery energy storage, demand response, dynamic pricing, model predictive control, reinforcement learning, residential energy management | Smart Grid | Kevin Marojahan Banjar-Nahor | Pradita Octoviandiningrum Hadi | Arwindra Rizqiawan | 1. Sent 26/6/15, due 6/30 (done) 2. Sent 26/6/15, due 6/30 (done) 3. Sent 26/6/15, due 6/30 (done) | 21% | Accept | 3,2,2 | 2026-06-30 | |||||||||||||
36 | 35 | 453 | Anas Satria, Edward Sebastian Suwondo, Rizky Ajie Aprilianto, Adinda Ihsani Putri | Design Revitalization of a Solar-Powered Irrigation Pump System: A Case Study in Gunungkidul | 2026-06-29 | Irrigation, PV system, Battery-Less, LCOE, LCOW | Renewable Power Generation | Burhanuddin Halimi | Muhammad Farid Muttaqin | Bima Gerry Pratama | 1. Sent 7/6 due 7/8 (done) 2. Sent 7/6 due 7/8 (done) 3. Sent 7/6 due 7/8 (done) | 9% | Accept | 2,2,3 | 2026-07-11 | |||||||||||||||
38 | 37 | 500 | Haekal Kiyan Ahkam, Beny Rachmanto, Wanda Darmawan | Energy Measurement Error Analysis of DC Electric Vehicle Supply Equipment Using a Vehicle Integrated Mobile Reference System | 2026-05-31 | DC EVSE, energy measurement error, Hioki PW8001, OIML G 22, NIST Handbook 44, metrological verification, measurement uncertainty. | Power Quality | Burhanuddin Halimi | Slamet Riyadi (reject inv) --> Febi Ariefka Septian Putra | Muhammad Rizal Fabio | 1. Sent 26/6/15, due 6/30 (done) 2. Sent 26/6/15, due 6/27 26/6/26 due 6/30 (done) 3. Sent 26/6/15, due 6/30 (done) | 8% | Accept | 2,2,3 | 2026-07-06 | |||||||||||||||
39 | 38 | 525 | Ridwan Fauzan Dhoifullah, Reyhan Effendi, Ruslam R. Pakki, Okta Fitrya, Bryan Denov, Reynaldo Zoro | Design and Analysis of Internal Lightning Protection Systems and Grounding for Light Rail Transit (LRT) Rolling Stock | 2026-04-30 | LRT, SPD, Internal Lightning Protection System, Insulation Coordination, IEC 62497 | Lightning Technology and Grounding System | Syarif Hidayat | Arpan Zaeni | Bambang Anggoro | 1. Manual (done) 2. Sent 26/5/28 due 5/31 (done) 3. Sent 26/5/28 due 5/31 (done) | 26% | Minor | 2,0,3 | 2026-07-09 | |||||||||||||||
40 | 39 | 533 | Reyhan Effendi, Ridwan Fauzan D., Ruslam Rachmadi Pakki, Okta Fitrya, Reynaldo Zoro, Bryan Denov | Design of External Lightning Protection System & Grounding at the Jakarta-Depok-Bekasi Light Rail Transit Station in Cibubur | 2026-04-30 | External Lightning Protection System, Extended Mast Terminal, Rolling Sphere Method, Light Rail Transit, Voltage Elevation | Lightning Technology and Grounding System | Syarif Hidayat | Syamsir Abduh | Bambang Anggoro | 1. Manual (done) 2. Sent 26/5/28 due 6/5 (done) 3. Sent 26/5/28 due 5/31 (done) | 15% | Accept | 2,1,2 | 2026-07-09 | |||||||||||||||
41 | 40 | 537 | Xyla Fajar Setiawan, Leonardus Heru Pratomo | Enhanced Power Decoupling and Independent MPPT in a Cascaded Boost Three-Leg Inverter PV System: Validation under Resistive and Inductive Loads | 2026-05-26 | single-phase photovoltaic system, cascaded boost converter, three-leg inverter, active power decoupling, mppt, resistive–inductive load, thd, dc-link ripple reduction. | Renewable Power Generation | Arwindra Rizqiawan --> Sofyan Muhammad Ilman | Novalio Daratha | Endah Komalasari | 1. Sent 26/6/15 26/6/26 due 6/30 (done) 2. Sent 26/6/15, due 6/27 (done) 3. Sent 26/6/15, due 6/27 (done) | 7% | Accept | 2,1,2 | 2026-07-05 | |||||||||||||||
42 | 41 | 540 | Rundu Adi Wahyudi, Pradita Octoviandiningrum Hadi | A Quantitative Framework for Evaluating Pre-AMI Monitoring Systems Using Detection and Mapping Capabilities in Distribution Networks | 2026-06-08 | AMI, Energy Loss, Distribution Network, Detection Capability, Mapping Capability, Smart Metering | Power Transmission and Distribution | Kevin Marojahan Banjar-Nahor Tri (editor) | Deny Hamdani --> Febi Ariefka Septian Putra | Dian Retno Sawitri | 1. Sent 26/6/16, due 6/30 2. Sent 26/6/16 26/6/26 due 6/30 (done) 3. Sent 26/6/16, due 6/27 (done) | 20% | Major | -1,1,0 | ||||||||||||||||
43 | 42 | 553 | Nugroho Bagus Wicaksono, Pradita Octoviandiningrum Hadi, Burhanuddin Halimi | Techno-Economic Analysis of Hybrid PV–BESS–Diesel System for Isolated Island Power Supply: A Case Study of Sabu Island, Indonesia | 2026-06-02 | renewable energy, photovoltaic system, bifacial PV, hybrid power system, techno-economic analysis, isolated grid | Microgrid | Kevin Marojahan Banjar-Nahor Tri (editor) | Fathin Saifur Rahman | Dian Retno Sawitri | 1. Sent 26/6/16, due 6/30 2. Sent 26/6/16, due 6/30 (done) 3. Sent 26/6/16, due 6/27 (done) | 17% | Major | 0,-1,1 | ||||||||||||||||
44 | 43 | 562 | Novriza Hanum Surya, Kevin Marojahan Banjar Nahor, Pradita Octoviandiningrum Hadi, Nikko Fita Faizal | Reactive Power Penalty Schemes for Small Hydropower Plants at the Point of Common Coupling in a Medium-Voltage Distribution Feeder | 2026-05-31 | Reactive power penalty, point of common coupling, small hydropower plant, independent power producer, distribution feeder, quasi-dynamic simulation. | Distributed Generation | Deny Tri (editor) | Rizky Rahmani Arwindra | Dhami Johar Damiri | 1. Sent 26/6/15 26/6/24 due 6/30 2. Sent 26/6/15, due 6/30 (done) 3. Sent 26/6/15, due 6/27 (done) | 12% | Accept | 2,2,1 | 2026-07-16 | |||||||||||||||
45 | 44 | 569 | Robert Al Quds, Kevin Marojahan Banjar Nahor, Fathin Saifur Rahman | Recloser Placement Optimization Using Hybrid GA-PSO Algorithm to Enhance Distribution Network Reliability | 2026-05-31 | Distribution Network, Reliability, SAIDI, SAIFI, ENS, Recloser, Failure Mode and Effects Analysis (FMEA), Hybrid GA-PSO | Power Transmission and Distribution | Pradita Octoviandiningrum Hadi --> Yosua Sahat Halomoan | Deny Pradita | Khai Phuc Nguyen Tri (Editor) | 1. Sent 26/6/15 26/6/24 due 6/30 (done) 2. Sent 26/6/15, due 6/30 3. Sent 26/6/15, due 6/27 (done) | 17% | Accept | 2,1,2 | 2026-07-16 | |||||||||||||||
46 | 45 | 578 | Syarif Hidayat, Eko Yudo Pramono | System-Constrained Transfer Capacity of a 230 kV AC Submarine Interconnection for 700 MW Export from Batam to Singapore under N−1 and Reactive Power Limit | 2026-06-14 | HVAC submarine cable, charging current, reactive power compensation, N−1 reliability, cross-border power export | Power Transmission and Distribution | Pradita | Fathin Saifur Rahman Deny Arwindra | Tri Ardriani (Editor) | 1. Sent 26/6/24, due 6/30 (done) 2. Sent 26/6/24, due 6/30 3. Sent 26/6/24, due 6/30 (done) | 9% | Accept | 1,1,2 | 2026-07-16 | |||||||||||||||
47 | 46 | 580 | Muhammad Nashih Rabbani, Fathin Saifur Rahman, Claysius Dewanata Widjaja | OPTIMIZING TRANSMISSION CAPACITY USING DYNAMIC LINE RATING UNDER TROPICAL CLIMATE CONDITIONS | 2026-06-07 | Dynamic Line Rating, Static Line Rating, IEEE 738, ampacity, overhead line | Power Transmission and Distribution | Pradita Octoviandiningrum Hadi | Rizky Rahmani Tri (Editor) | Firman Sasongko | 1. Sent 26/6/16, due 6/30 (done) 2. Sent 26/6/16, due 6/30 (done) 3. Sent 26/6/16, due 6/27 (done) | 29% | Accept | 2,2,1 | 2027-07-11 | |||||||||||||||
48 | 47 | 582 | Ignatius Agung Pratama, Kevin Marojahan Banjar Nahor, Fathin Saifur Rahman | Aplication of Whale Optimization Algorithm for SCOPF in 20kV Isolated System | 2026-04-30 | Security-Constrained Optimal Power Flow, Whale Optimization Algorithm, Isolated Power System, Contingency Analysis. | Power System Control and Stability | Rizky Rahmani --> Dini Hariani Fitri Lubis | Khai Phuc Nguyen Tri (Editor) | Ahmed Abu-Siada | 1. Sent 26/5/28 due 5/31 26/7/2 (done) 2. Sent 26/5/28 due 6/3 (done) 3. Sent 26/5/28 due 6/5 (done) | 23% | Accept | 2,1,2 | 2026-07-09 | |||||||||||||||
49 | 48 | 601 | Liska Safarina, Suwarno, Muhammad Akmal A Putra | Handling of Imbalanced Class in Power Transformer Condition Prediction Using SMOTE Variants and Machine Learning Algorithms | 2026-05-11 | power transformer, condition prediction, resampling technique, SMOTE variants, neural network, random forest | High Voltage Engineering | Rachmawati | Ahmed Abu-Siada | Umar Khayam Tri (editor) | 1. Sent 26/5/28 due 5/31 (done) 2. Sent 26/5/28 due 6/5 (done) 3. Sent 26/5/28 26/6/26 due 5/31 (done) | 30% | Accept | 3,3,1 | 2026-06-29 | |||||||||||||||
50 | 49 | 617 | Dwi Noval Kurniawan, Leonardus Heru Pratomo | Single Output Current Sensor Implementation in Three-Phase Buck Converter for Controlled Excitation of Synchronous Generators | 2026-05-26 | single current sensor, three-phase buck DC-DC converter, synchronous generator excitation system, current balance, current ripple | Power Electronics | Wiwit Kastawan | Rejeki Simanjorang Farid | Muhammad Rizal Fabio | 1. Sent 26/6/15, due 6/27 (done) 2. Sent 26/6/15, due 6/27 (done) 3. Sent 26/6/15, due 6/30 (done) | 9% | Accept | 1,2,2 | 2026-07-11 | |||||||||||||||
51 | 50 | 621 | Farhan Maulana Akmal, Juanto Sirait, Willy Indra Hikmawan, Fitrianingrum, Syamsriza Wiguna, Umar Khayam | Comparative Analysis of RC Detector, HFCT, and Microstrip Antenna for Partial Discharge Measurement in SF6 Gas Insulation | 2026-06-07 | partial discharge, SF6 gas insulation, RC detector, HFCT, microstrip antenna, gas-insulated switchgear | High Voltage Engineering | Arpan Zaeni | Mustamin | Sylvian Fauveaux | 1. Sent 26/6/16, due 6/30 (done) 2. Sent 26/6/16, due 6/27 (done) 3. Sent 26/6/16, due 6/27 (done) | 24% | Accept | 2,2,2 | 2026-07-09 | |||||||||||||||
52 | 51 | 636 | Irna Transista, Fathin Saifur Rahman, Kevin Marojahan Banjar Nahor, Adhi Priyanto Hartono, Destiany Prawidyasari | Optimal Configuration with Sensitivity Analysis and Demand Response to Develop Full Off-Grid Solar Farm in Tunda Island | 2026-05-31 | Hybrid Energy System, Solar PV, BESS, Sensitivity Analysis, Demand Response | Renewable Power Generation | Adinda Ihsani Putri | Arwindra Rizqiawan | Musa Partahi Marbun Tri (Editor) | 1. Sent 26/6/15, due 6/27 (done) 2. Sent 26/6/15, due 6/30 (done) 3. Sent 26/6/15, due 6/27 (done) | 16% | Major | 0,-2,1 | ||||||||||||||||
53 | 52 | 685 | Jin Hong Fei, Muchamad Arief Dharmawan, Subhan Hasisi | IMPROVING AUXILIARY POWER EFFICIENCY OF COAL-FIRED POWER PLANTS THROUGH DATA-DRIVEN OPTIMIZATION OF BOILER FEED PUMP OPERATION | 2026-03-28 | Boiler feed pump, energy consumption, random search, genetic algorithm, particle swarm optimization. | Electrical Machinery | Burhanuddin Halimi --> Febi Ariefka Septian Putra | Wiwit Kastawan | Khai Phuc Nguyen Tri (Editor) | 1. Sent 26/5/28 26/7/2 due 7/8 (done) 2. Sent 26/5/28 due 6/2 (done) 3. Sent 26/5/28 due 6/3 (done) | 21% | Accept | 2,2,1 | 2026-07-11 | |||||||||||||||
54 | 53 | 687 | Irham Tantowi Hamdi, Kevin M. Banjar-Nahor, Fathin Saifur Rahman | OPTIMAL FEEDER PLACEMENT USING CROW SEARCH ALGORITHM AND ITS IMPACTS ON VOLTAGE PROFILE IMPROVEMENT AND LOSS REDUCTION | 2026-05-31 | optimization, feeder reconfiguration, power loss, voltage profile, and Crow Search Algorithm. | Power Transmission and Distribution | Pradita Octoviandiningrum Hadi --> Yosua Sahat Halomoan | Rizky Rahmani Tri (Editor) | Nana Sutisna Deny Hamdani Pradita | 1. Sent 26/6/15 26/6/24 due 6/30 (done) 2. Sent 26/6/15, due 6/30 (done) 3. Sent 26/6/15, due 6/30 | 25% | Accept | 2,1,2 | 2026-07-16 | |||||||||||||||
55 | 54 | 695 | Rahma Salsabiella Adhinintia, Agus Darmawan, Shuo-Yan Chou | Bi-Level Multi-Objective Optimization of PV-HESS Sizing and Dispatch Under Utility Ramp-Rate Constraints for Campus Microgrids | 2026-05-29 | hybrid energy storage system, campus microgrid, multi-objective optimization, tariff-aware dispatch, ramp-rate mitigation | Microgrid | Kevin Marojahan Banjar-Nahor --> Giga Verian Pratama | Fathin Saifur Rahman --> Yosua Sahat Halomoan (pak fathin udah review) | Musa Partahi Marbun Tri (Editor) | 1. Sent 26/6/15 26/6/26 due 6/30 (done) 2. Sent 26/6/15, due 6/30 (done) 3. Sent 26/6/15, due 6/27 (done) | 13% | Accept | 3,3,1 | 2026-07-11 | |||||||||||||||
56 | 55 | 699 | Tsaqif Fataher Rizky, Irfansyah Abiyu Tamir, Bryan Denov, Syarif Hidayat | Modeling and Visualization of Lightning Protection Coverage: A Comparison of Electrogeometric and Collection Volume Approaches | 2026-04-30 | Collection Volume Method (CVM), Electro-Geometric Method (EGM), 3D Rhinoceros, Lightning Protection, Overhead Transmission Line | Lightning Technology and Grounding System | Bambang Anggoro | Syamsir Abduh | Zenichiro Kawasaki Tri (Editor) | 1. Sent 26/5/28 due 5/31 (done) 2. Sent 26/5/28 due 6/5 (done) 3. Sent 26/5/28 due 6/5 (done) | 24% | Accept | 3,2,1 | 2026-07-11 | |||||||||||||||
57 | 56 | 701 | Antonius Doddy Tyas Prasetyo, Judo Ignatius Nempung, Eva Magdalena Silalahi, Tahan M.N.T. Lumban Tobing | Potential Study, Optimization, and Economic Analysis of Onshore Wind Power Plant Development in Indonesia's 3T Islands Based on NASA POWER Data for Sustainable Energy | 2026-03-30 | wind energy onshore, 3T regions, NASA POWER, Weibull distribution, Wake loss, LCOE, renewable energy optimization. | Renewable Power Generation | Kevin Marojahan Banjar-Nahor Tri (editor) | Khai Phuc Nguyen Arwindra | Rizky Rahmani --> Yosua Sahat Halomoan | 1. Sent 26/6/23, due 6/30 2. Sent 26/6/23, due 6/30 (done) 3. Sent 26/6/23 26/6/24 due 6/30 (done) | 15% | Major | -1,-2,0 | ||||||||||||||||
58 | 57 | 726 | Dwiga Rahman Syarif, Burhanuddin Halimi | Thermal-Electric Efficiency Analysis of Photovoltaic Module Using Integrated Thermoelectric Generators: Based Active Cooling System | 2026-06-01 | photovoltaic, cooling system, thermoelectric generator, efficiency, waste energy | Renewable Power Generation | Arwindra Rizqiawan --> Dini Hariani Fitri Lubis | Muhammad Farid Muttaqin | Muhammad Rizal Fabio | 1. Sent 26/6/16 26/6/24 due 6/30 (done) 2. Sent 26/6/16, due 6/30 (done) 3. Sent 26/6/16, due 6/30 (done) | 22% | Accept | 2,1,1 | 2026-07-05 | |||||||||||||||
59 | 58 | 744 | Intan Nuraini Ciptaning, Hillary Evelyn Tjandra, Rachmawati, Suwarno | Performance Analysis of Outdoor Insulators with Different Coating Application Techniques under Dry and Industrial Pollution Conditions | 2026-06-22 | insulator coating, spray coating, dip coating, RTV Silicone rubber coating, leakage current | Dielectrics and Insulation Technology | Bryan Denov Arwindra | Umar Khayam Tri (Editor) | Arpan Zaeni | 1. Sent 26/6/24, due 6/30 2. Sent 26/6/24, due 6/30 (done) 3. Sent 26/6/24, due 6/30 (done) | 24% | ||||||||||||||||||
60 | 59 | 759 | Cahyo Prihananto, Kevin M. Banjar-Nahor, Pradita Octoviandiningrum Hadi | When Capital Constraints Dominate: Computational Evidence from Multi-Dataset Generation Protfolio Optimization | 2026-06-15 | generation expansion planning; MCDA; MILP; capital constraint; portfolio optimization; multi-dataset robustness | Smart Grid | Bima Gerry Pratama | Deny Hamdani Rachmawati | Arwindra Rizqiawan | 1. Sent 26/6/24, due 6/30 (done) 2. Sent 26/6/24, due 6/30 3. Sent 26/6/24, due 6/30 (d0ne) | 15% | Minor | 2,2,0 | ||||||||||||||||
61 | 60 | 766 | Hudaibiy Hibban, Fathin Saifur Rahman, Kevin Marojahan Banjar Nahor | A Hunger Games Search-Based Approach for Optimal Protection Coordination in Distribution Networks with Distributed Generation | 2026-06-07 | Protection Coordination, Distributed Generation, Hunger Games Search | Smart Grid | Pradita Octoviandiningrum Hadi | Rizky Rahmani Tri (Editor) | Firman Sasongko | 1. Sent 26/6/16, due 6/30 (done) 2. Sent 26/6/16, due 6/30 (done) 3. Sent 26/6/16, due 6/27 (done) | 26% | Minor | 0,0,1 | ||||||||||||||||
62 | 61 | 779 | Meiji Mamondol, Mukhamad Daris Alfarrel, Fermi Trafianto, Kevin Marojahan Banjar Nahor, Fathin Saifur Rahman | Predictive Overload Shedding Scheme for Multi-IBT Systems Based on Short-Term Forecasting and Feeder Sensitivity Selection | PDFNYA KOSONG | 2026-06-01 | inter-bus transformer, load shedding, overload shedding, predictive protection, Recursive Least Squares, Adaptive AR(2), sensitivity matrix, transformer overload | Power System Control and Stability | Pradita Octoviandiningrum Hadi --> Giga Verian Pratama | Rizky Rahmani | Bryan Denov | |||||||||||||||||||
63 | 62 | 787 | Mikhael Abhiseka Pramono, Roni Septian, Bryan Denov, Umar Khayam | Transient Electromagnetic Analysis of Indirect Lightning Strikes on Floating Roof Tanks using Finite Element Method | 2026-05-02 | Finite Element Method, COMSOL Multiphysics, Induced voltage | High Voltage Engineering | Syarif Hidayat | Bambang Anggoro | Zenichiro Kawasaki Tri (Editor) | 1. Manual (done) 2. Sent 26/5/28 due 5/31 (done) 3. Sent 26/5/28 due 6/5 (done) | 19% | Accept | 1,2,1 | 2026-07-11 | |||||||||||||||
64 | 63 | 794 | Ilham Sa'inal Nur Permadi, Gugun Bonar Maruhum Jusman Daniel, Nofan Dwi Mulyanto | Power Cable Clamp Modification to Mitigate Hotspots Due to Eddy Current Effects | 2026-03-29 | power transformers, outdoor design, hot spot at power cable clamp, permeability, and eddy current | High Voltage Engineering | Suwarno Tri (Editor) | Rachmawati | Arpan Zaeni | 1. Sent 26/5/28 due 5/31 (done) 2. Sent 26/5/28 due 5/31 (done) 3. Sent 26/5/28 due 5/31 (done) | 9% | Minor | 0,1,2 | 2026-07-04 | |||||||||||||||
65 | 64 | 823 | Muhammad Puji Prasetyo, Pradita Octoviandiningrum Hadi, Abdorasoul Ghasemi | Autoencoder-Based Electricity Non-Technical Loss Identification and Economic Analysis in Advanced Metering Infrastructure Systems | 2026-05-31 | Autoencoder, Advanced Metering Infrastructure, Anomaly Detection, Non-Technical Losses, Economic Analysis. | Smart Grid | Kevin Marojahan Banjar-Nahor Tri (editor) | Fathin Saifur Rahman --> Bima Gerry Pratama | Nana Sutisna Arwindra | 1. Sent 26/6/15, due 6/30 2. Sent 26/6/15 26/6/24 due 6/30 (done) 3. Sent 26/6/15, due 6/30 (done) | 23% | Accept | 2,1,1 | 2026-07-15 | |||||||||||||||
66 | 65 | 842 | Muhamad Munif Ulinnuha, Bryan Denov, Umar Khayam | ANALYSIS OF LIGHTNING PROTECTION PERFORMANCE BETWEEN EXTERNALLY GAPPED LINE ARRESTER (EGLA) AND NON-GAPPED LINE ARRESTER (NGLA) ON DISTRIBUTION NETWORKS IN HIGH LIGHTNING DENSITY AREAS | 2026-06-01 | Transient simulation, NGLA, EGLA, Lightning Stroke | Lightning Technology and Grounding System | Suwarno Bryan Rachmawati | Arpan Zaeni | Sylvian Fauveaux | 1. Sent 26/6/16, due 6/30 (done) 2. Sent 26/6/16, due 6/30 (done) 3. Sent 26/6/16, due 6/27 (done) | 25% | Accept | 2,1,1 | 2026-07-15 | |||||||||||||||
67 | 66 | 843 | Yoga Kharisma, Umar Khayam, Fathin Saifur Rahman | Analysis of the Effects of High Temperature and Humidity on Insulation Resistance Degradation of Electric Vehicle Supply Equipment | 2026-05-31 | Electric vehicle supply equipment, EVSE, insulation resistance, high temperature, humidity, accelerated environmental stress test, degradation constant, electrical safety. | Dielectrics and Insulation Technology | Rachmawati | Arpan Zaeni | Muhammad Rizal Fabio | 1. Sent 26/6/15, due 6/30 (done) 2. Sent 26/6/15, due 6/30 (done) 3. Sent 26/6/15, due 6/30 (done) | 11% | Major | 0,-2,2 | ||||||||||||||||
68 | 67 | 849 | Handrea Tambunan, Haryadi, Eko Andrijanto, Lina Troskialina, Budi Santoso, S. P. Mursid, Sanudi | Life Cycle Assessment of 5 kW Solid Oxide Fuel Cells System | 2026-04-27 | Emissions, SOFC, LCA, CO2, GWP, natural gas | Green Facilities and Industries | Burhanuddin Halimi --> Tri (Editor) | Muhammad Farid Muttaqin | Dhami Johar Damiri | 1. Sent 26/5/28 26/7/2 due 7/8 (done) 2. Sent 26/6/15, due 6/30 (done) 3. Sent 26/5/28 due 6/3 (done) | 49% | Major | -2,2,0 | 2026-07-05 | |||||||||||||||
69 | 68 | 867 | Rumbidzai Lorraine Sibanda, Jangkung Raharjo, Sudarmono Sasmono | A Low-Cost Hybrid SCADA Architecture for Micro-Hydropower Systems: Design, Evaluation, and Deployment Insights | 2026-04-30 | SCADA, smartgrid, micro-hydropower, LoRa, rural electrification, hybrid architecture | Smart Grid | Kevin Marojahan Banjar-Nahor Tri (editor) | Dhami Johar Damiri | Fathin Saifur Rahman Giga | 1. Sent 26/5/28 due 5/31 2. Sent 26/5/28 due 6/3 (done) 3. Sent 26/5/28 due 5/31 (done) | 21% | Accept | 2,2,1 | 2026-07-15 | |||||||||||||||
70 | 69 | 909 | Selekta Sembiring Berahmana, Deny Hamdani, Umar Khayam | Reliability Centered Maintenance (RCM) Approach to Evaluate Time Based Maintenance Intervals for High Voltage Circuit Breaker | 2026-06-07 | maintenance, circuit breaker, substation, reliability | Power Transmission and Distribution | Rachmawati | Arpan Zaeni | Sylvian Fauveaux | 1. Sent 26/6/16, due 6/30 (done) 2. Sent 26/6/16, due 6/30 (done) 3. Sent 26/6/16, due 6/27 (done) | 19% | Accept | 2,3,2 | 2026-07-05 | |||||||||||||||
71 | 70 | 914 | Kelvin Judika Riccardo Marbun, Kevin M. Banjar-Nahor, Pradita Octoviandiningrum Hadi | Electric Power Supply Planning for Irrigation Pumping Systems Using Gompertz-Based Forecasting and Demand Response Strategy | 2026-04-28 | Gompertz model, demand response, agricultural electrification, load flow, distribution systems | Green Facilities and Industries | Fathin Saifur Rahman Tri (editor) | Dian Retno Sawitri | Rizky Rahmani Deny Rachmawati | 1. Sent 26/5/28 due 5/31 2. Sent 26/5/28 due 6/3 (done) 3. Sent 26/5/28 due 5/31 | 12% | Minor | -1,1,2 | ||||||||||||||||
72 | 71 | 955 | Amar Hameed, Raed Kafafy | Electrothermal Power Modeling of a Thermoelectrically Actuated Micronozzle | Iraq ; United Arab Emirates | 2026-05-03 | thermoelectric device, Peltier effect, micronozzle, micropropulsion, electrothermal modeling, power consumption | Power Electronics | Arwindra Rizqiawan | Rejeki Simanjorang | Slamet Riyadi | 1. Sent 26/5/28 due 5/31(done) 2. Sent 26/5/28 due 6/2 (done) 3. Sent 26/5/28 due 6/3 (done) | 20% | Accept | 3,1,1 | 18-Jun-2026 | ||||||||||||||
73 | 72 | 958 | Faiq Murtadlo, Bryan Denov, Umar Khayam | Optimization of Transmission Line Arrester Installation on 150 kV Quadruple Circuit Transmission Line Based on Insulator Voltage and TLA Energy Using ATP Draw | 2026-06-07 | ATPDraw, flashover, lightning, quadruple circuit transmission line, Transmission Line Arrester, Cost-Effectiveness Index | Lightning Technology and Grounding System | Syarif Hidayat | Suwarno Arpan | Sylvian Fauveaux | 1. Manual (done) 2. Sent 26/6/16, due 6/30 (done) 3. Sent 26/6/16, due 6/27 (done) | 26% | Accept | 2,2,2 | 2026-07-14 | |||||||||||||||
74 | 73 | 980 | Roni Septian, Mikhael Abhiseka Pramono, Bryan Denov, Umar Khayam | A Tropical-Based Approach for Lightning Protection Design in Oil and Gas Facilities Using Rolling Sphere Method and EMT–FSM Integration | 2026-04-30 | Lightning protection, rolling sphere method, tropical lightning, peak current probability, oil and gas facilities | High Voltage Engineering | Syarif Hidayat | Syamsir Abduh | Zenichiro Kawasaki Tri (Editor) | 1. Manual (done) 2. Sent 26/5/28 due 6/5 (done) 3. Sent 26/5/28 due 6/5 (done) | 25% | Accept | 2,1,1 | 2026-07-11 | |||||||||||||||
75 | 74 | 997 | Frederikus Puguh Satrio Nugroho, Fathin Saifur Rahman, Pradita Octoviandiningrum Hadi | Feasibility Study of EV Charging Station Integration in Low Voltage Distribution Networks to Optimize Substation Loading and Corporate Revenue: A Case Study in PT PLN (Persero) ULP Mustika Jaya | 2026-06-07 | charging station, electric vehicle, distribution network, substation, load, voltage, losses | Power Transmission and Distribution | Deny Hamdani --> Giga Verian Pratama | Rizky Rahmani --> Yosua Sahat Halomoan | Endah Komalasari | 1. Sent 26/6/16 26/6/26 due 6/30 (done) 2. Sent 26/6/16 26/6/24 due 6/30 (done) 3. Sent 26/6/16, due 6/27 (done) | 9% | Accept | 3,2,2 | 2026-07-09 | |||||||||||||||
76 | ||||||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||||||
101 | ||||||||||||||||||||||||||||||
102 | ||||||||||||||||||||||||||||||
103 |