| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | REKAPITULASI ANGGARAN RPTNV POLITEKNIK NEGERI BATAM TA 2025 | |||||||||||||||||||||||||
2 | ||||||||||||||||||||||||||
3 | Nama | Sumber Dana | Banyaknya | Persentase | Persentase | |||||||||||||||||||||
4 | Peningkatan Level kualitas Layanan TUK PLC Advance | RPTNV | 1,730,184,875 | 88.01% | 88.01% | 88.01% | ||||||||||||||||||||
5 | Sertifikasi Trainer PLC | RPTNV | 84,740,000 | 4.31% | 4.31% | 15.75% | ||||||||||||||||||||
6 | FDG Pembelajaran PLC Advance | RPTNV | 150,891,672 | 7.68% | 7.68% | |||||||||||||||||||||
7 | FGD Tata Kelola | RPTNV | 73,891,672 | 3.76% | 3.76% | |||||||||||||||||||||
8 | Total | 1,965,816,547 | 100.00% | |||||||||||||||||||||||
9 | Alumenium Workband & Kabel DC AWG (Bahan Habis Pakai-BHP) Layanan TUK PLC Advance | PT | 289,270,000 | 14.72% | 14.72% | 14.72% | ||||||||||||||||||||
10 | Total | 2,328,978,219 | 118.47% | |||||||||||||||||||||||
11 | ||||||||||||||||||||||||||
12 | Ruang Lingkup Penggunaan Anggaran | |||||||||||||||||||||||||
13 | Ruang Lingkup/No | Komponen Biaya | Volume | Persentase (%) | Usulan Anggaran yang disetujui (Rp) | |||||||||||||||||||||
14 | Ruang Lingkup 1 Meningkatkan Relevansi Pembelajaran | 11,99% | 74,891,672 | |||||||||||||||||||||||
15 | 1. | Forum Grup Discusi Pembelajaran PLC Advance melibatkan Dosen, Mahasiswa dan Industri | Kegiatan | 7,68 % | 150,891,672 | |||||||||||||||||||||
16 | 2. | Sertifikasi Trainer PLC | Kegiatan | 4,31% | 84,740,000 | |||||||||||||||||||||
17 | Ruang Lingkup 2 Meningkatkan Tata Kelola Kemitraan | 3,76% | 73,891,672 | |||||||||||||||||||||||
18 | 3 | FGD Tata Kelola | Kegiatan | 3,76% | 73,891,672 | |||||||||||||||||||||
19 | Ruang Lingkup 3 Menguatkan Hilisasi Inovasi, Penelitian Terapan, dan Kepakaran yang Berdampak | 88,01 % | 1,730,184,875 | |||||||||||||||||||||||
20 | 4. | Peningkatan Level kualitas Layanan TUK PLC Advance | Paket | 88,01% | 1,730,184,875 | |||||||||||||||||||||
21 | Total | 100 % | 1,965,816, 547 | |||||||||||||||||||||||
22 | ||||||||||||||||||||||||||
23 | ||||||||||||||||||||||||||
24 | Spesifikasi Rinci untuk Peralatan yang diusulkan | |||||||||||||||||||||||||
25 | Peningkatan Level kualitas Layanan TUK PLC Advance | |||||||||||||||||||||||||
26 | Nama Peralatan | Spesifikasi Teknis | Tautan Rujukan HPS **) | Jumlah | Harga Satuan | Ongkos Kirim | Perkiraan Biaya | keterangan | ||||||||||||||||||
27 | (dalam ribuan Rp) | (dalam ribuan Rp) ***) | (dalam ribuan Rp) =(4x5)+6 | |||||||||||||||||||||||
28 | (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | ||||||||||||||||||
29 | PLC | Input type: DC Battery Backup: Optional Battery CP2W-BAT02 Analog Option Units: Yes Number of Expansion IO: 3 Built-in I/O: 40 Total I/O capacity: 160 Supply voltage: 120-240 VAC Output type: Transistor Number of Option Modules: 2 Communications: 2 Ethernet, 2 Option Port Include Analog I/O Unit 4 Input (CP1W-AD042) Input range: 0 to 5 V, 1 to 5 V, 0 to 10 V, ±10 V, 0 to 20 mA, or 4 to 20 mA. 4 Output (CP1W-DA042) Ouput range: 1 to 5 V, 0 to 10 V, ±10 V, 0 to 20 mA, or 4 to 20 mA. Resolution: 1/12000 | QT.2-0318.0625 Rev 01 Polibatam_electric (1).pdf | 25 | 28,576,395.00 | - | 714,409,875.00 | |||||||||||||||||||
30 | HMI | Bezel color : Black Display Color : graphics Enclosure Type : Type 1 indoor use only HMI type : Dedicated Basic HMI Interaction : Touch screen International Standards : UL, CSA, CE LED backlight : 50Khr white LED Maritime Standards : GOST-R, EAC Memory Card Type : USB Display size and type : 10.1-inch TFT Color LCD Resolution : 800 x 480 Memory size : 128 MB Web interface : Yes RS-232C port : 1 built in RS-232C/RS-422A/RS-485 port : 1 built in USB host : 1 built in USB slave : 1 built in Ethernet port : 1 built in Printer : PictBridge Mounting orientation : Portrait, Landscape | PT Utronic Jaya.pdf | 25 | 9,620,000.00 | - | 240,500,000.00 | |||||||||||||||||||
31 | Servo Motor | Rated Output(W) : 100 Power Supply : Single-phase/ Three-phase Electromagnetic Brakes : Presence Rated Rotation Speed(r/min) : 3000 Voltage Specifications : 200V Class Shaft end shape : Standard (straight) Reducer : No | PT Utronic Jaya.pdf | 25 | 7,400,000.00 | - | 185,000,000.00 | |||||||||||||||||||
32 | Driver Motor Servo | Rated Capacity (kW) : 0,1 Number of Axes : 1 Safety Function Type : STO (IEC/EN 61800-5-2) Power Supply 1 Phase (VAC) : 200-240 Power Supply 3 Phase (VAC) : 200-240 Dynamic Break : BUILT-IN Command Interface : CC-LINK IE FIELD NETWORK | PT Utronic Jaya.pdf | 25 | 21,321,000.00 | - | 533,025,000.00 | |||||||||||||||||||
33 | Inverter | Communication port protocol : Modbus Supply frequency : 50/60 Hz +/- 5 % rated supply voltage : 200...240 V - 15...10 % Nominal output current : 3.5 A Motor power hp : 0.75 hp Motor power kW : 0.55 kW Motor power hp : 0.75 hp EMC filter : Integrated IP degree of protection : IP20 Discrete input number : 4 Discrete output number : 2 Analogue input number : 1 Analogue output number : 1 Relay output number : 1 Physical interface : 2-wire RS 485 Connector type : 1 RJ45 Continuous output current : 3.5 A at 4 kHz Method of access : Server Modbus serial Speed drive output frequency : 0.5…400 Hz | PT Utronic Jaya.pdf | 25 | 2,290,000.00 | - | 57,250,000.00 | |||||||||||||||||||
34 | Total | 1,730,184,875 | ||||||||||||||||||||||||
35 | ||||||||||||||||||||||||||
36 | ||||||||||||||||||||||||||
37 | Sertifikasi Non Gelar dan SPPD | |||||||||||||||||||||||||
38 | Nama Kegiatan | Rincian Biaya | Jumlah kegiatan | Satuan | Harga Satuan (dalam ribuan Rp) | Perkiraan Biaya (dalam ribuan Rp) =(4x5)+6 | Keterangan | |||||||||||||||||||
39 | (1) | (2) | (3) | (4) | (5) | (7) | (8) | |||||||||||||||||||
40 | PLC Advanced Training (Plc Operation, Programming, Troubleshooting and Maintenance) | Biaya Training | 5 | OK | 8,500,000 | 42,500,000 | Kursus, Training, Pelatihan PLC Bandung | |||||||||||||||||||
41 | SPPD Sertifikasi | Tiket Pesawat (1 KEG X 50 ORG) | 5 | OK | 2,888,000 | 14,440,000 | ||||||||||||||||||||
42 | Penginapan (4 HARI X 10 ORG X 1 KEG) | 20 | OH | 730,000 | 14,600,000 | |||||||||||||||||||||
43 | Uang Harian (4 HARI X 10 ORG X 1 KEG) | 20 | OH | 530,000 | 10,600,000 | |||||||||||||||||||||
44 | Biaya Transport dalam kota (1 KEG x 10 ORG ) | 5 | OK | 520,000 | 2,600,000 | |||||||||||||||||||||
45 | Total | 84,740,000.00 | ||||||||||||||||||||||||
46 | ||||||||||||||||||||||||||
47 | Forum Grup Discusi Pembelajaran PLC Advance melibatkan Dosen, Mahasiswa dan Industri | |||||||||||||||||||||||||
48 | Nama Kegiatan | Rincian Biaya | Jumlah kegiatan | Satuan | Harga Satuan | Total Biaya | keterangan | |||||||||||||||||||
49 | (dalam ribuan Rp) | (dalam ribuan Rp) =(4x5)+6 | ||||||||||||||||||||||||
50 | (1) | (2) | (3) | (4) | (5) | (7) | (8) | |||||||||||||||||||
51 | Forum Grup Discusi Pembelajaran PLC Advance melibatkan Dosen, Mahasiswa dan Industri | Biaya Konsumsi (50 ORG X 1 KEG) | 150 | OK | 80,000 | 12,000,000 | ||||||||||||||||||||
52 | FGD Kits (60 ORG X 1 KEG) | 150 | PAKET | 500,000 | 75,000,000 | |||||||||||||||||||||
53 | Honor Narasumber (6 ORG X 4 JAM X 1 KEG) | 6 | OJ | 300,000 | 1,800,000 | |||||||||||||||||||||
54 | Biaya ATK | 1 | PAKET | 1,791,672 | 1,791,672 | |||||||||||||||||||||
55 | Uang Saku FGD (60 ORG X 4 JAM X 1 KEG) | 150 | OJ | 150,000 | 22,500,000 | |||||||||||||||||||||
56 | Uang Transport (60 ORG X 1 KEG) | 150 | OK | 150,000 | 22,500,000 | |||||||||||||||||||||
57 | Honor Pengarah (1 ORG X 4 BLN) | 4 | OB | 500,000 | 2,000,000 | |||||||||||||||||||||
58 | Honor Penanggung Jawab (1 ORG X 4 BLN) | 4 | OB | 450,000 | 1,800,000 | |||||||||||||||||||||
59 | Honor Ketua Panitia (1 ORG X 4 BLN) | 4 | OB | 400,000 | 1,600,000 | |||||||||||||||||||||
60 | Honor Anggota (9 ORG X 4 BLN) | 36 | OB | 275,000 | 9,900,000 | |||||||||||||||||||||
61 | Total | 150,891,672.00 | ||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||
64 | FGD Tata Kelola | |||||||||||||||||||||||||
65 | Nama Kegiatan | Rincian Biaya | Jumlah kegiatan | Satuan | Harga Satuan | Total Biaya | keterangan | |||||||||||||||||||
66 | (dalam ribuan Rp) | (dalam ribuan Rp) =(4x5)+6 | ||||||||||||||||||||||||
67 | (1) | (2) | (3) | (4) | (5) | (7) | (8) | |||||||||||||||||||
68 | FGD Tata Kelola | Biaya Konsumsi (50 ORG X 1 KEG) | 80 | OK | 80,000 | 6,400,000 | ||||||||||||||||||||
69 | FGD Kits (60 ORG X 1 KEG) | 60 | PAKET | 500,000 | 30,000,000 | |||||||||||||||||||||
70 | Honor Narasumber (6 ORG X 4 JAM X 1 KEG) | 8 | OJ | 300,000 | 2,400,000 | |||||||||||||||||||||
71 | Biaya ATK | 1 | PAKET | 1,791,672 | 1,791,672 | |||||||||||||||||||||
72 | Uang Saku FGD (60 ORG X 4 JAM X 1 KEG) | 60 | OJ | 150,000 | 9,000,000 | |||||||||||||||||||||
73 | Uang Transport (60 ORG X 1 KEG) | 60 | OK | 150,000 | 9,000,000 | |||||||||||||||||||||
74 | Honor Pengarah (1 ORG X 4 BLN) | 4 | OB | 500,000 | 2,000,000 | |||||||||||||||||||||
75 | Honor Penanggung Jawab (1 ORG X 4 BLN) | 4 | OB | 450,000 | 1,800,000 | |||||||||||||||||||||
76 | Honor Ketua Panitia (1 ORG X 4 BLN) | 4 | OB | 400,000 | 1,600,000 | |||||||||||||||||||||
77 | Honor Anggota (9 ORG X 4 BLN) | 36 | OB | 275,000 | 9,900,000 | |||||||||||||||||||||
78 | Total | 73,891,672 | ||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||