ABCDEFGHIJKAFAGAHAIAJAKALAMAN
1
2
3
4
5
6
7
8
9
10
11
12
13
PEMADATAN
14
15
METODE STANDAR PROCTOR
Gs 2.579
16
17
Berat Tanah Basah (gr)
2000.00 2,000.00 2,000.00 2,000.00 2,000.00
18
Kadar Air Mula(%)3.32 3.32 3.32 3.32 3.32
19
Penambahan Air(%) 21.08 24.08 27.08 28.58 30.08
20
Penambahan Air(cc)343.856 401.93 460.00 489.04 518.07
21
22
Berat Cetakan + Tanah Basah (gr)
5,672.00 5,756.00 5,808.00 5,794.00 5,770.00
23
Berat Cetakan (gr)
4024.00 4,024.00 4,024.00 4,024.00 4,024.00
24
Berat Tanah Basah (gr)
1648.001732.001784.001770.001746.00
25
Isi Cetakan (cm3) 936.91 936.91 936.91 936.91 936.91
26
Berat Isi Basah (gr/cm3)
1.761.851.901.891.86
27
Berat Isi Kering (gr/cm3)
1.4791.5151.5201.4931.456
28
29
Berat Cawan + Tanah Basah (gr)
69.07 69.86 72.49 67.07 71.91
30
Berat Cawan + Tanah Kering (gr)
59.58 58.89 59.81 54.97 58.42
31
Berat Air (gr)9.49 10.97 12.68 12.10 13.49
32
Berat Cawan (gr)9.39 9.08 9.56 9.43 10.23
33
Berat Tanah Kering (gr)
50.19049.81050.25045.54048.190
34
Kadar Air (%)18.9122.0225.2326.5727.99
35
Υzav1.731.641.561.531.50
36
37
38
39
40
41
42
43
44
45
46
47
OMC23%23.60%
48
Berat Isi Kering maksimal
1.525 gr/cm3
1.530 gr/cm3
49
y = -0.0028x2 + 0.1282x + 0.0453
50
y'=
-0.0056X + 0.1282
=0
51
52
22.89285714-0.1282
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100