A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Mobility Plan ID | In FY 20-23 TIP? | County | Jurisdiction | Project Type | Project Name | Termini | Description | Estimated Total Cost (Year 2020 Dollars) | Horizon Year | Estimated Horizon Year Cost | ||||||||||||||
2 | 09-101a | Yes | Anderson | Oak Ridge | Roadway | Edgemoor Road (SR-170) - Phase 1 | SR-62 (Oak Ridge Hwy) to Melton Lake Dr | Widen from 2-lanes to 4-lanes with median and/or center turn lane. Also includes bicycle/pedestrian facilities and a new bridge over the Clinch River. | $55,100,000 | 2030 | $71,442,093 | ||||||||||||||
3 | 09-101b | Yes | Anderson | Anderson County | Roadway | Edgemoor Road (SR-170) - Phase 2 | Melton Lake Dr to Clinton Hwy (US-25W/SR-9) | Widen from 2-lanes to 4-lanes with median and/or center turn lane. Also includes bicycle/pedestrian facilities and a new bridge over the Clinch River. | $70,600,000 | 2030 | $91,539,234 | ||||||||||||||
4 | 09-202 | Blount | Alcoa | Roadway | Robert C Jackson Dr Extension - Phase 1 | Middlesettlements Rd to Louisville Rd (SR-334) | Construct new 4-lane roadway | $13,254,010 | 2030 | $17,185,013 | |||||||||||||||
5 | 09-204 | Blount | Alcoa | Roadway | Pellissippi Place Access Road Extension | Pellissippi Place Existing Terminus to Wildwood Rd | Construct new 2-lane road with center turn lane or median and bicycle/pedestrian facilities | $12,094,500 | Illustrative | N/A | |||||||||||||||
6 | 09-207 | Blount | Alcoa | Roadway | Wrights Ferry Road Center Turn Lane Improvements | Airbase Rd to Topside Rd | Reconstruct 2-lane road with addition of continuous center turn lane and bicycle/pedestrian facilities | $11,554,208 | 2045 | $24,380,779 | |||||||||||||||
7 | 09-209 | Blount | Blount County | Roadway | Ellejoy Rd Reconstruction | From Tuckaleechee Pike to Jeffries Hollow Road | Reconstruction of Ellejoy Road 4.3 miles of 2 - lane with shoulders from Tuckaleechee Pike to Jeffries Hollow Road. | $11,355,433 | 2040 | $20,370,866 | |||||||||||||||
8 | 09-211 | Blount | Blount County | Roadway | Morganton Road Reconstruction - Phase 1 | Foothills Mall Dr to William Blount Dr (SR-335) | Reconstruct 2-lane road with addition of turn lanes | $9,070,690 | 2026 | $8,439,940 | |||||||||||||||
9 | 09-212 | Blount | Blount County | Roadway | Old Knoxville Hwy (SR-33) Reconstruction | Wildwood Rd to E. Hunt Rd (SR-335) | Reconstruct 2-lane road with addition of turn lanes | $6,266,150 | 2040 | $11,241,042 | |||||||||||||||
10 | 09-213 | Blount | Blount County | Roadway | Old Niles Ferry Road Reconstruction | Maryville City Limits to Calderwood Hwy (SR-115) | Reconstruct 2-lane road with addition of turn lanes | $10,880,650 | 2040 | $19,519,138 | |||||||||||||||
11 | 09-214 | Yes | Blount | Maryville | Roadway | Sevierville Rd (SR-35/US-411) Widening | Washington St (SR-35) to Walnut St | Reconstruct 2-lane road with addition of continuous center turn lane and bicycle/pedestrian facilities | $13,300,000 | 2026 | $14,660,629 | ||||||||||||||
12 | 09-216 | Yes | Blount | Alcoa | Roadway | Alcoa Hwy (SR-115/US-129) Widening | Pellissippi Pkwy (SR-162) to south of Little River | Reconstruct 4-lanes and 6-lanes, including a frontage road system, new interchanges at Singleton Station Road and Topside Road (SR-333), modify the existing SR-115 and SR-162 interchange, and build a multi-use path. | $107,150,000 | 2030 | $138,929,588 | ||||||||||||||
13 | 09-220 | Blount | Alcoa | Roadway | Home Avenue Extension | McCammon Ave to Calderwood St | Construct new 2-lane road with center turn lane to extend Home Ave through existing shopping center to Calderwood St | $5,471,796 | 2045 | $11,546,153 | |||||||||||||||
14 | 09-221 | Blount | Blount County | Roadway | Burnett Station Rd Reconstruction | From Sevierville Road/SR 35/US 411 to Chapman Highway/SR 71/US 441 | Reconstruction of Burnett Station Road 4.4 miles of 2-lane with shoulders from Sevierville Road SR 35 to Chapman Highway SR 71. | $15,571,189 | Illustrative | N/A | |||||||||||||||
15 | 09-223 | Yes | Blount | Maryville | Roadway | Carpenters Grade Rd Reconstruction and Intersection Improvements | Raulston Rd to Cochran Rd | Reconstruct 2-lane road with addition of turn lanes and sidewalk. Construct roundabout at Peterson Ln, Cochran Rd and Raulston Rd intersection. | $3,821,000 | 2026 | $3,761,000 | ||||||||||||||
16 | 09-227 | Blount | Blount County | Roadway | Mentor Rd Reconstruction | From Louisville Road/SR 334 to Wrights Ferry Road | Reconstruction of 3.2 miles of 2-lanes of Mentor Road with shoulders from Louisville Road/SR 334 to Wrights Ferry Road. | $8,049,008 | Illustrative | N/A | |||||||||||||||
17 | 09-229 | Blount | Blount County | Roadway | Morganton Rd Reconstruction - Phase 2 | From William Blount Drive (SR 335) to Walker Road | Reconstruction of Morganton Road 3.3 miles of 2 - lane with shoulders from William Blount Drive to Walker Road. | $8,775,602 | Illustrative | N/A | |||||||||||||||
18 | 09-231 | Blount | Blount County | Roadway | Old Knoxville Hwy (SR-33) Reconstruction - Rockford | Pellissippi Pkwy (SR-162) to Knox County Line | Reconstruct 2-lane road with addition of turn lanes | $12,816,507 | Illustrative | N/A | |||||||||||||||
19 | 09-232 | Yes | Blount | Blount County | Roadway | Pellissippi Pkwy (SR-162) Extension | Old Knoxville Hwy (SR-33) to Lamar Alexander Pkwy (US-321/SR-73) | Construct new 4-lane highway | $84,300,000 | 2026 | $92,924,138 | ||||||||||||||
20 | 09-234 | Blount | Blount County | Roadway | Wildwood Rd Reconstruction | From Maryville City Limits to Sevierville Road. | Reconstruction of 6.1 miles of 2-lane with shoulders from the Maryville City Limits to Sevierville Road. Reconstruction of Wildwood Bridge over the Little River. | $23,848,660 | Illustrative | N/A | |||||||||||||||
21 | 09-239 | Blount | Maryville | Roadway | Montvale Rd (SR-336) Widening | Montvale Station Rd to Southview Drive | Reconstruct 2-lane road with addition of continuous center turn lane and bicycle/pedestrian facilities | $9,352,000 | 2040 | $16,776,845 | |||||||||||||||
22 | 09-240 | Blount | Maryville | Roadway | Sandy Springs Rd at Montgomery Ln Intersection Improvements | Intersection of Sandy Springs Rd at Montgomery Ln | Intersection improvements including turn lanes and new traffic signal | $1,153,108 | 2030 | $1,495,108 | |||||||||||||||
23 | 09-241 | Blount | Maryville | Roadway | Tuckaleechee Pike Reconstruction | US 321 to Grandview Dr | Reconstruct 2-lane road with addition of turn lanes and sidewalk | $5,670,764 | 2045 | $11,965,999 | |||||||||||||||
24 | 09-242 | Yes | Blount | Maryville | Roadway | W Broadway Ave (SR-33/US-411) Improvements | S Cedar St to Lamar Alexander Pkwy (US-321/SR-73) | Construct additional westbound left turn lane at intersection with Lamar Alexander Pkwy and convert continuous center turn lane to additional westbound through lane along W Broadway Avenue. Project includes construction of new shared use path and other bicycle/pedestrian enhancements | $5,209,500 | 2030 | $6,754,584 | ||||||||||||||
25 | 09-243 | Blount | Maryville | Roadway | Wilkinson Pike Widening | Court Street to Grandview Drive | Reconstruct 2-lane road with addition of turn lanes and sidewalk | $3,958,790 | 2040 | $7,101,797 | |||||||||||||||
26 | 09-244 | Blount | Blount County | Roadway | Peppermint Rd Reconstruction | From Wildwood Road to Sevierville Road | Reconstruction of Peppermint Road 1.1 miles of 2-lane with shoulders from Wildwood Road to Sevierville Road. | $10,861,719 | Illustrative | N/A | |||||||||||||||
27 | 09-245 | Blount | Maryville | Roadway | Sevierville Rd (SR-35/US-411) Widening | Everett High Rd to Nina Delozier Road | Reconstruct 2-lane road with addition of continuous center turn lane and bicycle/pedestrian facilities | $19,275,927 | 2035 | $29,398,113 | |||||||||||||||
28 | 09-248 | Blount | Alcoa | Roadway | Topside Road (SR-333) Improvements | Wrights Ferry Rd to Alcoa Hwy (US-129/SR-115) | Reconstruct 2-lane road with addition of continuous center turn lane and bicycle/pedestrian facilities | $4,620,000 | 2045 | $9,748,760 | |||||||||||||||
29 | 09-249 | Blount | Blount County | Roadway | Montvale Rd (SR-336) Reconstruction | Maryville City Limits to Six Mile Rd | Reconstruct 2-lane road with addition of turn lanes | $9,048,710 | Illustrative | N/A | |||||||||||||||
30 | 09-250 | Blount | Blount County | Roadway | Sevierville Rd (SR-35/US-411) Reconstruction | Swanee Dr (Maryville City Limits) to Chapman Hwy (US-441/SR-71) | Reconstruct 2-lane road with addition of turn lanes | $37,194,300 | 2045 | $78,285,495 | |||||||||||||||
31 | 09-257 | Yes | Blount | Alcoa | Roadway | Relocated Alcoa Hwy (SR-115/US-129) | Proposed interchange at Tyson Blvd. to Pellissippi Pkwy (SR-162) | Construct new 4-lane divided highway with auxiliary lanes and new interchanges at McGhee Tyson Airport access, Wright Rd and Pellissippi Pkwy (SR-162) | $117,300,000 | 2026 | $129,300,135 | ||||||||||||||
32 | 09-258 | Yes | Blount | Alcoa | Roadway | Relocated Alcoa Hwy (SR-115/US-129) | Pellissippi Pkwy (SR-162) to South Singleton Station Rd | Construct new 4-lane divided highway with auxiliary lanes and new interchange at Singleton Station Rd | $54,000,000 | 2026 | $59,524,359 | ||||||||||||||
33 | 09-262 | Yes | Blount | Maryville | Roadway | Montvale Rd (SR-336) Widening | Montvale Station Rd to Lamar Alexander Pkwy (US-321/SR-73) | Widen existing roadway to 2 - 12 foot travel lanes with a 12 foot center turn lane including curb and gutter, sidewalk and a multiuse path. | $16,800,000 | 2030 | $21,782,707 | ||||||||||||||
34 | 09-615 | Yes | Knox | Knoxville | Roadway | Washington Pike | I-640 to Murphy Rd | Widen from 2-lanes to 4-lanes including pedestrian and bicycle facilities. | $17,620,000 | 2026 | $19,422,578 | ||||||||||||||
35 | 09-616 | Yes | Knox | Knoxville | Roadway | Pleasant Ridge Road | Merchant Dr to Knoxville City limits (Country Brook Dr) | Reconstruct 2-lane road with addition of turn lanes and bicycle/pedestrian facilities | $7,124,309 | 2026 | $4,450,000 | ||||||||||||||
36 | 09-617 | Yes | Knox | Knoxville | Roadway | Sevier Avenue - South Knoxville Waterfront Roadway Improvements | Sevier Ave from Davenport Rd to new roundabout at Island Home Ave | Construct roadway streetscape improvements and utility relocations along Sevier Ave and new roundabout at the intersection of Foggy Bottom/Sevier Ave/Island Home Ave. | $12,000,000 | 2026 | $8,866,908 | ||||||||||||||
37 | 09-625 | Yes | Knox | Knox County | Roadway | Schaad Rd Widening | Oak Ridge Hwy. (SR-62) to Pleasant Ridge Rd. | Widen from 2 to 4 lanes with addition of sidewalks | $11,500,000 | 2026 | $12,676,484 | ||||||||||||||
38 | 09-626 | Yes | Knox | Multiple | Roadway | Chapman Hwy (SR-71/US-441) Operational and Safety Improvements | Blount Ave to SR-338 (Boyds Creek Hwy in Seymour) | Corridor safety and operational improvements, including intersection improvements and/or driveway improvements and/or left turn lanes at various locations throughout the project area | $50,500,000 | 2035 | $77,018,589 | ||||||||||||||
39 | 09-626d | Knox | Knox County | Roadway | Chapman Hwy (US-441/SR-71) | Hendron Chapel Rd to Simpson Rd | Add center turn lane | $9,000,000 | 2026 | $9,920,726 | |||||||||||||||
40 | 09-629 | Knox | Farragut | Roadway | I-40/I-75/Campbell Station Road Interchange | Interchange of I-40/75 at Campbell Station Rd | Reconfigure existing interchange to improve capacity, safety and operations. | $42,069,500 | 2030 | $54,546,881 | |||||||||||||||
41 | 09-630 | Yes | Knox | Farragut | Roadway | Virtue Road Reconstruction | 2200' south of Broadwood Dr. to Boyd Station Rd. | Reconstruct 2-lane road with addition of turn lanes and bicycle/pedestrian facilities | $7,000,000 | 2026 | $7,716,121 | ||||||||||||||
42 | 09-637 | Yes | Knox | Knox County | Roadway | Lovell Rd Widening (SR-131) | Cedardale Ln. to Middlebrook Pk. (SR-169) | Widen 2-lane to 4-lane, including pedestrian and bicycle facilities. | $19,660,000 | 2030 | $25,490,954 | ||||||||||||||
43 | 09-638 | Knox | Knox County | Roadway | Oak Ridge Hwy (SR-62) | Schaad Rd to Byington Beaver Ridge Rd | Widen from 2 to 4 lanes | $22,724,000 | 2035 | $78,238,685 | |||||||||||||||
44 | 09-643 | Yes | Knox | Knox County | Roadway | Emory Rd (SR-131) | Maynardville Hwy (SR-33) to Tazewell Pk (SR-331) | Widening 2 lanes to 4 lanes with median and; or center turn lane, including bicycle; pedestrian facilities | $70,600,000 | 2030 | $91,539,234 | ||||||||||||||
45 | 09-644 | Knox | Knox County | Roadway | Gov John Sevier Hwy (SR-168) | Alcoa Hwy (SR-115/US-129) to Chapman Hwy (US-441/SR-71) | Widen from 3 to 4-lane divided roadway | $69,300,000 | 2035 | $105,690,856 | |||||||||||||||
46 | 09-645 | Knox | Knox County | Roadway | Northshore Dr (SR-332) | Morrell Rd to Ebenezer Rd | Reconstruct 2-lane road with addition of turn lanes and bicycle/pedestrian facilities | $20,900,000 | 2035 | $31,875,020 | |||||||||||||||
47 | 09-646 | Knox | Knox County | Roadway | Northshore Dr (SR-332) | Pellissippi Pkwy (SR-162) to Concord Rd (SR-332) | Reconstruct 2-lane road with addition of turn lanes and bicycle/pedestrian facilities | $26,400,000 | 2040 | $47,359,784 | |||||||||||||||
48 | 09-647 | Knox | Knox County | Roadway | Pellissippi Pkwy (SR-162) | Edgemoor Rd (SR-170) to Dutchtown Rd | Corridor safety and capacity improvements to include access control, interchange reconstruction, frontage roads, auxiliary lanes and provision for a shared use path | $78,650,000 | 2030 | $101,976,781 | |||||||||||||||
49 | 09-649 | Yes | Knox | Knox County | Roadway | Pellissippi Pkwy (SR-162)/Oak Ridge Hwy Interchange | Interchange at Oak Ridge Hwy (SR-62) | Reconstruct interchange to a Single Point Urban Interchange and provide connection to Solway Rd | $21,400,000 | 2026 | $23,589,283 | ||||||||||||||
50 | 09-651 | Knox | Knox County | Roadway | I-40/I-75/Watt Rd Interchange | Interchange at Watt Rd | Reconfigure existing interchange to improve capacity, safety and operations. | $22,000,000 | 2026 | $24,250,665 | |||||||||||||||
51 | 09-652 | Knox | Knox County | Roadway | I-75 at Emory Rd (SR-131) Interchange | I-75 at Emory Rd (SR-131) Interchange | Reconfigure existing interchange to a Diverging Diamond Interchange to improve capacity, safety and operations. | $11,500,000 | 2026 | $12,676,484 | |||||||||||||||
52 | 09-653 | Yes | Knox | Knoxville | Roadway | Alcoa Hwy (SR-115/US-129) Widening | Woodson Dr. to Cherokee Trail interchange | Widen 4-lane to 6-lane including pedestrian and bicycle facilities. | $66,000,000 | 2026 | $72,751,994 | ||||||||||||||
53 | 09-654 | Yes | Knox | Knoxville | Roadway | I-75/I-640/I-275 Interchange | I-75/I-640/I-275 Interchange | Interchange improvements to include additional through lanes on I-75 north and southbound ramps. | $88,000,000 | 2035 | $134,210,611 | ||||||||||||||
54 | 09-658 | Yes | Knox | Knoxville | Roadway | Northshore Drive at Kingston Pike Intersection Improvements | Intersection of Northshore Dr and Kingston Pk | Intersection improvements including additional turn lanes and sidewalk extensions. Replace bridge over Fourth Creek on Kingston Pike. | $51,300,000 | 2030 | $29,463,705 | ||||||||||||||
55 | 09-668 | Knox | Farragut | Roadway | Kingston Pike (SR-1) Widening | Smith Rd to Campbell Station Rd | Widen from 4 to 6 lanes with addition of bicycle/pedestrian facilities | $16,061,287 | 2040 | $28,812,844 | |||||||||||||||
56 | 09-669 | Knox | Farragut | Roadway | Everett Road Improvements | Watt Rd to Split Rail Ln | Reconstruct 2-lane road with addition of continuous center turn lane and bicycle/pedestrian facilities | $19,512,240 | 2045 | $41,173,191 | |||||||||||||||
57 | 09-673 | Knox | Knox County | Roadway | Oak Ridge Hwy (SR-62) | Byington Beaver Ridge Rd (SR-131) to Pellissippi Pkwy (SR-162) | Widen from 2 to 4 lanes | $41,140,000 | 2035 | $62,743,460 | |||||||||||||||
58 | 09-675 | Knox | Knox County | Roadway | Maryville Pk (SR-33) | Gov John Sevier Hwy (SR-168) to Blount County Line | Reconstruct 2-lane road with addition of turn lanes | $5,940,000 | Illustrative | N/A | |||||||||||||||
59 | 09-680 | Knox | Knox County | Roadway | Northshore Drive Improvements | Concord Rd to Harvey Road | Provide better connectivity from Town of Farragut to the residents on this peninsula | $10,000,000 | Illustrative | N/A | |||||||||||||||
60 | 09-689 | Knox | Knoxville | Roadway | Papermill Drive Complete Street | Weisgarber Rd to Kingston Pk (SR-1) | Reconstruct 2-lane road with addition of turn lanes and bicycle/pedestrian facilities | $10,200,000 | 2030 | $13,225,215 | |||||||||||||||
61 | 09-691 | Knox | Farragut | Roadway | I-40/75 Widening | I-40/75 Interchange to Campbell Station Rd Interchange | Widen from 6 to 8 lanes | $35,737,185 | 2035 | $54,503,516 | |||||||||||||||
62 | 09-692 | Yes | Knox | Knox County | Roadway | I-75 Widening | Emory Rd (SR-131) to Raccoon Valley Rd (SR-170) | Widen from 4 to 6 lanes | $120,200,000 | 2035 | $183,319,493 | ||||||||||||||
63 | 10-260 | Yes | Blount | Maryville | Roadway | Foothills Mall Drive Extension Phase 2 | Foch Street to McCammon Ave | Construct new 2-lane road with center turn lane and sidewalks | $4,285,420 | 2026 | $4,723,831 | ||||||||||||||
64 | 10-700 | Knox | Knox County | Roadway | Campbell Station Rd Improvements | From I-40 to Hardin Valley Road | Widening and realignment of Campbell Station Road from I-40 to Hardin Valley Road. | $21,200,000 | 2030 | $27,487,702 | |||||||||||||||
65 | 13-1003 | Yes | Knox | Knoxville | Other | Chapman Highway Advanced Traffic Management System | Chapman Hwy (US-441/SR-71) from Mountain Grove Dr to Blount Ave | Expand the City of Knoxville's Advanced Traffic Management System along Chapman Highway. | $3,179,000 | 2026 | $3,504,221 | ||||||||||||||
66 | 13-1004 | Yes | Knox | Knoxville | Bike/Ped | Liberty Street Multimodal Project | Middlebrook Pike (SR-169) to Sutherland Avenue | Addition of sidewalks and bicycle facilities along Liberty and Division Streets. | $1,972,536 | 2026 | $1,555,500 | ||||||||||||||
67 | 13-101 | Anderson | Oak Ridge | Roadway | Emory Valley Road at Melton Lake Drive Roundabout | Emory Valley Road at Melton Lake Drive Intersection | Construct a roundabout at Emory Valley Road and Melton Lake Drive to ease traffic flow through this intersection, calm traffic, and establish an aesthetic appeal to our regional rowing venue. | $979,000 | 2026 | $1,079,155 | |||||||||||||||
68 | 13-102 | Anderson | Oak Ridge | Roadway | Tulane Avenue at Pennsylvania Avenue Roundabout Construction | Intersection of Tulane Ave at Pennsylvania Ave | Construct roundabout | $979,000 | 2030 | $1,269,361 | |||||||||||||||
69 | 13-203 | Blount | Alcoa | Roadway | Robert C Jackson Dr Extension - Phase 2 | Louisville Rd (SR-334) to US 129 Bypass (SR-115) | Construct new 4-lane roadway and grade separated interchange connecting US-129 and Associates Boulevard | $26,706,889 | 2040 | $47,910,322 | |||||||||||||||
70 | 13-208 | Blount | Alcoa | Roadway | Harvest Lane Extension | Existing Harvest Ln terminus to Louisville Rd (SR-334) | Construct new 2-lane road with sidewalks | $1,846,229 | 2030 | $2,393,802 | |||||||||||||||
71 | 13-210 | Blount | Alcoa | Roadway | North Park Blvd & Airbase Rd Safety Improvements | Intersection of North Park Blvd & Airbase Rd | Realign North Park Boulevard to Airbase Road | $7,621,339 | 2026 | $8,401,024 | |||||||||||||||
72 | 13-214 | Blount | Blount County | Roadway | Old Lowes Ferry Rd at Louisville Rd (SR-333) Intersection Improvements | Intersection of Old Lowes Ferry Rd at Louisville Rd (SR-333) | Realign intersection and add turn lanes | $631,939 | 2026 | $696,588 | |||||||||||||||
73 | 13-215 | Blount | Blount County | Roadway | Louisville Rd (SR-333/SR-334) Reconstruction - Phase 1 | Alcoa City Limts to Lackey Creek Bridge | Reconstruct 2-lane road with addition of turn lanes | $8,497,005 | Illustrative | N/A | |||||||||||||||
74 | 13-216 | Blount | Blount County | Roadway | Louisville Rd (SR-333) Reconstruction - Phase 2 | Lackey Creek Bridge to Old Lowes Ferry Rd | Reconstruct 2-lane road with addition of turn lanes | $5,370,442 | Illustrative | N/A | |||||||||||||||
75 | 13-218 | Blount | Blount County | Roadway | Middlesettlements Rd at Miser Station Rd Intersection Improvements | Intersection of Middlesettlements Rd at Miser Station Rd | Realign intersection and add turn lanes | $589,732 | 2035 | $899,412 | |||||||||||||||
76 | 13-601 | Yes | Knox | Farragut | Roadway | Union Rd/N Hobbs Rd Reconstruction | Union Rd from N. Hobbs Rd to Everett Rd; N. Hobbs Rd from Kingston Pk to Union Rd | Reconstruct 2-lane road with addition of turn lanes and bicycle/pedestrian facilities | $5,106,000 | 2026 | $4,546,000 | ||||||||||||||
77 | 13-602 | Yes | Knox | Knoxville | Other | Traffic Control Equipment Upgrade - Knoxville (Advanced Traffic Management System - Phase 1) | Kingston Pike (US-70/SR-1) from Metron Center Way to Lovell Rd and Broadway (US-441/SR-33) from Jackson Ave to Foley Dr | Purchase, installation and integration of signal controllers, signal monitors, closed loop equipment and software. Project also includes development of new signal timing plans for the new equipment and software | $12,166,000 | 2026 | $5,350,000 | ||||||||||||||
78 | 13-603 | Knox | Farragut | Roadway | I-40/75 Auxiliary Lanes | Campbell Station Rd Interchange to Lovell Rd Interchange | Construct eastbound and westbound auxiliary lanes between interchanges | $9,573,190 | 2030 | $12,412,500 | |||||||||||||||
79 | 13-802 | Yes | Anderson | Oak Ridge | Other | Oak Ridge Signal Timing Optimization Program: Phase 2 | Oak Ridge Turnpike (SR-95) from Illinois Ave. (SR-62) to Florida Ave./Fairbanks Ave. Includes approx. 0.15 mi. along Georgia Ave. | Signal improvement to include installation of advanced traffic controllers at eleven (11) intersections, fiber optic cable to connect all fourteen (14) signals to the City’s existing fiber network, non-intrusive vehicle detection, the establishment of a traffic operations center to be located in the City Central Services Complex, and the reconstruction of two (2) signals to include mast arms. | $2,855,400 | 2026 | $3,147,516 | ||||||||||||||
80 | 13-813 | Yes | Knox | Farragut | Other | Farragut Advanced Traffic Management System - Phase 1 | All 26 Signailzed Intersections within Town Limits | Upgrade signal communications and equipment at all signalized intersections within the Town to allow for a centrally controlled signal system | $7,020,000 | 2026 | $7,738,167 | ||||||||||||||
81 | 13-830 | Yes | Anderson | Oak Ridge | Bike/Ped | Oak Ridge Rails to Trails | Elza Gate Park near Melton Lake Drive/Greenway to Scarboro Road | Rails to Trails project on abandoned rails from Elza Gate Park at the Oak Ridge Turnpike to the Y-12 National Security Complex on Scarboro Road, and along Belgrade Road, Warehouse Road, Fairbanks Road, and Lafayette Drive. | $4,431,825 | 2026 | $4,073,508 | ||||||||||||||
82 | 13-833 | Yes | Blount | Maryville | Bike/Ped | Maryville to Townsend Greenway - Phase 1 (Brown Creek) | Harper Avenue Trailhead to US 321 | Construct a new shared use path between the existing Maryville/Alcoa Greenway at Aluminum Avenue to Lamar Alexander Pkwy along Brown Creek | $1,873,285 | 2026 | $1,806,269 | ||||||||||||||
83 | 13-838 | Yes | Knox | Knoxville | Bike/Ped | First Creek Greenway - Broadway Streetscape | Woodland Ave to Cecil Ave | Construct a new shared use path extending First Creek Greenway from near Cecil Ave to near Woodland Ave | $3,100,000 | 2026 | $1,804,148 | ||||||||||||||
84 | 13-844 | Knox | Knoxville | Bike/Ped | First Creek Greenway - Downtown East | Caswell Park to Morningside Park | Construct a new shared use path along First Creek connecting Caswell Greenway to Morningside Greenway | $1,980,000 | 2030 | $2,567,248 | |||||||||||||||
85 | 13-852 | Yes | Knox | Knoxville | Bike/Ped | Knoxville South Waterfront Pedestrian/Bicycle Bridge | University of Tennessee campus to Scottish Pike | Construct a new pedestrian/bicycle bridge over the Tennessee River connecting the South Knoxville Waterfront redevelopment area to the University of Tennessee | $42,000,000 | Illustrative | N/A | ||||||||||||||
86 | 13-854 | Knox | Knoxville | Bike/Ped | Baker Creek Greenway | Maynard Glenn Park to Island Home Ave | Construct a new shared use path along Baker Creek, connecting Maynard Glenn Park and Mary James Park to the proposed South Waterfront Greenway | $1,650,000 | 2040 | $2,959,987 | |||||||||||||||
87 | 13-855 | Knox | Knoxville | Bike/Ped | First Creek Greenway - North Knox | Edgewood Park to Mineral Springs Ave | Construct a new shared use path along First Creek connecting Edgewood Park to the proposed First Creek Greenway - Old Broadway segment at Mineral Springs Avenue | $2,750,000 | 2035 | $4,194,082 | |||||||||||||||
88 | 13-858 | Yes | Knox | Knoxville | Bike/Ped | Knoxville Northwest Greenway Connector Phase 2 | Middlebrook Pk. at Third Creek Rd. to SR 62 Western Ave. pedestrian bridge | New trail connecting Middlebrook Pk. At Third Creek Rd. to SR 62 Western Ave. pedestrian bridge. ADA upgrades and pedestrian lighting. | $2,331,437 | 2026 | $2,569,950 | ||||||||||||||
89 | 13-880 | Yes | Knox | Knoxville | Bike/Ped | Atlantic Avenue Sidewalk | Pershing St to Broadway | Construct 3,000 linear feet of sidewalks on Atlantic Ave between Pershing St and Broadway | $1,210,000 | 2026 | $1,333,787 | ||||||||||||||
90 | 13-884 | Knox | Knoxville | Bike/Ped | Chapman Highway Multiuse Path | Young High Pk to Stone Rd | Construct a new shared use path along Chapman Highway from Young High Pike to Stone Road | $2,420,000 | 2026 | $2,667,573 | |||||||||||||||
91 | 17-1006 | Yes | Knox | Knoxville | Transit | KAT Express Transit Service Enhancement - Broadway Transit Signal Priority Implementation | Knoxville Station to N Broadway at Colonial Circle | Implementation of traffic signal and transit enhancements to create a new express BRT route along existing KAT Broadway Route 22. Features include installation of transit signal priority technology, new BRT stops, and and ADA pedestrian improvements equipped with passenger information systems and potential queue jump applications. | $11,000,000 | 2026 | $12,125,332 | ||||||||||||||
92 | 17-101 | Anderson | Oak Ridge | Roadway | Emory Valley Road at Lafayette Drive Intersection | Emory Valley Road at Lafayette Drive Intersection | Remove dedicated right turn lane from Emory Valley (west) to Lafayette Drive (north) with standard right turn lane. | $440,000 | 2026 | $485,013 | |||||||||||||||
93 | 17-201 | Blount | Maryville | Roadway | Amerine Road Improvements | Fielding Drive to Sevierville Rd | Reconstruct 2-lane road with addition of turn lanes and sidewalk | $2,111,681 | Illustrative | N/A | |||||||||||||||
94 | 17-202 | Yes | Blount | Alcoa | Roadway | US 129 Widening | Hall Rd (SR-35) to US 321 | Widen from 4 to 6 lanes | $22,700,000 | 2026 | $25,022,277 | ||||||||||||||
95 | 17-403 | Loudon | City of Loudon | Roadway | Grove Street Resurfacing | US-11 to SR-72 | Resurface roadway and add left turn lane on Hwy 72 | $880,000 | Illustrative | N/A | |||||||||||||||
96 | 17-407 | Loudon | Lenoir City | Roadway | US 11 at Industrial Park Drive Intersection Improvement | Intersection of US 11 at Industrial Park Dr | Intersection improvements including turn lanes and add warning signals | $825,000 | 2026 | $909,400 | |||||||||||||||
97 | 17-416 | Loudon | Loudon County | Roadway | Muddy Creek Road Intersection Realignment | Intersection of Muddy Creek Rd at Virtue Rd | Realign intersection and add turn lanes | $480,700 | 2026 | $529,877 | |||||||||||||||
98 | 17-605 | Knox | Knoxville | Other | Knoxville Center Mall Circulation Study | N/A | Conduct a planning study of the Knoxville Center, I-640 Interchange, frontage roads, and nearby arterial and collectors including a feasibility study to add a new exit from I-640 | $800,000 | Illustrative | N/A | |||||||||||||||
99 | 17-608a | Yes | Knox | Knoxville | Roadway | Magnolia Avenue Streetscape - Phase 3 | N. Bertrand St to N. Kyle St | Construct streetscape improvements in the existing right of way that include raised medians replacing center left-turn lane, signal improvements, bike lanes, improved sidewalks, bus pull-offs, and amenities | $5,000,000 | 2026 | $5,511,515 | ||||||||||||||
100 | 17-608b | Knox | Knoxville | Roadway | Magnolia Avenue Streetscape - Phase 4 | N. Kyle St to Spruce St | Construct streetscape improvements in the existing right of way that include raised medians replacing center left-turn lane, signal improvements, bike lanes, improved sidewalks, bus pull-offs, and amenities | $6,500,000 | 2026 | $7,164,969 |