BOQ FOR THE CONSTRUCTION OF HANDPUMP BOREHOLE, INSTALATION AND PLATFORMING
2
S/NDESCRIPTIONUnit DescriptionQTY RATE AMOUNT(N)
3
ABOQ: For Drilling And Completion Of 5 Inch Diameter Borehole
4
1a.Conduct geophysical survey (field work, interpretation and report with minimum of three VES Point per location) for the location of borehole at a suitable site not less than 30M from exiting latrine.LS1 -
5
1b.Project mobilization and demobilization of equipment and personnel to and from site form contractor's base office LS1 -
6
1c.Pre and Post site Clearing LS1 -
7
1d.Inter sites Mobilization and Demobilization of equipment and personnel.LS1 -
8
1e.Drilling of borehole in sedimentary/basement formationM80 -
9
1f.Supply and install 125mm diameter UPVC casings(threaded ends) of 10 bar pressure rating.M60 -
10
1g.Supply & installation of 125mm diameter UPVC screens (threaded end) of 10 bar pressure rating; slot size 0.5 -1.0mm(factory slotted)M10 -
11
1hSupply and place river gravel/sharp sand for gravel packing.LS1 -
12
1i.Borehole development with air compressor till water is clear, clean and silt freee and disinfect LS1 -
13
1j.Conduct borehole pumping test(constant discharge/recharge) for not less than 3 hours with yield not less than 0.5l/s.LS1 -
14
1k.Conduct water quality analysis (biological, chemical and physical) and borehole disinfectionLS1 -
15
1l.Provide and place cement grout down to 5m from surface to protect borehole from contaminationLS1 -
16
1m.Supply and installation of wellhead on using 212mm diameter x 0.6m height steel pipeLS1 -
17
Sub-Total 1 -
19
BHANDPUMP INSTALLATION
20
B1.1Afridev Riser pipesNR10 -
21
B1.2Stainless Connecting rodsNR10 -
22
B1.3Afridev CylinderNR1 -
23
B1.4Afridev Pump Stand NR1 -
24
B1.5Afridev Head AssemblyNR1 -
25
B Sub-TotalHandpump Installation -
26
CPLATFORMING, DRAINAGE AND SOAKPIT
27
C1.1Platform and drainage as per the design in the drawingLS1 -
28
C1.2Soakpit as specified in the drawingLS1 -
29
CSub-Total Platforming, Drainage and Soakpit -
30
31
SUMMARY
32
SNDescriptionAmount
33
ADRILLING AND COMPLITION OF 5 INCH DIAMETER BOREHOLE -
34
BHANDPUMP INSTALLATION -
35
CPLATFORMING, DRAINAGE AND SOAKPIT -
36
GRAND TOTAL -
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101