LIB projects- current & future
4
Project PMphaselocationstatuscost to dateMOUpriorityNotes
5
Mission RenoationBOA-Andyconstructionexisting sitein progressxn/a
6
Chinatown RenovationBPM-Masoudbid-advertisedexisting sitein progressxn/a
7
Oceanview Newtbdpre-liminary/feasibility studytbdin progressn/a
8
Safety BarrierBOA-IvanconstructionMainin progressxn/aAwaiting Pro Glass – glass for remaining areas delivery to site by mid-March; currently, material/glass is on Ocean Freight transport – from Asia.
9
MoatBPM-Lisafinal designBuilding perimeterin progressxn/aLIB needs costs for option 1 (replacement) and option 2 (refurbishment) to make decision-
10
RoofBPM-Lisabid awardin progressxn/apending bid award- Pioneer Construction; then goes to Commission.
11
Fire AlarmBOA-Andy to be transitioned to BPM-Lisa Zconstructionall floorsin progressxn/a5 phase project; phase 1- 90% completion
12
13
Auxiliary Exhaust FansBPM-Lisafinal design5th, 6th floorsin progress $ 445,954.00 xprovide Lisa with direction- all in one project replacement ($4.8M) or 3 phase replacement ($1.04M, $2.2M, $1.5M)
14
Library Security Systems Upgrade AssessmentBOA-Ivanassessment-cost Main & Branchesin progress $ 55,232.00 x 1assessment completed; now cost estimate phase.
15
Main Library PA system AssessmentBOA-Ivanassessment initiateall floorsin progress x 2LIB request to add to Sec. Systems assessment.
16
Main Library SFHC - Dehumidification of CS rooms AssessmentBOA-Lourdes BOE-Ricky Choiassessment-cost Lower Level, 1stin progress $ 45,277.00 x 6assessment completed; now cost estimate phase.
17
Main Library Cooling Tower Replacement AssessmentBOA-Lourdes BOE-Ricky Choiassessment-cost 6th floor, roofin progress $ 52,576.00 x 3assessment completed; now cost estimate phase.
18
Oceanview HVAC replacmentBOA-Lourdes BOE-Ricky Choiassessment-cost Oceanview Branchinprogress $ 44,589.00 4assessment completed; now cost estimate phase.
19
Main Library Environmental Controls AssessmentBOA-Lourdes BOE-Ricky Choiassessment-cost 6th floor, roofin progress $ 54,086.00 x 5assessment completed; now cost estimate phase.
20
priority
21
Assessment-consulting services for Fire Protection Engineering 3 year smoke management system continuous readiness programtbdasssessment- futureMainnot initiated1Have a 2024 cost proposal
22
Assessment for repair and replace of exterior stone walls and emergency exit doors at the Main Librarytbdasssessment- futureMainnot initiated3
23
Assessment for the replacement of the soft (surface) flooring at the Main Library 6 floorstbdasssessment- futureMAINnot initiated4priority for Dept. Director; will need to be a phased implemetned due to minimize impact to public servcies
24
Assessment to create a Latino Affinity Centertbdasssessment- futureMainnot initiated10
25
Assessment to refresh the Main Children’s Center (MCC) space including replacement of furniture and Burgeon 'Play to Learn' equipmenttbdasssessment- future2nd floor/ mezzaninenot initiatedn/ainternal- FAC-CAP
26
Assessment to replace Emergency Generator that operations Main Library fire system pumpstbdasssessment- futureGaragenot initiated9connected to FACP
27
Main Library Engineering T.I. - on hold     tbdasssessment- futureLower levelOn hold6
28
Garage - Electric Vehicle ChargingADMpre-liminary assessementMaininprogressGRANT Infrastructuure Grant via ADM
29
Assessment to replace the furnace -climate controls and HVAC systems Park Branch Librarytbdasssessment- futurePark Branchnot initiated2
30
Assessment for Golden Gate Valley Branch Library Historic Repair Remediation'tbdasssessment- futureGolden Gate Branchnot initiated7
31
Assessment for Sunset Branch Library Fence - (includes historical repair remediation)  tbdasssessment- futureSunset Branchnot initiated8
32
Assessment to replace the furnace -climate controls and HVAC systems at Excelsior Branch Librarytbdasssessment- futureExcelsior Branchnot initiated5
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100