| B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | |||||||||||||||||||||||||
2 | |||||||||||||||||||||||||
3 | LIB projects- current & future | ||||||||||||||||||||||||
4 | Project | PM | phase | location | status | cost to date | MOU | priority | Notes | ||||||||||||||||
5 | Mission Renoation | BOA-Andy | construction | existing site | in progress | x | n/a | ||||||||||||||||||
6 | Chinatown Renovation | BPM-Masoud | bid-advertised | existing site | in progress | x | n/a | ||||||||||||||||||
7 | Oceanview New | tbd | pre-liminary/feasibility study | tbd | in progress | n/a | |||||||||||||||||||
8 | Safety Barrier | BOA-Ivan | construction | Main | in progress | x | n/a | Awaiting Pro Glass – glass for remaining areas delivery to site by mid-March; currently, material/glass is on Ocean Freight transport – from Asia. | |||||||||||||||||
9 | Moat | BPM-Lisa | final design | Building perimeter | in progress | x | n/a | LIB needs costs for option 1 (replacement) and option 2 (refurbishment) to make decision- | |||||||||||||||||
10 | Roof | BPM-Lisa | bid award | in progress | x | n/a | pending bid award- Pioneer Construction; then goes to Commission. | ||||||||||||||||||
11 | Fire Alarm | BOA-Andy to be transitioned to BPM-Lisa Z | construction | all floors | in progress | x | n/a | 5 phase project; phase 1- 90% completion | |||||||||||||||||
12 | |||||||||||||||||||||||||
13 | Auxiliary Exhaust Fans | BPM-Lisa | final design | 5th, 6th floors | in progress | $ 445,954.00 | x | provide Lisa with direction- all in one project replacement ($4.8M) or 3 phase replacement ($1.04M, $2.2M, $1.5M) | |||||||||||||||||
14 | Library Security Systems Upgrade Assessment | BOA-Ivan | assessment-cost | Main & Branches | in progress | $ 55,232.00 | x | 1 | assessment completed; now cost estimate phase. | ||||||||||||||||
15 | Main Library PA system Assessment | BOA-Ivan | assessment initiate | all floors | in progress | x | 2 | LIB request to add to Sec. Systems assessment. | |||||||||||||||||
16 | Main Library SFHC - Dehumidification of CS rooms Assessment | BOA-Lourdes BOE-Ricky Choi | assessment-cost | Lower Level, 1st | in progress | $ 45,277.00 | x | 6 | assessment completed; now cost estimate phase. | ||||||||||||||||
17 | Main Library Cooling Tower Replacement Assessment | BOA-Lourdes BOE-Ricky Choi | assessment-cost | 6th floor, roof | in progress | $ 52,576.00 | x | 3 | assessment completed; now cost estimate phase. | ||||||||||||||||
18 | Oceanview HVAC replacment | BOA-Lourdes BOE-Ricky Choi | assessment-cost | Oceanview Branch | inprogress | $ 44,589.00 | 4 | assessment completed; now cost estimate phase. | |||||||||||||||||
19 | Main Library Environmental Controls Assessment | BOA-Lourdes BOE-Ricky Choi | assessment-cost | 6th floor, roof | in progress | $ 54,086.00 | x | 5 | assessment completed; now cost estimate phase. | ||||||||||||||||
20 | priority | ||||||||||||||||||||||||
21 | Assessment-consulting services for Fire Protection Engineering 3 year smoke management system continuous readiness program | tbd | asssessment- future | Main | not initiated | 1 | Have a 2024 cost proposal | ||||||||||||||||||
22 | Assessment for repair and replace of exterior stone walls and emergency exit doors at the Main Library | tbd | asssessment- future | Main | not initiated | 3 | |||||||||||||||||||
23 | Assessment for the replacement of the soft (surface) flooring at the Main Library 6 floors | tbd | asssessment- future | MAIN | not initiated | 4 | priority for Dept. Director; will need to be a phased implemetned due to minimize impact to public servcies | ||||||||||||||||||
24 | Assessment to create a Latino Affinity Center | tbd | asssessment- future | Main | not initiated | 10 | |||||||||||||||||||
25 | Assessment to refresh the Main Children’s Center (MCC) space including replacement of furniture and Burgeon 'Play to Learn' equipment | tbd | asssessment- future | 2nd floor/ mezzanine | not initiated | n/a | internal- FAC-CAP | ||||||||||||||||||
26 | Assessment to replace Emergency Generator that operations Main Library fire system pumps | tbd | asssessment- future | Garage | not initiated | 9 | connected to FACP | ||||||||||||||||||
27 | Main Library Engineering T.I. - on hold | tbd | asssessment- future | Lower level | On hold | 6 | |||||||||||||||||||
28 | Garage - Electric Vehicle Charging | ADM | pre-liminary assessement | Main | inprogress | GRANT Infrastructuure Grant via ADM | |||||||||||||||||||
29 | Assessment to replace the furnace -climate controls and HVAC systems Park Branch Library | tbd | asssessment- future | Park Branch | not initiated | 2 | |||||||||||||||||||
30 | Assessment for Golden Gate Valley Branch Library Historic Repair Remediation' | tbd | asssessment- future | Golden Gate Branch | not initiated | 7 | |||||||||||||||||||
31 | Assessment for Sunset Branch Library Fence - (includes historical repair remediation) | tbd | asssessment- future | Sunset Branch | not initiated | 8 | |||||||||||||||||||
32 | Assessment to replace the furnace -climate controls and HVAC systems at Excelsior Branch Library | tbd | asssessment- future | Excelsior Branch | not initiated | 5 | |||||||||||||||||||
33 | |||||||||||||||||||||||||
34 | |||||||||||||||||||||||||
35 | |||||||||||||||||||||||||
36 | |||||||||||||||||||||||||
37 | |||||||||||||||||||||||||
38 | |||||||||||||||||||||||||
39 | |||||||||||||||||||||||||
40 | |||||||||||||||||||||||||
41 | |||||||||||||||||||||||||
42 | |||||||||||||||||||||||||
43 | |||||||||||||||||||||||||
44 | |||||||||||||||||||||||||
45 | |||||||||||||||||||||||||
46 | |||||||||||||||||||||||||
47 | |||||||||||||||||||||||||
48 | |||||||||||||||||||||||||
49 | |||||||||||||||||||||||||
50 | |||||||||||||||||||||||||
51 | |||||||||||||||||||||||||
52 | |||||||||||||||||||||||||
53 | |||||||||||||||||||||||||
54 | |||||||||||||||||||||||||
55 | |||||||||||||||||||||||||
56 | |||||||||||||||||||||||||
57 | |||||||||||||||||||||||||
58 | |||||||||||||||||||||||||
59 | |||||||||||||||||||||||||
60 | |||||||||||||||||||||||||
61 | |||||||||||||||||||||||||
62 | |||||||||||||||||||||||||
63 | |||||||||||||||||||||||||
64 | |||||||||||||||||||||||||
65 | |||||||||||||||||||||||||
66 | |||||||||||||||||||||||||
67 | |||||||||||||||||||||||||
68 | |||||||||||||||||||||||||
69 | |||||||||||||||||||||||||
70 | |||||||||||||||||||||||||
71 | |||||||||||||||||||||||||
72 | |||||||||||||||||||||||||
73 | |||||||||||||||||||||||||
74 | |||||||||||||||||||||||||
75 | |||||||||||||||||||||||||
76 | |||||||||||||||||||||||||
77 | |||||||||||||||||||||||||
78 | |||||||||||||||||||||||||
79 | |||||||||||||||||||||||||
80 | |||||||||||||||||||||||||
81 | |||||||||||||||||||||||||
82 | |||||||||||||||||||||||||
83 | |||||||||||||||||||||||||
84 | |||||||||||||||||||||||||
85 | |||||||||||||||||||||||||
86 | |||||||||||||||||||||||||
87 | |||||||||||||||||||||||||
88 | |||||||||||||||||||||||||
89 | |||||||||||||||||||||||||
90 | |||||||||||||||||||||||||
91 | |||||||||||||||||||||||||
92 | |||||||||||||||||||||||||
93 | |||||||||||||||||||||||||
94 | |||||||||||||||||||||||||
95 | |||||||||||||||||||||||||
96 | |||||||||||||||||||||||||
97 | |||||||||||||||||||||||||
98 | |||||||||||||||||||||||||
99 | |||||||||||||||||||||||||
100 | |||||||||||||||||||||||||