A | B | C | D | F | G | H | I | J | K | L | M | N | R | S | T | U | V | W | X | Y | Z | AA | ||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Total | # | Trigger | TARGET | BEAM | TRIGGER | ECAL CLUSTER | ECAL | Ecal | SVT | ECAL Environment | NOTES | ||||||||||||
2 | Number | Date | Time | Events | Files | Rate | Current | X mm | Y mm | CONFIG | Thresh (MeV) | FADC MHz | FADC MHz | Y-Position | Offset | Temp | LV Current | |||||||
3 | Start | End | (M) | (kHz) | 2C24A | 2H02 | 2H02 | Seed | Top | Bottom | (mm) | Phase | Time (ns) | (C) | (A) | |||||||||
4 | 81 | 5/3/2019 | 8.0 | LED | Red LED | |||||||||||||||||||
5 | 82 | 5/3/2019 | 8.0 | LED | Blue LED | |||||||||||||||||||
6 | 84 | 0.1 | Trigger from the Hodo PMTs, FADC250_W_OFFSET = 2820, HV on both PMTs is 910 V | |||||||||||||||||||||
7 | 88 | 5/5/2019 | HPS/ECAL/cosmic.trg | |||||||||||||||||||||
8 | 89 | 5/7/2019 | 11:07 | 11:15 | 0.003 | 8.0 | hps_Mode3_test.trg | A short wun with Mode3/ Number of events is just 2920, not 2920M | ||||||||||||||||
9 | 9001 | 5/7/2019 | 14:55 | 17:25 | 0.098 | 8.0 | hps_Mode7_test.trg | A short wun with Mode7/ Number of events is just 98232, not 98232M | ||||||||||||||||
10 | 9004 | 5/8/2019 | 11:00 | Red LED | ||||||||||||||||||||
11 | 9005 | 5/8/2019 | 11:00 | Blue LED | ||||||||||||||||||||
12 | 9007 | 5/8/2019 | 14:00 | 0.0 | HPS/ECAL/cosmic.trg | |||||||||||||||||||
13 | 9008 | 5/8/2019 | 15:00 | 10:00 | 0.192 | 0.0 | HPS/ECAL/cosmic.trg | raise scintillator TET to 70, DAQ crashed noticed following morning | ||||||||||||||||
14 | 9011 | 5/9/2019 | 11:43 | 16:33 | 0.050 | 0.0 | HPS/ECAL/cosmic.trg | |||||||||||||||||
15 | 9012 | 5/9/2019 | 16:55 | 9:45 | 0.172 | 0.0 | HPS/ECAL/cosmic.trg | |||||||||||||||||
16 | 9013 | 5/10/2019 | 10:01 | 0.0 | HPS/ECAL/cosmic.trg | |||||||||||||||||||
17 | 9014 | HPS/ECAL/cosmic.trg | ||||||||||||||||||||||
18 | 9015 | 5/10/2019 | 11:17 | 14:10 | 0.030 | HPS/ECAL/cosmic.trg | Fixed TET_IGNORE_MASK on slot 20 | |||||||||||||||||
19 | 9020 | 5/10/2019 | 17:26 | 9:45 | 0.650 | HPS/ECAL/cosmic.trg | ||||||||||||||||||
20 | 9025 | 5/13/2019 | 16:51 | 10:10 | 0.175 | HPS/ECAL/cosmic.trg | ||||||||||||||||||
21 | 9027 | 5/14/2019 | 15:31 | 10:26 | 0.430 | HPS/ECAL/cosmic.trg | ||||||||||||||||||
22 | 9033 | 5/17/2019 | 15:30 | HPS/ECAL/cosmic.trg | First cosmic run after fixing LT7-LT10 HV swap. LT7 remains disconnected, pending calorimeter opening. | |||||||||||||||||||
23 | 9034 | 5/20/2019 | 13:58 | HPS/ECAL/cosmic.trg | ||||||||||||||||||||
24 | 9039 | 5/21/2019 | 17:05 | 11:26 | 0.118 | HPS/ECAL/cosmic.trg | ||||||||||||||||||
25 | 9041 | 5/22/2019 | 16:33 | 14:45 | 0.181 | HPS/ECAL/cosmic.trg | First run after cable replacement on x/y=-7/+4 | |||||||||||||||||
26 | 9044 | 5/23/2019 | 16:54 | HPS/ECAL/cosmic.trg | First run after HV LT7 repair (preamp reseating, affected x=+12/+13 and y>0). | |||||||||||||||||||
27 | 9046 | 5/24/2019 | 17:30 | HPS/ECAL/cosmic.trg | First run after x/y=+7/+3 fix. Remaining problem is x/y=+4/-2 (broken solder joint on multipin connector at patch panel) | |||||||||||||||||||
28 | 9048 | 5/24/2019 | 21:37 | HPS/ECAL/cosmic.trg | ||||||||||||||||||||
29 | 9053 | 5/27/2019 | 13:40 | 1.0 | HPS/ECAL/led.trg | Red LED (oops, roc-lock mode) | ||||||||||||||||||
30 | 9054 | 5/27/2019 | 13:50 | 1.0 | HPS/ECAL/led.trg | Blue LED (oops, roc-lock mode) | ||||||||||||||||||
31 | 9056 | 5/27/2019 | 14:10 | 8.0 | HPS/ECAL/led.trg | Red LED | ||||||||||||||||||
32 | 9057 | 5/27/2019 | 14:25 | 8.0 | HPS/ECAL/led.trg | Blue LED | ||||||||||||||||||
33 | 9058 | 5/27/2019 | 14:40 | 0.0 | HPS/ECAL/cosmic.trg | DAQ crashed | ||||||||||||||||||
34 | 9062 | 5/27/2019 | 16:50 | 8.0 | HPS/ECAL/led.trg | Red LED - First run after x/y=+4/-2 signal cable fix (on patch panel end). | ||||||||||||||||||
35 | 9063 | 5/27/2019 | 17:05 | 8.0 | HPS/ECAL/led.trg | Blue LED | ||||||||||||||||||
36 | 9064 | 5/27/2019 | 17:15 | 0.0 | HPS/ECAL/cosmic.trg | First cosmic run after x/y=+4/-2 signal cable fix (on patch panel end). | ||||||||||||||||||
37 | 9108 | 5/31/2019 | 19:10 | 0.0 | HPS/ECAL/cosmic.trg | HV LT7 off for the weekend (x=+12/+13 on top) - 4 HV channels on bottom tripped during the run: 1/4/11/13 | ||||||||||||||||||
38 | 9109 | 6/1/2019 | 14:50 | 10:07 | 0.659 | 0.0 | HPS/ECAL/cosmic.trg | HV LT7 still off | ||||||||||||||||
39 | 9125 | 6/5/2019 | 15:24 | 9:14 | 0.174 | 0.0 | HPS/ECAL/cosmic.trg | |||||||||||||||||
40 | 9172 | 6/7/2019 | 17:08 | 10:48 | 0.0 | HPS/ECAL/cosmic.trg | HV LT7 restored, but tripped 3.5 hours into the run. EB35 was also crashed on EndRun. | |||||||||||||||||
41 | 9173 | 6/8/2019 | 16:00 | 11:53 | 0.0 | HPS/ECAL/cosmic.trg | HV LT7 restored by replacing preamp N039 in x/y=+13/+5. NO TRIPS! | |||||||||||||||||
42 | 9175 | 6/9/2019 | 18:10 | 9:35 | 0.150 | 0.0 | HPS/ECAL/cosmic.trg | First cosmic run after x/y=+4/-3 signal cable fix (on calorimeter end). NO TRIPS! | ||||||||||||||||
43 | 9179 | 6/10/2019 | 19:02 | 0.0 | HPS/ECAL/cosmic.trg | |||||||||||||||||||
44 | 9184 | 6/12/2019 | 11:30 | 0.0 | HPS/ECAL/cosmic.trg | |||||||||||||||||||
45 | 9187 | 6/13/2019 | 20:40 | 8.0 | HPS/ECAL/led.trg | Red LED | ||||||||||||||||||
46 | 9188 | 6/13/2019 | 20:50 | 8.0 | HPS/ECAL/led.trg | Blue LED | ||||||||||||||||||
47 | 9189 | 6/13/2019 | 21:10 | 0.0 | HPS/ECAL/cosmic.trg | |||||||||||||||||||
48 | 9190 | 6/14/2019 | 10:32 | 8.0 | HPS/ECAL/led.trg | Red LED | ||||||||||||||||||
49 | 9191 | 6/14/2019 | 10:49 | 8.0 | HPS/ECAL/led.trg | Blue LED | ||||||||||||||||||
50 | 9192 | 6/14/2019 | 11:00 | 8.0 | HPS/ECAL/cosmic.trg | |||||||||||||||||||
51 | 9207 | 8.0 | HPS/ECAL/led.trg | Red LED (JOUT3 on TOP DISCONNECTED!!!) | ||||||||||||||||||||
52 | 9208 | 6/15/2019 | 12:28 | 8.0 | HPS/ECAL/led.trg | Red LED | ||||||||||||||||||
53 | 9209 | 6/15/2019 | 12:40 | 8.0 | HPS/ECAL/led.trg | Blue LED | ||||||||||||||||||
54 | 9293 | 6/20/2019 | 2:40 | 3:00 | 11.0 | HPS/Run2019/hps_v3.cnf | I=50 nA, target=8 um DAQ crashed at 3:00 AM | |||||||||||||||||
55 | 9295 | 6/20/2019 | 3:35 | 3:45 | 6.660 | 17.0 | HPS/Run2019/hps_v3.cnf | target=8 um LT = 94% | ||||||||||||||||
56 | 9296 | 6/20/2019 | 3:45 | 3:53 | 6.800 | 21.0 | HPS/Run2019/hps_v3.cnf | target=8 um I =100 nA, LT=96% | ||||||||||||||||
57 | 9297 | 6/20/2019 | 4:15 | HPS/Run2019/hps_v3.cnf | target=8 um I=125 nA . DAQ crashed immediately, hodoscope rates too high | |||||||||||||||||||
58 | 9302 | 6/20/2019 | 4:45 | 4.5 | 6.500 | 27.7 | HPS/Run2019/hps_v3.cnf | target=8 um I=125 nA thresholds on hodoscope raised to 40 (from 20) LT =93% | ||||||||||||||||
59 | 9303 | 6/20/2019 | 4:55 | 1.100 | HPS/Run2019/hps_v3.cnf | target=8 um Crashed at 1.1 M eventes, LT=62% | ||||||||||||||||||
60 | 9305 | 6/20/2019 | 5:22 | 5:35 | 6.500 | 14.0 | HPS/Run2019/hps_v3.cnf | target=8 um I=150 nA, LT=40% | ||||||||||||||||
61 | 9306 | 6/20/2019 | 5:38 | 5:47 | 6.000 | 15.0 | HPS/Run2019/hps_v3.cnf | target=8 um I=175 nA, LT =24% | ||||||||||||||||
62 | 9308 | 6/20/2019 | 6:51 | 6:05 | 6.000 | 15.0 | HPS/Run2019/hps_v3.cnf | target=8 um I=200 nA, LT =31% | ||||||||||||||||
63 | 9310 | 6/20/2019 | 6:14 | 6:22 | 4.000 | 15.0 | _HPS/Run2019/hps_v3_random.cnf | target=8 um I=225 nA, LT =29% hodo bottom V down to 840 V | ||||||||||||||||
64 | 9311 | 6/20/2019 | 6:25 | 7:10 | 5.6 | _HPS/Run2019/hps_v3_random.cnf | target=8 um Random trigger, I = 175 nA LT=98.5 | |||||||||||||||||
65 | 9312 | 6/20/2019 | 7:40 | 8:00 | 5.6 | HPS/Run2019/hps_v3 | target=8 um Random trigger, I = 175 nA LT=98.5 | |||||||||||||||||
66 | 9317 | 6/20/2019 | 9:01 | 10:13 | 81.192 | 18.9 | HPS/Run2019/hps_v3_hodoscope.trg | Hodoscope Trigger Data prescale 150 | ||||||||||||||||
67 | 9318 | 6/20/2019 | 11:49 | 11:55 | 5.096 | 14.8 | HPS/Run2019/ecal_ped/ecal_ped_mode7.trg | Ecal Pedestal Run at 100 nA | ||||||||||||||||
68 | 9319 | 6/20/2019 | 12:03 | 12:08 | 5.904 | 20.8 | HPS/Run2019/ecal_ped/ecal_ped_mode7.trg | Ecal Pedestal Run at 200 nA | ||||||||||||||||
69 | 9320 | 6/20/2019 | 12:52 | 12:58 | 8.914 | 25.8 | HPS/Run2019/ecal_ped/ecal_ped_mode7.trg | Ecal Pedestal Run at 300 nA, Nathan changed prescales | ||||||||||||||||
70 | 9321 | 6/20/2019 | 13:02 | 13:18 | 44.518 | 49.0 | HPS/Run2019/ecal_ped/ecal_ped_mode7.trg | Ecal Pedestal Run at 300 nA, mostly FEE | ||||||||||||||||
71 | 9322 | 6/20/2019 | 13:20 | 13:25 | HPS/Run2019/ecal_ped/ecal_ped_mode1.trg | Ecal Pedestal Run at 300 nA, mostly FEE, DAQ crash | ||||||||||||||||||
72 | 9326 | 6/20/2019 | 13:51 | 14:07 | 27.300 | 28.7 | HPS/Run2019/ecal_ped/ecal_ped_mode1.trg | Ecal Pedestal Run at 300 nA, mostly FEE | ||||||||||||||||
73 | 9327 | 6/20/2019 | 14:33 | 14:44 | 0.006 | 0.0 | HPS/Run2019/TEST/svt_baseline.try | Test SVT thresshold run | ||||||||||||||||
74 | 9330 | 6/20/2019 | 15:48 | 15:59 | 14.600 | 22.9 | HPS/Run2019/hps_v4.cnf | New HV for hodoscope. Bot 820 V, Top 740 V, I = 200 nA | ||||||||||||||||
75 | 9331 | 6/20/2019 | 4:06 | 4:17 | 15.000 | 25.0 | HPS/Run2019/hps_v4.cnf | Hodoscope test run I=200 nA. Bot 800 V, Top 760 V | ||||||||||||||||
76 | 9332 | 6/20/2019 | 4:18 | 4:28 | 15.000 | 26.2 | HPS/Run2019/hps_v4.cnf | Hodoscope test run I=200 nA Hodosocpe V changed. Bot 780 V, Top 730 V | ||||||||||||||||
77 | 9333 | 6/20/2019 | 20:39 | 21:57 | 15.000 | 3.7 | HPS/Run2019/hps_v3_random.cnf | Random trigger I =150 nA target W 8 um | ||||||||||||||||
78 | 9335 | 6/20/2019 | 22:15 | 2:15 | 63.240 | 5.0 | HPS/Run2019/hps_v3_random.cnf | Random trigger I =150 nA target W 8 um | ||||||||||||||||
79 | 9336 | 6/21/2019 | 2:17 | 4:24 | 35.800 | 4.6 | HPS/Run2019/hps_v3_random.cnf | Random trigger I =150 nA target W 8 um | ||||||||||||||||
80 | 9339 | 6/21/2019 | 5:11 | 7:21 | 155.800 | 22.0 | HPS/Run2019/hps_v4.cnf | I=150 nA, 8 um W target, 2.82 mm collimator | ||||||||||||||||
81 | 9340 | 6/21/2019 | 7:23 | 7:56 | 42.400 | 21.6 | HPS/Run2019/hps_v4.cnf | I=150 nA, 8 um W target, 2.82 mm collimator | ||||||||||||||||
82 | 9343 | 6/21/2019 | 8:43 | 9:33 | 12.900 | 4.8 | HPS/Run2019/hps_v3_random.cnf | 150 nA, 8 um W, 2.82 collimator | ||||||||||||||||
83 | 9344 | 6/21/2019 | 9:37 | 9:38 | 0.002 | 0.1 | HPS/Run2019/TEST/svt_baseline.cnf | SVT Baseline Run for thersholds | ||||||||||||||||
84 | 9345 | 6/21/2019 | 11:13 | 14:50 | 46.700 | 4.9 | HPS/Run2019/hps_v3_random.cnf | 150 nA, 8 um W, 2.82 mm collimator, rand triggers - END Run FAILED at 14:45 - RESET 14:50 | ||||||||||||||||
85 | 9351 | 6/21/2019 | 21:45 | 21:51 | 0.640 | 2.1 | HPS/Run2019/hps_v4.cnf | 30 nA, 4 um W 2.82 mm collimator Hodo Ecal ON | ||||||||||||||||
86 | 9352 | 6/21/2019 | 22:10 | 22:55 | 2.700 | 2.0 | HPS/Run2019/hps_v4.cnf | 30 nA, 4 um W 2.82 mm collimator Hodo Ecal SVT ON - DAQ crashed | ||||||||||||||||
87 | 9355 | 6/21/2019 | 23:00 | 23:15 | 1.600 | 2.0 | HPS/Run2019/hps_v4.cnf | 30 nA, 4 um W 2.82 mm collimator Hodo Ecal NO SVT | ||||||||||||||||
88 | 9366 | 6/22/2019 | 12:47:00 AM | 1:01 | 1.000 | HPS/Run2019/hps_v3_pair2_2gamma.cnf | 30 nA, 4 um W 2.82 mm collimator Hodo Ecal NO SVT - JUNK Run | |||||||||||||||||
89 | 9367 | 6/22/2019 | 0:47 | 3:01 | 145.000 | 21.6 | HPS/Run2019/hps_v3_mult0_2gamma.cnf | 150 nA, 4 um W 2.82 mm collimator Hodo Ecal NO SVT | ||||||||||||||||
90 | 9368 | 6/22/2019 | 3:03:00 AM | 5:07 | 158.000 | 22.7 | HPS/Run2019/hps_v3_mult0_2gamma.cnf | 150 nA, 4 um W 2.82 mm collimator Hodo Ecal NO SVT | ||||||||||||||||
91 | 9369 | 6/22/2019 | 5:09 | 5:35 | 8.100 | 21.0 | HPS/Run2019/hps_v3_mult0_2gamma.cnf | 150 nA, 4 um W 2.82 mm collimator Hodo Ecal NO SVT - beam lost due to vacuum problem | ||||||||||||||||
92 | 9370 | 6/22/2019 | 5:39 | 7:17 | 116.800 | 20.8 | HPS/Run2019/hps_v3_mult0_2gamma.cnf | 150 nA, 4 um W 2.82 mm collimator Hodo Ecal NO SVT | ||||||||||||||||
93 | 9371 | 6/22/2019 | 7:22 | 7:40 | HPS/Run2019/hps_v3_FEE.cnf | 150 nA, 4 um W 2.82 mm collimator Hodo Ecal NO SVT | ||||||||||||||||||
94 | 9372 | 6/22/2019 | 7:45 | 10:39 | 80.000 | 8.4 | HPS/Run2019/hps_v3_pair2_2gamma.cnf | 150 nA, 4 um W 2.82 mm collimator Hodo Ecal NO SVT | ||||||||||||||||
95 | 9373 | 6/22/2019 | 10:45 | 13:01 | 222.800 | 26.5 | HPS/Run2019/hps_v3_random_30kHz | 150 nA, 4 um W, 2.82 collimator Random Triggers at higher rate | ||||||||||||||||
96 | 9375 | 6/22/2019 | 13:09 | 13:10 | 2,233.000 | 80.0 | HPS/Run2019/TEST/svt_baseline.cnf | SVT Baseline Run for thersholds | ||||||||||||||||
97 | 9376 | 6/22/2019 | 13:20 | 14:55 | 155.400 | 26.7 | HPS/Run2019/hps_v3_random_30kHz | 150 nA, 4 um W, 2.82 collimator Random Triggers at higher rate | ||||||||||||||||
98 | 9384 | 6/22/2019 | 19:25 | 23:45 | 37.000 | 4.5 | HPS/Run2019/hps_v4.cnf | 60 nA, SVT on and at 3mm, Latency at 144 and Delay 0 | ||||||||||||||||
99 | 9385 | 6/22/2019 | 23:53 | 3:53 | 391.000 | 27.0 | HPS/Run2019/hps_v3_random_30kHz | 150 nA, 8 um W, 2.82 collimator no SVT - Random Trigger | ||||||||||||||||
100 | 9386 | 6/23/2019 | 3:54 | 7:15 | 327.000 | 27.3 | HPS/Run2019/hps_v3_random_30kHz | 150 nA, 8 um W, 2.82 collimator no SVT - Random Trigger |