815/3/20198.0LEDRed LED
5
825/3/20198.0LEDBlue LED
6
840.1Trigger from the Hodo PMTs, FADC250_W_OFFSET = 2820, HV on both PMTs is 910 V
7
885/5/2019HPS/ECAL/cosmic.trg
8
895/7/201911:0711:150.0038.0hps_Mode3_test.trgA short wun with Mode3/ Number of events is just 2920, not 2920M
9
90015/7/201914:5517:250.0988.0hps_Mode7_test.trgA short wun with Mode7/ Number of events is just 98232, not 98232M
10
90045/8/201911:00Red LED
11
90055/8/201911:00Blue LED
12
90075/8/201914:000.0HPS/ECAL/cosmic.trg
13
90085/8/201915:0010:000.1920.0HPS/ECAL/cosmic.trgraise scintillator TET to 70, DAQ crashed noticed following morning
14
90115/9/201911:4316:330.0500.0HPS/ECAL/cosmic.trg
15
90125/9/201916:559:450.1720.0HPS/ECAL/cosmic.trg
16
90135/10/201910:010.0HPS/ECAL/cosmic.trg
17
9014HPS/ECAL/cosmic.trg
18
90155/10/201911:1714:100.030HPS/ECAL/cosmic.trgFixed TET_IGNORE_MASK on slot 20
19
90205/10/201917:269:450.650HPS/ECAL/cosmic.trg
20
90255/13/201916:5110:100.175HPS/ECAL/cosmic.trg
21
90275/14/201915:3110:260.430HPS/ECAL/cosmic.trg
22
90335/17/201915:30HPS/ECAL/cosmic.trgFirst cosmic run after fixing LT7-LT10 HV swap. LT7 remains disconnected, pending calorimeter opening.
23
90345/20/201913:58HPS/ECAL/cosmic.trg
24
90395/21/201917:0511:260.118HPS/ECAL/cosmic.trg
25
90415/22/201916:3314:450.181HPS/ECAL/cosmic.trgFirst run after cable replacement on x/y=-7/+4
26
90445/23/201916:54HPS/ECAL/cosmic.trgFirst run after HV LT7 repair (preamp reseating, affected x=+12/+13 and y>0).
27
90465/24/201917:30HPS/ECAL/cosmic.trg
First run after x/y=+7/+3 fix. Remaining problem is x/y=+4/-2 (broken solder joint on multipin connector at patch panel)
28
90485/24/201921:37HPS/ECAL/cosmic.trg
29
90535/27/201913:401.0HPS/ECAL/led.trgRed LED (oops, roc-lock mode)
30
90545/27/201913:501.0HPS/ECAL/led.trgBlue LED (oops, roc-lock mode)
31
90565/27/201914:108.0HPS/ECAL/led.trgRed LED
32
90575/27/201914:258.0HPS/ECAL/led.trgBlue LED
33
90585/27/201914:400.0HPS/ECAL/cosmic.trgDAQ crashed
34
90625/27/201916:508.0HPS/ECAL/led.trgRed LED - First run after x/y=+4/-2 signal cable fix (on patch panel end).
35
90635/27/201917:058.0HPS/ECAL/led.trgBlue LED
36
90645/27/201917:150.0HPS/ECAL/cosmic.trgFirst cosmic run after x/y=+4/-2 signal cable fix (on patch panel end).
37
91085/31/201919:100.0HPS/ECAL/cosmic.trgHV LT7 off for the weekend (x=+12/+13 on top) - 4 HV channels on bottom tripped during the run: 1/4/11/13
38
91096/1/201914:5010:070.6590.0HPS/ECAL/cosmic.trgHV LT7 still off
39
91256/5/201915:249:140.1740.0HPS/ECAL/cosmic.trg
40
91726/7/201917:0810:480.0HPS/ECAL/cosmic.trgHV LT7 restored, but tripped 3.5 hours into the run. EB35 was also crashed on EndRun.
41
91736/8/201916:0011:530.0HPS/ECAL/cosmic.trgHV LT7 restored by replacing preamp N039 in x/y=+13/+5. NO TRIPS!
42
91756/9/201918:109:350.1500.0HPS/ECAL/cosmic.trgFirst cosmic run after x/y=+4/-3 signal cable fix (on calorimeter end). NO TRIPS!
43
91796/10/201919:020.0HPS/ECAL/cosmic.trg
44
91846/12/201911:300.0HPS/ECAL/cosmic.trg
45
91876/13/201920:408.0HPS/ECAL/led.trgRed LED
46
91886/13/201920:508.0HPS/ECAL/led.trgBlue LED
47
91896/13/201921:100.0HPS/ECAL/cosmic.trg
48
91906/14/201910:328.0HPS/ECAL/led.trgRed LED
49
91916/14/201910:498.0HPS/ECAL/led.trgBlue LED
50
91926/14/201911:008.0HPS/ECAL/cosmic.trg
51
92078.0HPS/ECAL/led.trgRed LED (JOUT3 on TOP DISCONNECTED!!!)
52
92086/15/201912:288.0HPS/ECAL/led.trgRed LED
53
92096/15/201912:408.0HPS/ECAL/led.trgBlue LED
54
92936/20/20192:403:0011.0HPS/Run2019/hps_v3.cnfI=50 nA, target=8 um DAQ crashed at 3:00 AM
55
92956/20/20193:353:456.66017.0HPS/Run2019/hps_v3.cnf target=8 um LT = 94%
56
92966/20/20193:453:536.80021.0HPS/Run2019/hps_v3.cnf target=8 um I =100 nA, LT=96%
57
92976/20/20194:15HPS/Run2019/hps_v3.cnf target=8 um I=125 nA . DAQ crashed immediately, hodoscope rates too high
58
93026/20/20194:454.56.50027.7HPS/Run2019/hps_v3.cnf target=8 um I=125 nA thresholds on hodoscope raised to 40 (from 20) LT =93%
59
93036/20/20194:551.100HPS/Run2019/hps_v3.cnf target=8 um Crashed at 1.1 M eventes, LT=62%
60
93056/20/20195:225:356.50014.0HPS/Run2019/hps_v3.cnf target=8 um I=150 nA, LT=40%
61
93066/20/20195:385:476.00015.0HPS/Run2019/hps_v3.cnf target=8 um I=175 nA, LT =24%
62
93086/20/20196:516:056.00015.0HPS/Run2019/hps_v3.cnf target=8 um I=200 nA, LT =31%
63
93106/20/20196:146:224.00015.0_HPS/Run2019/hps_v3_random.cnf target=8 um I=225 nA, LT =29% hodo bottom V down to 840 V
64
93116/20/20196:257:105.6_HPS/Run2019/hps_v3_random.cnf target=8 um Random trigger, I = 175 nA LT=98.5
65
93126/20/20197:408:005.6HPS/Run2019/hps_v3 target=8 um Random trigger, I = 175 nA LT=98.5
66
93176/20/20199:0110:1381.19218.9HPS/Run2019/hps_v3_hodoscope.trgHodoscope Trigger Data prescale 150
67
93186/20/201911:4911:555.09614.8
HPS/Run2019/ecal_ped/ecal_ped_mode7.trg
Ecal Pedestal Run at 100 nA
68
93196/20/201912:0312:085.90420.8
HPS/Run2019/ecal_ped/ecal_ped_mode7.trg
Ecal Pedestal Run at 200 nA
69
93206/20/201912:5212:588.91425.8
HPS/Run2019/ecal_ped/ecal_ped_mode7.trg
Ecal Pedestal Run at 300 nA, Nathan changed prescales
70
93216/20/201913:0213:1844.51849.0
HPS/Run2019/ecal_ped/ecal_ped_mode7.trg
Ecal Pedestal Run at 300 nA, mostly FEE
71
93226/20/201913:2013:25
HPS/Run2019/ecal_ped/ecal_ped_mode1.trg
Ecal Pedestal Run at 300 nA, mostly FEE, DAQ crash
72
93266/20/201913:5114:0727.30028.7
HPS/Run2019/ecal_ped/ecal_ped_mode1.trg
Ecal Pedestal Run at 300 nA, mostly FEE
73
93276/20/201914:3314:440.0060.0HPS/Run2019/TEST/svt_baseline.tryTest SVT thresshold run
74
93306/20/201915:4815:5914.60022.9HPS/Run2019/hps_v4.cnfNew HV for hodoscope. Bot 820 V, Top 740 V, I = 200 nA
75
93316/20/20194:064:1715.00025.0HPS/Run2019/hps_v4.cnfHodoscope test run I=200 nA. Bot 800 V, Top 760 V
76
93326/20/20194:184:2815.00026.2HPS/Run2019/hps_v4.cnfHodoscope test run I=200 nA Hodosocpe V changed. Bot 780 V, Top 730 V
77
93336/20/201920:3921:5715.0003.7HPS/Run2019/hps_v3_random.cnfRandom trigger I =150 nA target W 8 um
78
93356/20/201922:152:1563.2405.0HPS/Run2019/hps_v3_random.cnfRandom trigger I =150 nA target W 8 um
79
93366/21/20192:174:2435.8004.6HPS/Run2019/hps_v3_random.cnfRandom trigger I =150 nA target W 8 um
80
93396/21/20195:117:21155.80022.0HPS/Run2019/hps_v4.cnfI=150 nA, 8 um W target, 2.82 mm collimator
81
93406/21/20197:237:5642.40021.6HPS/Run2019/hps_v4.cnfI=150 nA, 8 um W target, 2.82 mm collimator
82
93436/21/20198:439:3312.9004.8HPS/Run2019/hps_v3_random.cnf150 nA, 8 um W, 2.82 collimator
83
93446/21/20199:379:380.0020.1HPS/Run2019/TEST/svt_baseline.cnfSVT Baseline Run for thersholds
84
93456/21/201911:1314:5046.7004.9HPS/Run2019/hps_v3_random.cnf150 nA, 8 um W, 2.82 mm collimator, rand triggers - END Run FAILED at 14:45 - RESET 14:50
85
93516/21/201921:4521:510.6402.1HPS/Run2019/hps_v4.cnf30 nA, 4 um W 2.82 mm collimator Hodo Ecal ON
86
93526/21/201922:1022:552.7002.0HPS/Run2019/hps_v4.cnf30 nA, 4 um W 2.82 mm collimator Hodo Ecal SVT ON - DAQ crashed
87
93556/21/201923:0023:151.6002.0HPS/Run2019/hps_v4.cnf30 nA, 4 um W 2.82 mm collimator Hodo Ecal NO SVT
88
93666/22/201912:47:00 AM1:011.000HPS/Run2019/hps_v3_pair2_2gamma.cnf30 nA, 4 um W 2.82 mm collimator Hodo Ecal NO SVT - JUNK Run
89
93676/22/20190:473:01145.00021.6HPS/Run2019/hps_v3_mult0_2gamma.cnf150 nA, 4 um W 2.82 mm collimator Hodo Ecal NO SVT
90
93686/22/20193:03:00 AM5:07158.00022.7HPS/Run2019/hps_v3_mult0_2gamma.cnf150 nA, 4 um W 2.82 mm collimator Hodo Ecal NO SVT
91
93696/22/20195:095:358.10021.0HPS/Run2019/hps_v3_mult0_2gamma.cnf150 nA, 4 um W 2.82 mm collimator Hodo Ecal NO SVT - beam lost due to vacuum problem
92
93706/22/20195:397:17116.80020.8HPS/Run2019/hps_v3_mult0_2gamma.cnf150 nA, 4 um W 2.82 mm collimator Hodo Ecal NO SVT
93
93716/22/20197:227:40HPS/Run2019/hps_v3_FEE.cnf150 nA, 4 um W 2.82 mm collimator Hodo Ecal NO SVT
94
93726/22/20197:4510:3980.0008.4HPS/Run2019/hps_v3_pair2_2gamma.cnf150 nA, 4 um W 2.82 mm collimator Hodo Ecal NO SVT
95
93736/22/201910:4513:01222.80026.5HPS/Run2019/hps_v3_random_30kHz150 nA, 4 um W, 2.82 collimator Random Triggers at higher rate
96
93756/22/201913:0913:102,233.00080.0HPS/Run2019/TEST/svt_baseline.cnfSVT Baseline Run for thersholds
97
93766/22/201913:2014:55155.40026.7HPS/Run2019/hps_v3_random_30kHz150 nA, 4 um W, 2.82 collimator Random Triggers at higher rate
98
93846/22/201919:2523:4537.0004.5HPS/Run2019/hps_v4.cnf60 nA, SVT on and at 3mm, Latency at 144 and Delay 0
99
93856/22/201923:533:53391.00027.0HPS/Run2019/hps_v3_random_30kHz150 nA, 8 um W, 2.82 collimator no SVT - Random Trigger
100
93866/23/20193:547:15327.00027.3HPS/Run2019/hps_v3_random_30kHz150 nA, 8 um W, 2.82 collimator no SVT - Random Trigger