Facilities Study - cost analysis
 Share
The version of the browser you are using is no longer supported. Please upgrade to a supported browser.Dismiss

View only
 
ABCDEFGHIJKLMNOPQRSTUVWXYZAAAB
1
City Zone1-3 Year Cost Projection1-3 Year Cost w/ Roof Replacement4-7 Year Cost Projection4-7 Year Cost w/ Roof Replacement7-10 Year Cost Projection7-10 Year Cost w/ Roof Replacement
2
CENTRAL
3
HVAC PROJECTS
4
1234 Ton Chiller Replacement$225,000.00$225,000.00
5
2Water system not balanced$15,000.00$15,000.00
6
3
MDF needs separate A/C unit
$25,000.00$25,000.00
7
8
CARPENTRY PROJECTS
9
1Repair soft spots in third level flooring$15,000.00$15,000.00
10
11
ELECTRICAL PROJECTS
12
1Convert lighting to LED$95,000.00$95,000.00
13
14
EAST ALB
15
GENERAL PROJECTS
16
1
Replace all Student furniture
$250,000.00$250,000.00
17
18
HVAC PROJECTS
19
1Both DX units replaced $150,000.00$150,000.00
20
2Either Air Handlers or Evaporators replaced$125,000.00$125,000.00
21
22
ROOF REPAIR REPLACEMENTS
23
1Foam Roof #1 repaired/recoated 2021$50,000.00
24
2Replace Roof #1 with 60 mil TPO$550,000.00
25
3Foam Roof #2 repaired/recoated 2021$13,000.00
26
4Replace Roof #2 with 60 mil TPO$55,000.00
27
28
ELECTRICAL PROJECTS
29
1Convert lighting to LED$45,000.00$45,000.00
30
2
Upgrade Intercom System
$10,000.00$10,000.00
31
32
ALB MIDDLE
33
GENERAL PROJECTS
34
1
Replace all Student furniture
$350,000.00$350,000.00
35
36
HVAC PROJECTS
37
1Replace 250 ton chiller$250,000.00$250,000.00
38
2Clean/Inspect Unit Ventilators$65,000.00$65,000.00
39
3
MDF needs seperate A/C unit
$15,000.00$15,000.00
40
41
ELECTRICAL PROJECTS
42
1
Replace T8 with LED
$55,000.00$55,000.00
43
2
Replace Ethernet wall receptacles
$20,000.00$20,000.00
44
ALB HIGH
45
GENERAL PROJECTS
46
1Renovate Auditorium$225,000.00$225,000.00
47
2Repave parking lot$65,000.00$65,000.00
48
3Remove asbestos ceiling throughout school$250,000.00$250,000.00
49
4Track resurfaced/ new rubber$45,000.00$45,000.00
50
5Renovate bilding interior$500,000.00$500,000.00
51
6
Renovate Gang Restrooms
$75,000.00$75,000.00
52
7Replace roll up fence at cafeteria$15,000.00$15,000.00
53
8
Old building needs new Ethernet wiring and panels
$80,000.00$80,000.00
54
9
CTE labs need new ethernet wiring and panels
$30,000.00$30,000.00
55
10
Replace all student furniture
$300,000.00$300,000.00
56
57
HVAC PROJECTS
58
1Replace Air Handler unit in Auditorium$40,000.00$40,000.00
59
2Replace Unit ventilators$300,000.00$300,000.00
60
3Upgrade room temperature control$70,000.00$70,000.00
61
4Air Handler units in locker room$55,000.00$55,000.00
62
5Several pkg units in/around school$40,000.00$40,000.00
63
6
MDF needs separate A/C unit
$15,000.00$15,000.00
64
65
ROOF PROJECTS
66
1Roof #3 Coated EPDM recoat in 2021$65,000.00
67
2Replace roof with 60 mil TPO$375,000.00
68
3Roof #5 recoat in 2025$20,000.00$20,000.00
69
70
ELECTRICAL PROJECTS
71
1
Upgrade Intercom System
$10,000.00$10,000.00
72
2Electrical Panel upgrades$100,000.00$100,000.00
73
3
Convert T8 to LED
$35,000.00$35,000.00
74
75
STANLY ACAD
76
GENERAL PROJECTS
77
1Replace windows (95)$125,000.00$125,000.00
78
2Repair brick fascia$40,000.00$40,000.00
79
3
Renovate Gang Restrooms
$75,000.00$75,000.00
80
4
Replace all Student furniture
$60,000.00$60,000.00
81
82
HVAC PROJECTS
83
1Replace 100 Ton Chiller$175,000.00$175,000.00
84
2Replace Boiler$120,000.00$120,000.00
85
3Upgrade Individual Room Control$100,000.00$100,000.00
86
4Replace unit ventilators$120,000.00$120,000.00
87
5Replace Gym gas packs & DX unit$40,000.00$40,000.00
88
89
ELECTRICAL PROJECTS
90
1
Upgrade Intercom System
$10,000.00$10,000.00
91
2Electrical Panel Upgrades$20,000.00$20,000.00
92
3
Replace T8 lighting with LED
$30,000.00$30,000.00
93
94
ROOF PROJECTS
95
1Recoat Roof #1 2025$55,000.00
96
2Replace Roof #1 60 mil TPO$375,000.00
97
3Recoat Roof #2$45,000.00
98
4
Replace Roof #2 60 mil TPO
$175,000.00
99
5Recoat Roof #3$65,000.00$65,000.00
100
Northern Zone