Assessment items
 Share
The version of the browser you are using is no longer supported. Please upgrade to a supported browser.Dismiss

Comment only
 
ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
2
To add to current OCP ready list:
3
Rack grounding point location
4
5
Additional items for ACS
6
Cooling
7
Liquid interfaces per solution1x feed+return2x feed+return
8
Pipe sizes1" BSP1,25"1,5" BSP2" BSP
To be defined by Harmonisation
9
FWS liquid heat capacity{Specify}
10
FWS liquid viscosity{Specify}
11
FWS circulation methodPressure driveFlowrateOther (specify)
12
FWS default flowrates{Specify}
13
FWS Supply temperature{Specify}
14
FWS desired return temperature{Specify}
15
FWS pressure (gauge)50-100 kPa100-400 kPa400-800 kPa
16
FWS Quality management????
To be defined by Harmonisation
17
18
19
Dielectric management
20
Containment measuresLiquid proofed floorLeak trays
Absorbent materials (capture)
Dual hull technology (none required)
Other (Describe
21
Containment strategy for any liquid from pressure release (enclosed chassis)
{Specify}
22
Measures to prevent gas leakage out into the atmosphere (2-phase)
{Specify}
23
Spill management proceduresMSDSOther (Describe)
24
Largest dielectric volume, including interconnected containers.{Specify}
25
Disaster tooling (largest connected volume)
Drainage (not to sewage)
Absorbent materials (spill kit)Other (describe)
26
Top-up liquid supply0-200L
200-1000L (regulations may apply)
1000L+ (regulations may apply)
27
Top-up liquid storageIn-roomIn-facilityOutside faciltiyOff-site
28
Ventilation capacity0-5 ACH6-10 ACH11+ ACH
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...