MONITORING PEKERJAAN BOREPILE
2
3
4
NoBANGUNANAREASUB AREADIAMETERREVJUMLAH TITIKKEDA- LAMANSTATUSMATERIALMATERIAL PER METERAKUMULASI KEDALAMAN
5
CONCRETEREBAR (btg)CONCRETEREBAR
6
TOTALAKTUALSISAø10D16ø10D16
7
minimalAktualSisa
8
A.SISA PEKERJAAN
9
002FEEDBELT GALLERY FOR DRYING10
10
Conveyor No. 2002000280006 6 - 15.5DONE - - - 30 93933139
11
003MAIN DRYING PLAN10000
12
0001 Main Structure #10030001800044015DONE - - - 600.5018.8514.00602025
13
0010 Pier 2 Foundation borepile0030010800024 24 - 15DONE - - - 3600.5018.8514.00360121500
14
0018 Combustion Chamber Table003001880009 9 - 16DONE - 001440.5018.8514.001444860
15
007PROPORTIONING STATION1000
16
Transfer Tower0080004800070 70 - 22DONE - - 1,120 15400.5018.8514.001,540519751.413716694
17
HVAC0080004800A - 22DONE - - - 00.5018.8514.0000
18
009ROASTING AND REDUCTION0000
19
0004 foundation pier #1 (bored pile)0090006800048 48 - 10DONE - 004800.5018.8514.00480162000
20
0002 Main Structure #1 Foundation0090002800050 50 - 10.5DONE - 005250.5018.8514.0052517719
21
010ELECTRIC FURNACE000
22
Slag Granulation01080009999 - 16.5DONE - - - 1633.50.5018.8514.001,63455131
23
201SUBSTATION0000
24
Trafo201800A0 -
CANCELED
- 0000.5018.8514.00000
25
202HEAD WATER TANK0
26
Struktur201800A64 64 - 12.9DONE - 00825.60.5018.8514.0082627864
27
28
TOTAL800374374000109056614835.51600600010
29
1000000000000
30
TOTAL POINT37437400010902430.5874040010
31
PERSENTASE100.00%0.00%
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100