| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Recommendations List - Inspection | |||||||||||||||||||||||||
2 | 2024 - July | |||||||||||||||||||||||||
3 | No | Checklist | Inspection Item | Item | Recommendation | Required time period for completion | Remarks | |||||||||||||||||||
4 | 3 | Jetty Control Room Inspection Checklist | 4.3. Battery backup | Jetty sever | No Battery Backup | Done | ||||||||||||||||||||
5 | 8 | Loading Arm Inspection Checklist | Storm locking Device and Mechanical locking system | L-6107 | SLD-Plate missing, MLS-Nut missing | Need to supply by ENS | ||||||||||||||||||||
6 | Mechanical locking system | L-6104 | MLS-Locking Nuts missing | Done | ||||||||||||||||||||||
7 | Safety ladder | Safety Ladder Little Corrosion. | Done | |||||||||||||||||||||||
8 | 10 | 20 Area Pump Inspection Checklist | 3.3. No lube oil leakage | P-2101A | Oil leakage | Done | ||||||||||||||||||||
9 | 12 | 20 Area Tank Inspection Checklist | 1.2. Spiral stairway/Access platform | T-2103 | Little Rust | Done | ||||||||||||||||||||
10 | 1.3. Hand railing | T-2102/T-2103 | Rust | Done | ||||||||||||||||||||||
11 | 1.4. Roof/shell manhole | T-2102/T-2103 | Rust | |||||||||||||||||||||||
12 | 1.6. Cooling pipeline | T-2102/T-2103 | Little Rust | |||||||||||||||||||||||
13 | 1.10. Radar level gauge | T-2102 | Rust | |||||||||||||||||||||||
14 | 1.16. Sampling device | T-2102 | Sampling device is locked | Done | ||||||||||||||||||||||
15 | 3.1. Fire arresters body and mesh | T-2102/T-2103 | Little Rust | Done | ||||||||||||||||||||||
16 | 15 | 30 Area Tank Inspection Checklis | 3.1. Fire arresters body and mesh | T-3104/T-3105/T-3106/T-3107/T-3108 | Little Rust | Done | ||||||||||||||||||||
17 | 17 | Tank Farm Electric Fire Pump Inspection Checklist | 4.2. Pump, painting | P-4002B | Need to apply top coat | Done | ||||||||||||||||||||
18 | 4.4. Pump, discharge pressure gauge | P-4003A/P-4003B/P-4002B | Not available | Need to supply by ENS | ||||||||||||||||||||||
19 | 5.1. Operation panel light indicator | P-4003A/P-4003B | Not available | Not applicable | ||||||||||||||||||||||
20 | 5.3. Operation panel ammeter | P-4003A/P-4003B | Not available | Not applicable | ||||||||||||||||||||||
21 | 22 | Sewage Treatment Plant Inspection Checklist | Blower | R-4011B | Oil leakage | Done | ||||||||||||||||||||
22 | 23 | Tank Farm Fresh Water System Inspection Checklist | Valves | HV-40125 | Not available | Not applicable | ||||||||||||||||||||
23 | 24 | Forklift Inspection Checklist | 1. Status of operator cabin (Seat and other controller) | FL-3 5-2 | Seat damage | Done | ||||||||||||||||||||
24 | 15. Horn | Not working | ||||||||||||||||||||||||
25 | 20. Paint condition | Not good condition | ||||||||||||||||||||||||
26 | 2024 - August | |||||||||||||||||||||||||
27 | No | Checklist | Inspection Item | Item | Recommendation | Required time period for completion | Remarks | |||||||||||||||||||
28 | 12 | 20 Area Tank Inspection Checklist | 1.1.Appearance of tank | T-2101/T-2102 | Tank top rust | Done | ||||||||||||||||||||
29 | 1.2. Spiral stairway/Access platform | T-2101/T-2102/T-2103 | Rust | Done | ||||||||||||||||||||||
30 | 1.3. Hand railing | T-2102/T-2103 | Little Rust | Done | ||||||||||||||||||||||
31 | 1.4. Roof/shell manhole | T-2101/T-2102/T-2103 | Rust | Done | ||||||||||||||||||||||
32 | 1.6. Cooling pipeline | T-2101/T-2102/T-2103 | Pipeline support and bolts rust | Done | ||||||||||||||||||||||
33 | 2.1. Open vent, Valve body | T-2101/T-2102 | Rust | Done | ||||||||||||||||||||||
34 | 2.3. Open vent, Connection flanges and bolts | T-2101/T-2102/T-2103 | Rust | Done | ||||||||||||||||||||||
35 | 3.1. Fire arresters Body and mesh | T-2101/T-2102/T-2103 | Rust | Done | ||||||||||||||||||||||
36 | 4.1. Manhole cover,bolts | T-2102/T-2103 | Bolts rust | Done | ||||||||||||||||||||||
37 | 15 | 30 Area Tank Inspection Checklist | 1.1.Appearance of tank | T-3105 | Tank top rust | Done | ||||||||||||||||||||
38 | 1.2. Spiral stairway/Access platform | T-3102/T-3107/T-3108 | Rust | Done | ||||||||||||||||||||||
39 | 1.3. Hand railing | T-3107/T-3108 | Little Rust | Done | ||||||||||||||||||||||
40 | 1.4. Roof/shell manhole | T-3102/T-3104/T-3106/T-3107 | Rust | Done | ||||||||||||||||||||||
41 | 1.8. Dip hatch | T-3106/T-3107/T-3108 | Rust | Done | ||||||||||||||||||||||
42 | 1.14. Foam connection | T-3106 | Rust | Done | ||||||||||||||||||||||
43 | 2.1. Open vent, Valve body | T-3105 | Rust | Done | ||||||||||||||||||||||
44 | 2.3. Open vent, Connection flanges and bolts | T-3107 | Rust | Done | ||||||||||||||||||||||
45 | 4.1. Manhole cover,bolts | T-3106/T-3107/T-3108 | Rust | Done | ||||||||||||||||||||||
46 | 16 | Tank Frm Diesel Fire Pump Inspection Checklist | 4.4. Battery charger's condition (Charging voltage) | P-4001A/P-4001B | One charger is not applicable | Done | ||||||||||||||||||||
47 | 22 | Sewage Treatment Plant Inspection | Blower R4011A | Under maintenance | Done | |||||||||||||||||||||
48 | Blower R4011B | Oil leakage | Done | |||||||||||||||||||||||
49 | 23 | Tank Farm Fresh Water System Inspection | HV-40125 | Not available | Not Available | |||||||||||||||||||||
50 | 2024 - September | |||||||||||||||||||||||||
51 | No | Checklist | Inspection Item | Item | Recommendation | Required time period for completion | Remarks | |||||||||||||||||||
52 | 11 | 20 Control Room Inspection | 3.3 Available mouse and Keyboard | Two mouses are missing | Done | |||||||||||||||||||||
53 | 12 | 20 Area Tank Inspection | 1.4 Roof/shell manhole | 2102/2103 | Rust | Done | ||||||||||||||||||||
54 | 1.6 Cooling pipeline | 2101/2102/2103 | Rust(Nut and Bolts) | Done | ||||||||||||||||||||||
55 | 1.7 Fire Line Filters | 2101/2102/2103 | Rust(Nut and Bolts) | Done | ||||||||||||||||||||||
56 | 2.3 Connection flanges and bolts | 2101/2103 | Rust | Done | ||||||||||||||||||||||
57 | 4.1 Manhole-Cover,bolts | 2101/2103 | Rust(Nut and Bolts) | Done | ||||||||||||||||||||||
58 | 1.1 Appearance of tank | 2102/2101 | Tank top rust | Done | ||||||||||||||||||||||
59 | 1.4 Roof/shell manhole | 2102 | Rust(Support and bolt) | Done | ||||||||||||||||||||||
60 | 2.1 Valve Body | 2102 | Rust | Done | ||||||||||||||||||||||
61 | 2.2 Ground wire connection | 2102 | Rust | Done | ||||||||||||||||||||||
62 | 16 | Tank Farm Diesel Fire Pump Inspection Checklist | 4.4 Battery Charger condition | P.4001B | One charger is not working. | Done | ||||||||||||||||||||
63 | 4.4 Battery Charger condition | P-4001A | One charger is not working. | Done | ||||||||||||||||||||||
64 | 15 | 30 Area Tank Inspection Checklist | 4.1 Cover bolts/Spiral stairway/access paltform-Roof/Shell Manhole | 3105/3102/3103/3104/3105/3106/3107/3108 | Little Rust | Done | T3106,3107 & 3108 Completed. T3103 in progress | |||||||||||||||||||
65 | 22 | Sewage Treatment Plant Inspection | R 4011 B | Oil Leak | Done | |||||||||||||||||||||
66 | 23 | Tank Farm Fresh Water System Inspection | HV40125 is not available | N/A | ||||||||||||||||||||||
67 | 2024 - October | |||||||||||||||||||||||||
68 | No | Checklist | Inspection Item | Item | Recommendation | Required time period for completion | Remarks | |||||||||||||||||||
69 | 1 | Jetty Diesel Fire Pump Inspection | F-03 | 4.4- 24.8v/24.8v | Done | Indicated figures were OK | ||||||||||||||||||||
70 | 4.3 - 1.25/1.25/1.25/1.25 | Done | Indicated figures were OK | |||||||||||||||||||||||
71 | F-01 | 4.3 - 1.28/1.27/1.27/1.26 | Done | Indicated figures were OK | ||||||||||||||||||||||
72 | 4.4 - 24.81v/24.80v | Done | Indicated figures were OK | |||||||||||||||||||||||
73 | 2 | Jetty Generator Inspection | 400KVA | 4.4 - 13.32v/ 13.30v | Done | Indicated figures were OK | ||||||||||||||||||||
74 | 4.3- Battery water levels and specific gravity - Battery damage | Done | Replaced | |||||||||||||||||||||||
75 | 3 | Loading Arm Auxiliaries Inspection | TT is not working. Need to replace. | Done | Jetty #2 Replaced. | |||||||||||||||||||||
76 | 4 | 30 Area Tank Inspection | T-3107/T-3106/T-3102/T-3104/T-3105/T-3103/T-3101/T-3108 | 1.2 Spiral staiway | Rust | Done | T3106,3107 & 3108 Completed. | |||||||||||||||||||
77 | 1.3 Hand railing | Rust | Done | T3106,3107 & 3108 Completed. | ||||||||||||||||||||||
78 | 1.4 Roof/Shell manhole | Rust | Done | T3106,3107 & 3108 Completed. | ||||||||||||||||||||||
79 | 1.8 Dip hatch | Rust | Done | T3106,3107 & 3108 Completed. | ||||||||||||||||||||||
80 | 2.1 Valve Body | Rust | Done | T3106,3107 & 3108 Completed. | ||||||||||||||||||||||
81 | 2.3 Connection flanges and bolts | Rust | Done | T3106,3107 & 3108 Completed. | ||||||||||||||||||||||
82 | 4.1 Cover,bolts | Rust | Done | T3106,3107 & 3108 Completed. | ||||||||||||||||||||||
83 | 16 | Tank Farm Diesel Fire Pump Inspection | P-4001B | 4.3 - 1.26/1.26/1.27/1.25 | Done | Indicated figures were OK | ||||||||||||||||||||
84 | 4.4 Battery chargers condition - One charger is not working | Need to supply by ENS | ||||||||||||||||||||||||
85 | P-4001A | 4.3 - 1.26/1.25/1.27/1.27 | Done | Indicated figures were OK | ||||||||||||||||||||||
86 | 4.4 Battery Chargers condition - One charger is not applicable. | Need to supply by ENS | ||||||||||||||||||||||||
87 | 19 | Tank Farm Generator Inspection | 1500KVA | 4.3 - 1.26/1.26/1.27/1.28 | Done | Indicated figures were OK | ||||||||||||||||||||
88 | 4.4 - 26.3 | done | Indicated figures were OK | |||||||||||||||||||||||
89 | 22 | Sewage Treatment Plant Inspection | R-4011A pump is under maintenance | Done | ||||||||||||||||||||||
90 | R 4011B Pump - oil leak | Done | ||||||||||||||||||||||||
91 | HV-40125 is not available | Done | ||||||||||||||||||||||||
92 | 23 | Tank Farm Fresh water System Inspection | 30 area Pipeline has a small leak. | Done | ||||||||||||||||||||||
93 | 2024 - November | |||||||||||||||||||||||||
94 | No | Checklist | Inspection Item | Item | Recommendation | Required time period for completion | Remarks | |||||||||||||||||||
95 | 1 | Jetty Diesel Fire Pump | Engine under maintenance | F-01 | ENS | |||||||||||||||||||||
96 | 2 | Jetty Fresh water Pump | LWP-04 | Light indicators | Indicator light is not working | Done | ||||||||||||||||||||
97 | 3 | Loading Arm Auxiliaries | Jetty No"02 | Hydaulic station one pressure guage is not clear | Need to supply by ENS | |||||||||||||||||||||
98 | 4 | 20 Control Room | UPS | UPS Is not available | Need to supply by ENS | |||||||||||||||||||||
99 | 5 | 20 Area tank | 1.4-Roof shelf,Radar level guage,Foam connection,cover,bolts | T-2103 | Little Rust | Done | ||||||||||||||||||||
100 | 6 | 30 Area Pump | 3.3 No lube oil leakage | P-3104B | small leak | Done | ||||||||||||||||||||