ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
Global Integrated Power Tracker: BRICS extract, September 2024
2
This Global Integrated Power Tracker data extract for the GEM report "Energy in the BRICS" is based on the September 2024 release. Please visit the project website for the full and latest version of the Global Integrated Power Tracker dataset: https://globalenergymonitor.org/projects/global-integrated-power-tracker/
3
Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2024 release. Distributed under a Creative Commons Attribution 4.0 International License.
4
Recommended Citation: "Global Energy Monitor, Global Integrated Power Tracker, September 2024 release." (See the CC license for attribution requirements if sharing or adapting the data set.)
5
Contact: James Norman, Research Analyst, Global Energy Monitor james.norman@globalenergymonitor.org
6
7
September 2024 Release Notes
8
This September 2024 update incorporates the latest release of the Global Bioenergy Plant Tracker (September 2024)
9
10
Changelog / past updates
11
Aug-24The August 2024 update incorporated the latest release of the Global Oil and Gas Plant Tracker (August 2024)
12
Jul-24The July 2024 update incorporated the latest release of the Global Nuclear Power Tracker (July 2024) and the Global Coal Plant Tracker (July 2024)
13
Jun-24The June 2024 update incorporated the latest release of the Global Solar Power Tracker (June 2024) and Global Wind Power Tracker (June 2024).
Global Wind and Solar Power tracker updates for June cover research on Europe and mainland China.
The Global Solar Power Tracker capacity threshold was updated to 1 MW.
Global Wind and Solar Power trackers now include a new data field to indicate when a project phase is dedicated for green hydrogen production.
Global Wind and Solar Power trackers no longer update operator information for countries outside of China.
Aggregated data of below 1 MW projects has been removed from the Global Solar Power Tracker.
14
May-24The May 2024 update incorporated the latest release of the Global Geothermal Tracker (May 2024).
15
Apr-24The April 2024 update incorporated the latest release of the Global Hydropower Tracker (April 2024).
The April 2024 hydropower update included a change of any facilities previously listed with the “inactive” status category to instead specify the status as either cancelled, mothballed, or retired.
Additionally, four extra columns were added to the dataset to account for binational hydropower facilities (see column descriptions below).
16
17
18
Coverage
19
This dataset is a compilation of Global Energy Monitor’s eight dedicated power sector trackers. Each tracker catalogs facilities above a certain threshold capacity (detailed below).
20
21
Power TrackersLatest releaseSummary Tables include capacity above specified thresholds
22
CoalJul-24≥30MW
23
Oil and gasAug-24≥50MW; ≥20MW in the European Union and the United Kingdom
24
SolarJun-24≥1MW
25
WindJun-24≥10MW (≥1MW data are provided for some countries when the data were readily available.)
26
NuclearJul-24n.a. no threshold applied
27
HydropowerApr-24≥75MW
28
BioenergyNov-23≥30MW (units below the 30 MW threshold are provided for some countries when the data were readily available)
29
GeothermalMay-24≥1MW
30
31
Resources
32
1. For more information on each facility, with references, see GEM.wiki pages (Column AO in 'power facilities' sheet)
33
2. For an explanation of the data compilation process, see "Methodology" on the Global Integrated Power Tracker website
34
3. A mapping tool for this data is available on the Global Integrated Power Tracker website
35
4. For summary statistics by country/area, region, etc., see "Summary Data" webpage
36
37
38
Columns
39
ColumnUnitsDefinitionNotes
40
Typen/a
One of eight power technology groups (coal, oil/gas, solar, wind, hydropower, nuclear, bioenergy, geothermal)
41
Country/arean/a
The Country/area column presents energy data within various economic contexts, and the geographical unit does not strictly follow political boundaries
42
Subregionn/aOne of 17 GEM-defined subregions of the world
43
Regionn/aOne of five GEM-defined world regions
44
Plant / Project namen/aCommonly used name
Preference is for a government provided name. Without that information, the name used by the owner or operating company is listed
45
Unit / Phase namen/aName or number of phase in plant/project
Roman numerals are changed to numbers. If the owner uses non-sequential numbers or other characters, those are used
46
Plant / Project name (local)
n/aCommonly used name in the locally used script
Left blank for local languages that use the Roman/Latin alphabet. Otherwise local name(s) in local script provided if possible
47
Plant / Project name (other)
n/aAlternative names, including the name in local script
48
Capacity (MW)MW
Total nameplate capacity, or best available data, of the project, in megawatts
49
Statusn/a
One of 8 status categories, see rows 83-92 below for description
50
Start yearYYYYYear the project was or will be commissioned
51
Retired yearYYYYYear the project was or will be taken offline
52
Technologyn/aSee rows 95-151 below for description
53
Fueln/aSee rows 154-208 below for description
54
Hydrogen productionTrue, blank
True if a project phase is dedicated for green hydrogen production. Only used for wind, solar, and geothermal trackers
55
Hydrogen capablen/a
Hydrogen capable: turbine - The turbine at the gas plant is capable of burning some % of hydrogen.
Hydrogen capable: progress - The gas plant has made some sort of progress beyond having a gas turbine that is hydrogen capable. This could include partnerships to secure hydrogen, announcements towards hydrogen infrastructure, or an actual hydrogen contract.
Using hydrogen - The plant is using hydrogen as a fuel.
no - The plant is not capable of using hydrogen.
not found - no information found
56
Country/area 1 (hydropower only)
n/a
Primary country/area where the project is located (unabbreviated)
If project is binational, Country/area 1 is either the country/area listed first in alphabetical order for projects where capacity is shared equally, or the country/area with a larger portion of the total project capacity.
57
Country/area 2 (hydropower only)
n/a
Additional country/area where the project is located (unabbreviated)
If project is binational, Country/area 2 is either the country/area listed second in alphabetical order for projects where capacity is shared equally, or the country/area with a smaller portion of the total project capacity.
58
Country/area 1 Capacity (MW) (hydropower only)
MW
Gross capacity, or best available data, of the portion of the project which is located in Country/area 1, in megawatts, rounded to whole number
Capacity cutoffs mentioned above apply to the project as a whole, not necessarily to the portions of an international project which are within one country/area boundary.
59
Country/area 2 Capacity (MW) (hydropower only)
MW
Gross capacity, or best available data, of the portion of the project which is located in Country/area 2, in megawatts, rounded to whole number
Capacity cutoffs mentioned above apply to the project as a whole, not necessarily to the portions of an international project which are within one country/area boundary.
60
Ownern/a
The company that directly owns the project (as in, the lowest-level identified owner in the chain of ownership)
61
Parentn/a
Highest-level project owner in the chain of ownership and ultimate parents (e.g., corporations, investment firms, and governments).
62
CHPyes/no/not foundCombined heat and power/cogeneration.
63
CCSyes/no/not found
Carbon capture and storage (CCS) is most relevant for in development projects.
64
Conversion/replacement
oil/gas: conversion/replacement/change of plans/use of ST in CC set
bioenergy: gas to bioenergy conversion/coal to bioenergy conversion/oil to bioenergy conversion/no conversion
oil/gas options include:
conversion - converts the steam turbine of an existing plant to burn gas.
replacement - existing plant is retired and replaced with a new gas-fired plant.
change of plans - cases in which one or more units were planned and those plans were cancelled and subsequently gas units were planned at the same location.
use of ST in CC set - cases where there is a steam turbine (usually coal) and is then repurposed to be part of a gas-fired combined cycle unit. Can also be referred to as “repowering” into a combined cycle where gas turbine(s) and HSRGs are added to the existing steam turbine. Was labeled as "partial conversion" in previous GOGPT data releases
not found
bioenergy options include:
gas to bioenergy conversion - when a unit has been or will be converted from gas to bioenergy
coal to bioenergy conversion - when a unit has been or will be converted from coal to bioenergy
oil to bioenergy conversion - when a unit has been or will be converted from fossil oil to bioenergy
no conversion - unit is not associated with a conversion
65
Unit conversion yearyyyyYear the unit was or is projected to be converted to bioenergy
66
Conversion from/replacement of (fuel)
n/aFuel that unit is converted from, or being replaced
67
Conversion from/replacement of (GEM unit ID)
G1+6/11 digits
GEM Unit ID of unit that is being converted from, or being replaced
68
Captive Industry Typesee definition
The type of captive industry use. Options include: agriculture, aluminum, automobiles, cement & building, chemicals, coal mining & coal products, cryptocurrency, dairy, data center, electronics, hydrogen production, industrial park, iron & steel, machinery, nickel, nutrition, oil & refining, other, other metals & mining, pulp & paper, rubber, sugar, textiles, unknown
69
Captive Industry Use
heat/power/both/none
"Captive" power plants are those that are within industrial facilities. These power plants typically supply most of their power (and if they're CHP, most of their heat as well) to the industrial facility. Options include: heat, power, both.
70
Captive Non Industry Use
heat/power/both/none
Indicate if heat or power is used outside of the captive industrial facility or complex. 'None' indicates an entirely captive plant.
71
Latitudedecimal degreesLatitude of the project, assumed WGS84 (Google Maps)
72
Longitudedecimal degreesLongitude of the project, assumed WGS84 (Google Maps)
73
Location accuracyapproximate, exact
Approximate based on using nearest city or other information in research, or exact based on visibility on map or given in research
74
Cityn/aCity, town, village or locality where project is located
75
Local area (taluk, county)n/aCounty or taluk where project is located
76
Major area (prefecture, district)
n/aPrefecture or district where project is located
77
Subnational unit (state, province)
n/a
Subnational unit where project is located, usually state or province
78
GEM.Wiki URLn/aURL of GEM.wiki pages
79
GEM location IDL1+6/11 digitsGEM generated ID unique for each project
Previous GEM ID numbers have been preserved. For example, a previous GEM ID of L812345 is now L100000812345.
80
GEM unit/phase IDG1+6/11 digitsGEM generated ID unique for each phase
Previous GEM ID numbers have been preserved. For example, a previous GEM ID of G812345 is now G100000812345.
81
82
Definitions and naming
83
ColumnStatus categoryNotes
84
StatusannouncedProjects that have been publicly reported in corporate or governmental planning documents or media coverage but not yet actively moving forward by applying for permits or seeking land, material, or financing.
85
Statuspre-constructionProjects that are actively moving forward in seeking governmental approvals, land rights, or financing (the sum of 'pre-permit' and 'permitted' statuses in the Global Coal Plant Tracker)
86
StatusconstructionProjects where site preparation and/or equipment installation are underway.
87
StatusshelvedSuspension of the project has been announced, or no progress has been observed for at least two years.
88
Statusshelved - inferred 2 y
Inferred status based on lack of observed progress for 2 years
89
StatusoperatingThe project has been formally commissioned; commercial operation has begun.
90
StatuscancelledA cancellation announcement for the project has been made, or no progress has been observed for at least four years.
91
Status
cancelled - inferred 4 y
Inferred status based on lack of observed progress for 4 years
92
StatusmothballedThe project is disused, but not dismantled.
93
StatusretiredThe project has been decommissioned or dismantled; this term is also used if the plant has been destroyed by war.
94
95
ColumnTypeName/abbreviationNotes
96
TechnologyCoalSubcriticalSubcritical
97
TechnologyCoalSupercriticalSupercritical
98
TechnologyCoalUltra-supercriticalUltra-supercritical
99
TechnologyCoalCFBCirculating fluidized bed
100
TechnologyCoalIGCCIntegrated gasification combined cycle