BCDEFGHIJKLMNOPQRSTUVWXYZAAABAC
1
Lincoln Library
Decarbonization Options
Lincoln Library
In-Kind Replacement Options
2
JANUARY 2026 GSHP+JULY 2026 GSHP+AUGUST 2026 GSHP+Total VarianceNotesJANUARY 2026 CONVENTIONALJULY 2026 CONVENTIONALAUGUST 2026 CONVENTIONAL (Updated with NE Engineering Project Costs)VarianceNotes
3
Proposal Scope Elements Well Drilling$511,799$405,711$384,210-$127,589Well drilling. External GC work.$0$0$0$0NA for conventional boiler replacement
4
Interior HVAC$4,203,942$2,786,092$2,054,452-$2,149,490Electrical transformer and generator work may also be required, pending results of Megger test. See below.*$1,833,526$1,283,468$1,194,045-$639,481New VAV's, ERV in attic, replace AHU2,3, electrical upgrade. View details HERE
5
New Electrical Transfomer$0$0$40,000$40,000Not detailed in prior budgets. Replaces current transformer with a 150kVA cluster transformer on the existing pole.$0$0$0$0Carried below only if required by Megger test
6
ADA$200,000$398,198$430,900$230,900Triggered by MAAB. All ADA items flagged are included here, though we belief that items #8 and #12 are quite likely to be waived (~$32k, in addition to several items), we are seeking meeting with MAAB to determine ADA variances alongside Town Building Inspector.$200,000$398,198$430,900$230,900Triggered by MAAB. All ADA items flagged are included here, though we belief that items #8 and #12 are quite likely to be waived (~$32k, in addition to several items), we are seeking meeting with MAAB to determine ADA variances alongside Town Building Inspector.
7
Building Envelope $235,134$43,380$43,380-$191,754Formally "Misc ECM's". Door and window weather stripping and caulking, air sealing and thermal barrier coating in accessible attic space.$235,134$43,380$43,380-$191,754Door and Window weather stripping and caulking, air sealing and thermal barrier coating in accessible attic space.
8
Flat Roof Replacement$0$0$0$0$88,665. OPTIONAL$0$0$0$0$88,665. OPTIONAL
9
Fire Alarm$0$0$0$0$443,327. OPTIONAL$0$0$0$0$443,327. OPTIONAL
10
Design Fee (30% drawings)$0$0$266,640$266,640Not detailed in prior budgets. Initial evaluation to bid document set.$0$0$0$0Included in interior HVAC.
11
Construction Drawing Set$0$0$486,501$486,501Not detailed in prior budgets. Includes engineering, electrical, ADA, MAAB application.$0$0$0$0Included in interior HVAC.
12
Project-Level Costs$0$1,744,191$1,744,191$1,744,191Program cost structure; Investment Grade Energy Audit & Proposal, Engineering, Project Management, On-site construction management, Commissioning, Training, Measurement & Verification, Cost of Risk, Payment and performance bonds, Travel, Site Conditions, Construction interest, Hazardous Waste, Grant Support, Overhead & Profit. $0$862,523$835,149$835,149Development and delivery costs like professional services, management, construction support, testing, financial protections, and contractor overhead and profit.  
13
Base Scope Project Value ($)$5,150,875$5,377,572$5,450,274$299,399This includes all items deemed neccessary to the project that cannot potentially be reduced through variance. See below for grants & incentives (confirmed and potential).$2,268,660$2,587,570$2,503,474$234,814
14
15
To be determined by Eversource during the week of 9/7/26Technical Assistance Study$0$0$9,000$9,000Required by Eversource to confirm / approve custom incentives. During a meeting with ESG and PowerOptions on Fri. 9/4/26, Eversource tentatively agreed to front the cost of any needed TA study (~$9,000) to approve custom incentives for the project. This may allow Eversource to complete a preliminary evaluation of possible custom incentives and provide a conservative estimate ahead of Town Meeting.$0$0$0$0NA for conventional replacement.
16
New Transformer Pole and Feeders$0$0$120,000$120,000Megger test results expected in mid-September to determine whether or not this expense is needed or can be reduced. May also be eligible for ITC credits.$0$0$160,000$160,000This is an estimate of both the new electrical transformer ($40K), as well as the pole and feeders ($120K). Megger test results expected in mid-September to determine whether or not this expense is needed or can be reduced. May also be eligible for ITC credits.
17
New Emergency Generator$0$0$368,900$368,900Megger test results expected in mid-Sept. that would determine if this may be triggered. Would require follow up discussion with Building Inspector and Brandon to determine generator requirements / interpretation. $0$0$368,900$368,900Megger test would also determine if a generator is required.
18
Budget Contingency$250,000$268,879$297,409$47,409Assumed 5% contingency for ESG due to CM at Risk model.$113,433$258,757$250,347$136,914Assumed 5% contingency back in January. 10% contingency in July and August.
19
20
Total Project Value$5,400,875$5,646,451$6,245,583$844,708Total Project Costs BEFORE incentives$2,382,093$2,846,326$3,282,721$900,628Total Project Value BEFORE incentives.
21
22
Incentives & Grants Investment Tax Credit (ITC via Direct Pay)$1,674,088$1,150,000$1,150,000-$524,088Based on 25.5% confirmed for ESG (per Energy Tax Savers)$0$0$0$0NA in conventional project
23
ITC Bonus$0$400,000$400,000$400,000Based on 34% total (or an additional 8.5%) for ESG.$0$0$0$0NA in conventional project
24
Climate Leader Decarbonization Accelerator Grant$1,000,000$1,000,000$1,000,000$0If we start over, we may need to reapply for this money, but it would remain available.$0$0$0$0NA in conventional project
25
Mass Save Rebates$260,729$0$0-$260,729App $129,600 based on $3,600/ton. After performing Technical Assistance (TA) study w 50% match from Town, see TA Study line item above.$0$0$0$0NA in conventional project
26
META Grant$0$0$0$0Applied for up to $15,000 in assistance for TA Study.$0$0$0$0NA in conventional project
27
Mass Cultural Grant$0$0$0$0Potential $200,000 grant available$0$0$0$0NA in conventional project
28
Total Est. Incentives & Grants$2,934,817$2,550,000$2,550,000-$384,817Total Incentives & Grants (that have been awarded or confirmed very likely)$0$0$0$0NA in conventional project
29
30
Net Project Value ($) October 2026$2,466,058$3,096,451$3,695,583$1,229,525Total Project Value AFTER incentives. $2,382,093$2,846,326$3,282,721$900,628Total Project Value AFTER incentives.
31
32
Net project value with inflation (Assuming 3.5% if project is sent out to market and pushed to Spring 2027)$2,655,089$3,294,077$3,914,178$1,259,089Inflation modeled at 3.5% increase in total project value (inflation, increases in labor and equipment, etc.) minus incentives. ESG at 0% if contract can be executed by October 31, 2026.$2,465,466$2,945,948$3,397,617$932,150August inflation modeled at 7% of total project value, but ultimately depends on when work is undertaken. Could be less if all done next year.
33
34
Annual Cost SavingsEnergy ($)$12,360$12,360$2,196-$10,164Energy cost savings estimates based on ESG modeling. This does not take into effect any rate change based on demand. $1,494$1,494$3,848$2,354These are based on ESG analysis
35
O&M ($)-$4,723-$4,723-$4,722$1OPTIONAL: After Year 1 (ESG included 1 year of O&M) . Library currently does not have an O&M contract but has spent an average of $12,061 over last three years) ($16,783 new spend - $12,061 old spend = $4722 net new cost) . ESG can help you bid this in Year 2. I its recommended but only required with a performance guarantee.$0$0-$8,078-$8,078OPTIONAL: These are based on ESG analysis ($20,139-12,061=$8,078.60 . Cost to maintain convential is more than GSHP by about 20%. Will be required with a performance guarantee.
36
M&V ($)$0$0-$5,990-$5,990OPTIONAL After Year 1 (ESG included 1year of M&V at no additional charge). Will work with Beth on final scope to present. Will be required with a performance guarantee.$0$0-$5,990-$5,990OPTIONAL After Year 1 (ESG included 1year of M&V at no additional charge). Will work with Beth on final scope to present. Will be required with a performance guarantee.
37
Total ($)$7,637$7,637-$8,516-$16,153$1,494$1,494-$10,220-$11,714
38
82
Estimated Annual Debt Service Financing Information Original CPC Vote January 2026Revised Estimate August 2026Variance
83
Total Authorization-Original $4,400,875$5,245,583$844,708
84
Net Project Cost to Bond$2,466,058$3,695,583$1,229,525
85
86
BAN -one year interest only $118,000$131,140$13,140
Revised BAN based on total project cost less $1,000,000 climate leader received
87
Permanent -20 Yr borrowing -Aug$180,000$280,422$100,422
4.35% interest rate per MMD
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143