OpenStudio Measures Roadmap
2
Last Updated 02/09/2016
3
261 measures are currently visible.
4
UID can be blank if measure coding has not started yetuse only valid BCL measure tagsBCL measures shown are from NREL, Xcel Energy, and PNNLsome measures have different UID in repo than on BCL
5
UIDNameTagsMeasure TypeOn BCLBCL Group Or Code RepositoryDescriptionalt UID
6
bf6ac5d5-6348-4012-b7b4-1200a672e377Add Cost per Area to ConstructionEconomics.Life Cycle Cost AnalysisModelMeasureYesNRELThis measure will create life cycle cost objects associated with a the building. You can set a material & installation cost, demolition cost, and O&M costs. Optionally existing cost objects already associated with building can be deleted. This measure will not affect energy use of the building.
7
ad632782-125f-45c8-a9cf-516e184b418aAdd Cost per Area to Unused ConstructionEconomics.Life Cycle Cost AnalysisModelMeasureYesNRELThis measure is the same as "Add Cost per Area to Construction" except that it only offers constructions that are not used on any surfaces in the baseline construction.
8
153992bb-0202-424b-9fbb-57fcf0285e65Add Cost per Floor Area to BuildingEconomics.Life Cycle Cost AnalysisModelMeasureYesNRELThis measure will create life cycle cost objects associated with a the building. You can set a material & installation cost, demolition cost, and O&M costs. Optionally existing cost objects already associated with building can be deleted. This measure will not affect energy use of the building.
9
42cf1acc-c0bc-46cd-af67-8a17cadaab7bAdd Cost per Floor Area to Electric EquipmentEconomics.Life Cycle Cost AnalysisModelMeasureYesNRELThis measure will create life cycle cost objects associated with electric equipment. You can choose any electric equipment definition used in the model that has a watt/area power. You can set a material & installation cost, demolition cost, and O&M costs. Optionally existing cost objects already associated with the selected electric equipment definition can be deleted. This measure will not affect energy use of the building.
10
eeec5adf-b3a8-498a-b0d1-eabd81ca0620Add Cost per Floor Area to LightsEconomics.Life Cycle Cost AnalysisModelMeasureYesNRELThis measure will create life cycle cost objects associated with lights. You can choose any light definition used in the model that has a watt/area power. You can set a material & installation cost, demolition cost, and O&M costs. Optionally existing cost objects already associated with the selected light definition can be deleted. This measure will not affect energy use of the building.
11
a5f5ddcf-48bb-413a-a712-0ee22f0b40a4Add Cost per Floor Area to Unused LightsEconomics.Life Cycle Cost AnalysisModelMeasureYesNRELThis measure is the same as "Add Cost per Floor Area to Electric Lights" except that it only offers lights definitions that are not used in the model.
12
a667a52f-aa04-4997-9292-c81671d75f84Add Cost To Supply Side HVAC Component by Air LoopEconomics.Life Cycle Cost AnalysisModelMeasureYesNRELThis will add cost to HVAC components of a specified type in the selected air loop(s). It can run on all air loops or a single air loop. This measures only adds cost and doesn't alter equipment performance
13
6da969e0-4256-49bf-9607-26504cc3d421Add Monthly Utility DataEconomics.Life Cycle Cost AnalysisModelMeasureNorepo - NREL working measuresReads in custom format and adds utility data
14
2c6aee30-6e8f-49d3-99fb-7ea0b674bf6aSet Lifecycle Cost ParametersEconomics.Life Cycle Cost AnalysisModelMeasureYesNRELThis measure sets the analysis type to "FEMP" and has an argument for the length of the study period in years.bb5913af-d959-4e2a-81c5-cd0f3d14c99a
15
42e9f831-f39a-4709-a79b-41db49c94f8cTariff selection blockEconomics.Life Cycle Cost AnalysisEnergyPlusMeasureYesNRELThis measure sets block rates for electricity, and flat rates for gas, water, district heating, and district cooling.
16
539c3e8e-6c41-4f50-ac61-6cbbf1ee1b55Tariff selection flatEconomics.Life Cycle Cost AnalysisEnergyPlusMeasureYesNRELThis measure sets flat rates for electricity, gas, water, district heating, and district cooling.
17
d65ae535-f0ea-4745-9f5b-8d42c7070741Tariff selection genericEconomics.Life Cycle Cost AnalysisEnergyPlusMeasureYesNRELThis measure creates tariff objets from pre-poulated IDF files in the measures "resoruces" directory.
18
a890e296-b357-432f-8d53-6428d9bf3c0aTariff selection time and date dependantEconomics.Life Cycle Cost AnalysisEnergyPlusMeasureYesNRELThis measure sets flat rates for gas, water, district heating, and district cooling but has on seasonal and off peak rates for electricity. It exposes inputs for the time of day and day of year where peak rates should be applied.
19
c5ab60e9-b8e5-4653-a502-5ed030f1335dXcel EDA Tariff Selection and Model SetupEconomics.Life Cycle Cost AnalysisEnergyPlusMeasureYesXcel EnergyAdd the selected Xcel utility rate, as well as set the timestep and lifecycle costing parameters as required by the Xcel EDA program.ef3d763c-5947-47a6-987f-6cfc2aa1b1b4
20
Austin Energy EDA Tariff SelectionEconomics.Life Cycle Cost AnalysisEnergyPlusMeasureNoAustin EnergyThis will be based on Tariff selection generic measure.
21
62babdc7-c81e-4dfd-96e8-af1628a55167Add Daylight Sensor at the Center of Spaces with a Specified Space Type AssignedElectric Lighting.Electric Lighting ControlsModelMeasureYesNRELThis measure will add daylighting controls to spaces that that have space types assigned with names containing the string in the argument. You can also add a cost per space for sensors added to the model.
22
9f395ee4-5f82-4ca6-8a50-cb854893827eAEDG K12 - Interior Lighting ControlsElectric Lighting.Electric Lighting ControlsModelMeasureYesNRELThis measure reduces the values associated with lighting schedules to simulate reductions due to vacancy sensors throughout the building.
23
57ba8820-6394-4c76-86c3-cc045a8a2b26AEDG Small to Medium Office - Interior Lighting ControlsElectric Lighting.Electric Lighting ControlsModelMeasureYesNRELThis measure reduces the values associated with lighting schedules to simulate reductions due to vacancy sensors throughout the building.
24
4ed09e7b-7a05-401b-9d28-c4c80cd4bfacAssign ASHRAE 90.1-2010 Daylighting ControlsElectric Lighting.Electric Lighting ControlsModelMeasureYesXcel EnergyThis measure adds automatic daylighting controls for Primary Sidelighted Areas and Toplighting according to ASHRAE 90.1-2010 sections 9.4.1.4 and 9.4.1.5.
25
83556211-1f78-46ef-a37c-106afc3f5326Change Lighting Schedule by Space TypeElectric Lighting.Electric Lighting ControlsModelMeasureYesXcel EnergyChanges the lighting schedule to a user specified schedule for a user specified space type.
26
93461778-59a1-49ca-8bbb-f4b939e4a9d8Reduce Night Time Lighting LoadsElectric Lighting.Electric Lighting ControlsModelMeasureYesNRELMany buildings have lights that run unnecessarily at night. Turning these lights off at night can provide energy savings without impacting the day-to-day operation of the building occupants. Implementing this change may require coordination with after-hours cleaning and maintenance crews.acce8fde-a5d7-4c27-af89-28327132bafa
27
34f9050c-5f8f-4d10-8e46-30ca8333114dAdd Exterior LightsElectric Lighting.Lighting EquipmentModelMeasureYesNRELAdd exterior lighting to the building. This may be in addition to or in place of existing exterior lighting. This lighting will run from sunset to sunrise. Optionally you can add costs to the lights.
28
04fd62eb-3e9f-4bfc-98d8-7827b47e034aAedg k 12 exterior lightingElectric Lighting.Lighting EquipmentModelMeasureYesNRELThis measure will create exterior lights objects in four different categories described below. The lighting levels and controls will be based on the "How to Implement Recommendations" section in the AEDG; any existing exterior lighting will be removed. A special input is needed for this measure to define the exterior lighting zone, which further describes whether the site is urban or rural.
29
2faf0e50-8589-427f-8ee8-928169b1f7faAEDG K12 - Interior LightingElectric Lighting.Lighting EquipmentModelMeasureYesNRELThis measure removes all existing electric equipment objects from spaces recognized as primary or secondary school space types, with the exception of the kitchen which has a dedicated measure that should be used. New equipment will be added based on the 50% K12 AEDG recommendations.
30
90211a9c-de3f-458d-85c1-b40666b55f06AEDG Small to Medium Office - Exterior LightingElectric Lighting.Lighting EquipmentModelMeasureYesNRELThis measure will create exterior lights objects in four different categories described below. The lighting levels and controls will be based on the "How to Implement Recommendations" section in the AEDG; any existing exterior lighting will be removed. A special input is needed for this measure to define the exterior lighting zone, which further describes whether the site is urban or rural.
31
e1e16b8f-5cbf-447c-9f76-7fe69b3cf01eAedg small to medium office interior lightingElectric Lighting.Lighting EquipmentModelMeasureYesNRELThis measure removes all existing lighting objects from spaces recognized as primary or secondary school space types. New lighting will be added based on the 50% Small to Medium Office AEDG recommendations.
32
842246df-e490-458d-afd3-3d9ff7be406cLPD to LampsElectric Lighting.Lighting EquipmentModelMeasureNorepo - NREL working measuresThis take a generic lighing power density and convert it to individual fixtures
33
d37b7ed5-887a-4d1f-b304-259462eadbe9Reduce Lighting Loads by PercentageElectric Lighting.Lighting EquipmentModelMeasureYesNRELThe lighting system in this building uses more power per area than is required with the latest lighting technologies. Replace the lighting system with a newer, more efficient lighting technology. Newer technologies provide the same amount of light but use less energy in the process.791f3404-a28b-4a80-ba3f-e15b339e39ea
34
40154317-5b0b-400d-99ac-ac6235fb8647Replace All Incandescent Lampswith CfL LampsElectric Lighting.Lighting EquipmentModelMeasureNorepo - NREL working measures
35
6e7cc922-7715-4270-96fa-eb2916f74b10Replace All T12 Lamps with 25 Wt8 LampsElectric Lighting.Lighting EquipmentModelMeasureNorepo - NREL working measuresRetrofit all of the T-12 lamps with low-wattage T-8 lamps. The low-wattage T-8 lamps should be specified a 25W, with a color temperature of 3,500 - 4,100 Kelvin. If the ballasts need to be replaced, electronic ballasts should be specified as program start ballasts, so that they can accommodate occupancy sensor controls. The ballasts should be specified with a ballast factor of 0.88, and a power factor above 95%. The total system Color Rendering Index (CRI) should be designed to be greater than 85%. The electronic ballasts are designed to provide the appropriate starting and operating electricity to the lamps. Electronic ballasts operate at a higher frequency, eliminating flicker, and have a higher efficiency than magnetic ballasts.
36
2c69a60e-501a-4516-a253-725d23808b2dResidential LightingElectric Lighting.Lighting EquipmentModelMeasureNorepo - OpenStudio BeoptAdds lighting to the building model. The lighting annual energy consumption can either be specified by the kWh/yr it consumes, the Building America Benchmark, or using more detailed inputs. More detailed inputs use the hardwired fraction, plugin fraction, and efficacy for CFLs, LED, and LFL. The schedule used for lighting is based on the Building America Benchmark and changes based on location.
37
27b7b89c-6d88-44c9-a84a-0038e768bd42Set EnergyPlus Light objects LPDElectric Lighting.Lighting EquipmentEnergyPlusMeasureYesNRELSet the LPD for all lights objects in the model. Input values are in SI units.88e02d9f-611f-45ec-afd7-eb9c0e2f8ccf
38
38962937-0bd7-480c-b39a-12d075f3f493Set Lighting Loads by LPDElectric Lighting.Lighting EquipmentModelMeasureYesNRELSet the lighting power density (W/ft^2) in the to a specified value for all spaces that have lights. This can be applied to the entire building or a specific space type. Cost can be added per floor area.901c076e-02af-4bf4-a780-57391e7b1e2a
39
7603627f-94f0-443f-a987-f260e39ff888Swap All Lights For New DefinitionElectric Lighting.Lighting EquipmentModelMeasureNorepo - NREL working measuresThis will use a new lights definition for all lights that use a lighting power with a user selected lighting definition. This won't alter lights that have per area or per person value.
40
3bbebd1f-69fd-4d49-96fe-1284bce962f4Swap Lights DefinitionElectric Lighting.Lighting EquipmentModelMeasureYesNRELThis measure will swap out one lights definition for another. All objects that had referred to the original definition will now refer to the new one.63845525-5b86-448f-9a34-6be8481496ea
41
1e29e117-3916-4368-b24d-75da54045956Add Overhangs by Projection FactorEnvelope.FenestrationModelMeasureYesNRELAdd overhangs by projection factor to specified windows. The projection factor is the overhang depth divided by the window height. This can be applied to windows by the closest cardinal direction. If baseline model contains overhangs made by this measure, they will be replaced. Optionally the measure can delete any pre-existing space shading surfaces.
42
aafc3640-fc91-11e3-a3ac-0800200c9a66Adjust Window to Wall RatiosEnvelope.FenestrationModelMeasureNorepo - NREL working measuresThis measure will adjust the window to wall ratio for all exterior surfaces. If one or more windows exist on an affected wall, they will be removed and replaced with a single ribbon window. Doors will not be removed. If the requested ratio can?t be achieved then the wall will remain un-touched.
43
76683121-d531-46c0-8e1c-749c1ff646f0AEDG K12 - Fenestration and Daylighting ControlsEnvelope.FenestrationModelMeasureYesNRELThis measure will remove all existing exterior windows, glass doors, and skylights from your model. They will be replaced with view and daylight windows as recommended by the K12 AEDG recommendations. Windows on the south facade will have a exterior shading or light shelf surfaces depending on if they are view or daylight windows. East and west view windows will have internal shading controls. In spaces with daylighting controls daylight sensor will be added. The modeler should inspect where the sensors were placed, the recommended illuminance setpoint, and the fraction of the zones lighting controlled by the sensor.
44
4252d6c7-ccd5-4cae-b55e-8d7b1dfcc717AEDG Small to Medium Office - Fenestration and Daylighting ControlsEnvelope.FenestrationModelMeasureYesNRELThis measure will remove all existing exterior windows, glass doors, and skylights from your model. They will be replaced with view and daylight windows as recommended by the Small to Medium Office AEDG recommendations. Windows on the south facade will have a exterior shading or light shelf surfaces depending on if they are view or daylight windows. East and west view windows will have internal shading controls. In spaces with daylighting controls daylight sensor will be added. The modeler should inspect where the sensors were placed, the recommended illuminance setpoint, and the fraction of the zones lighting controlled by the sensor.
45
b78f10fa-b38d-4de2-86e9-344a78e68847Process Constructions DoorsEnvelope.FenestrationModelMeasureNorepo - OpenStudio BeoptThis measure creates constructions for exterior doors adjacent to the living space as well as garage doors.
46
648dc42f-f079-4d97-913e-6dc3e19560b1Process Constructions WindowsEnvelope.FenestrationModelMeasureNorepo - OpenStudio BeoptThis measure creates constructions for windows. This measure also creates the interior shading schedule, which is based on shade multipliers and the heating and cooling season logic defined in the Building America House Simulation Protocols.
47
94b0f7ef-cbc0-4da0-b1db-a46a291028afReplace Exterior Window Constructions At Different Orientations With Another Construction Envelope.FenestrationModelMeasureYesXcel EnergyReplace existing windows with different windows to change thermal or lighting performance at different orientations. Window technology has improved drastically over the years, and double or triple-pane high performance windows currently on the market can cut down on envelope loads greatly. Window frames with thermal breaks reduce the considerable energy that can transfer through thermally unbroken frames. High performance windows typically also come with low-emissivity (low?e) glass to keep radiant heat on the same side of the glass from where the heat originated. This means that during the cooling months a low-e glass would tend to keep radiant heat from the sun on the outside of the window, which would keep the inside of a building cooler. Conversely, during heating months low-e glass helps keep radiant heat from inside the building on the inside, which would keep the inside of a building warmer. Life cycle cost values may be added for the new window applied by the measure.
48
e9cc8132-fe83-4cd6-a168-8c7637b04e12Replace Exterior Window Constructions with a Different Construction from the ModelEnvelope.FenestrationModelMeasureYesNRELReplace existing windows with different windows to change thermal or lighting performance. Window technology has improved drastically over the years, and double or triple-pane high performance windows currently on the market can cut down on envelope loads greatly. Window frames with thermal breaks reduce the considerable energy that can transfer through thermally unbroken frames. High performance windows typically also come with low-emissivity (low?e) glass to keep radiant heat on the same side of the glass from where the heat originated. This means that during the cooling months a low-e glass would tend to keep radiant heat from the sun on the outside of the window, which would keep the inside of a building cooler. Conversely, during heating months low-e glass helps keep radiant heat from inside the building on the inside, which would keep the inside of a building warmer. Life cycle cost values may be added for the new window applied by the measure.95116deb-0716-4cdc-af27-09c463befc7c
49
f347ae80-48b4-4c40-bfd4-6c5139b38136Set Window to Wall Ratio by FacadeEnvelope.FenestrationModelMeasureYesNRELThis measure will set the window to wall ratio for exterior surfaces with a specified orientation. If one or more windows exist on an affected wall, they will be removed and replaced with a single ribbon window. Doors will not be removed. If the requested ratio can't be achieved then the wall will remain untouched.c567a0bf-a7d9-4a06-afe9-bf7df79e6bf8
50
659edf6a-866e-430b-b7ff-97ad865f33ceAlex measure bEnvelope.FormModelMeasureYesNRELBasic measure for testing
51
2c91fe40-db31-4334-a1dd-817cd419f1b6Assign Spaces to StoriesEnvelope.FormModelMeasureYesNRELThis measure will look as space geometry and assign each space to a story, creating new stories as necessary.
52
3e988765-9673-46f8-9b65-99d5b86c2b22Bar Aspect Ratio Sliced by Space TypeEnvelope.FormModelMeasureNorepo - NREL working measuresThis measure will create a building envelope based on a target floor area, aspect ratio, floor to floor height, and a collectin of space types and fraction of building using that space type.
53
3dcac94d-8a2e-43b6-8698-a3a4e8f3903fBar Aspect Ratio StudyEnvelope.FormModelMeasureYesNRELThis measure will create a building envelope based on a target floor area, aspect ratio, and floor to floor height.
54
d81f8791-081d-4346-9f27-1b721d27ea86Cleanup Space OriginsEnvelope.FormModelMeasureYesNRELThis measure will move the space origin for all spaces to the origin of bounding box closest to the model origin.
55
09711168-01a7-4abc-b710-b49d59d927d8Clone Building From External ModelEnvelope.FormModelMeasureNorepo - NREL working measuresThis measures clones the building in from an external model in place of the existing building in a model. In addition to changing the feilds in the building object itself, it will bring in meters, building story objects, shading surface groups, thermal zones, and spaces. This includes their children. Currently this doesn't included HVAC systems, site lighitng.
56
10a3ffb4-de25-4cb3-87ff-5922219716f9Import Envelope and Internal Loads From IDFEnvelope.FormModelMeasureYesNRELThis will replace the building in your current model with the building objects form the selected IDF file. This will include spaces and thermal zones, and related resources such as constructions, materials, internal loads, and schedules.7e683bea-97c1-4e78-8e9c-0b80ca996a50
57
45ced2d1-e0d9-46ee-aed2-dcbaa4089ccaInject OSM Geometry into an External IDFEnvelope.FormEnergyPlusMeasureYesNRELThe goal here is to let people bring an IDF into OpenStudio to add or alter geometry. Then to inject only the geometry back into a copy of the source IDF file, which has never been brought into OpenStudio.633cd1c5-5b55-4b50-ab20-cf2d2f7ddff8
58
a397913f-bbc0-4dd2-804b-874746e18ad1Intersect Space GeometryEnvelope.FormModelMeasureYesNRELThis measure will split base surfaces of adjcent spaces that intersct with each other. It currently only looks at base surfaces and not sub-surfaces.090d34d2-f93a-42ee-b9c3-b23740a06a05
59
591ad7a7-ca47-459e-8d0e-6fd47d158d8aList Of ConstructionsEnvelope.FormModelMeasureNorepo - NREL working measuresIf this expands into quantity take off need to account for interior partitions, matched surfaces.
60
4a3a96e7-00ea-4b61-9433-3d6fc3395a62Process Ground TemperatureEnvelope.FormEnergyPlusMeasureNorepo - OpenStudio BeoptThis measure calculates ground temperatures using weather data.
61
5665361d-fa13-4341-8776-185ede476540Process Thermal Mass FurnitureEnvelope.FormModelMeasureNorepo - OpenStudio BeoptThis measure creates internal mass for furniture in the living space, finished basement, unfinished basement, and garage.
62
7bf22221-1930-4c89-baf9-02a6878c9ad4Process Thermal Mass Partition WallEnvelope.FormModelMeasureNorepo - OpenStudio BeoptThis measure creates internal mass for partition walls in the living space and finished basement.
63
6cd5982a-cd71-4ce1-880e-315f107658cfReport Volume Area And Perimeter Of BuildingEnvelope.FormEnergyPlusMeasureNorepo - NREL working measuresThis is an example of measure that makes a temporary OSM model to have access to methods such as area and volume, then reports that data and throws the model away
64
a5be6c96-4ecc-47fa-8d32-f4216ebc2e7dRotate Building Relative to Current OrientationEnvelope.FormModelMeasureYesNRELRotate your building relative to its current orientation. This will not rotate site shading objects.a5be6c96-4ecc-47fa-8d32-f4216ebc2e7d
65
eb218516-5fa5-47fe-948d-274777c7d592Simplify Geometry to Sliced BarEnvelope.FormModelMeasureNorepo - NREL working measuresThis is an experimental measure looking at ways to simply the geometry, or to create geometry when you only no percentage of space types number of floors and total area. This technique will match the building floor area but will sacrifice the exterior exposure. So it will produce better results on more boxy buildings than a building with many wings. I may try to come up with solution that also tries to maintain exterior exposure in another version.
66
2def6daf-99c1-475d-b6b4-44f292e7e1abSurface matchingEnvelope.FormModelMeasureYesNRELThis will look for surfaces in adjacent spaces with similar geometry and create thermal connections between them.e9c69c36-bf33-4ac4-b695-41dee26ee880
67
02447d29-ee6a-436a-af49-3358ad90f7aaAEDG K12 - Envelope And Entry InfiltrationEnvelope.InfiltrationModelMeasureYesNRELThis measure addresses two sources of air infiltration. The first is infiltration through the building envelope. The second is infiltration due to occupants entering and leaving the building. The AEDG provides recommendations and tips on how to limit infiltration in both cases. For occupant entry vestibules may be recommended at major entries depending on the size of the building and climate zone.
68
9c977bfb-d3f8-4f61-afcf-9524edf82cb8AEDG Small to Medium Office - Envelope And Entry InfiltrationEnvelope.InfiltrationModelMeasureYesNRELThis measure addresses two sources of air infiltration. The first is infiltration through the building envelope. The second is infiltration due to occupants entering and leaving the building. The AEDG provides recommendations and tips on how to limit infiltration in both cases. For occupant entry vestibules may be recommended at major entries depending on the size of the building and climate zone.
69
c4dde5f8-45aa-4381-93dc-e598f7c31155Process AirflowEnvelope.InfiltrationEnergyPlusMeasureNorepo - OpenStudio BeoptThis measure processes infiltration for the living space, garage, finished basement, unfinished basement, crawlspace, and unfinished attic. It also processes mechanical ventilation and natural ventilation for the living space.
70
5103ca65-8462-4633-a65f-02954f4c929fProcess Heatingand Cooling SeasonsEnvelope.InfiltrationModelMeasureNorepo - OpenStudio BeoptThis measure creates the heating season and cooling season schedules based on weather data.
71
d8161857-8b77-4e1a-a76c-ae5deab7c1e0ReduceSpaceInfiltrationByPercentageEnvelope.InfiltrationModelMeasureYesNRELThis measure will reduce space infiltration rates by the requested percentage. A cost per square foot of building area can be added to the model.6e9de4b1-aa97-4010-80c8-529e53ffe943
72
854932e4-c005-4922-a047-ddc641f5fd2cSet EnergyPlus Infiltration Flow Rate Per Floor AreaEnvelope.InfiltrationEnergyPlusMeasureYesNRELSet the flow rate per floor area value for all infiltration objects in the model. Input values are in SI units.490a2af3-7b64-4915-bf9e-9a3a7b525a17
73
b43adf2d-1e8f-48a4-9470-bde1b1444b4fSet Space Infiltration by Exterior Surface AreaEnvelope.InfiltrationModelMeasureYesNRELReplace all Space Infiltration objects with a new one that has a prescribed flow rate per exterior surface area. There are many strategies that can be used to reduce infiltration. Seal Windows ? Seal all windows and doors with weather strip and fill any air gaps with insulation and caulking to prevent air infiltration. Install Revolving Doors on the Inner Door Entrance - Replace the high traffic entrance doors with revolving doors. This will reduce the air infiltration associated with the doors. Notice that loading dock doors and handicapped accessible entrances cannot be replaced with revolving doors. Install an Air Curtain for the Loading Dock Door - An air curtain should be installed in the entryway of loading dock doors. This will greatly reduce outside air from infiltrating during periods of time when loading dock doors are open. Identify and seal other sources of infiltration ? Look for other uncontrolled infiltration sources and work to air seal. These could be former electrical chases, abandoned HVAC ducting, general envelope deterioration, or many other sources. 9d7b0789-3974-4869-a2a8-055391857e3c
74
f555ea01-39b7-4c4d-94ff-73ba6a6b96fdAedg k 12 exterior wall constructionEnvelope.OpaqueModelMeasureYesNRELThis measure will modify existing exterior wall insulation levels based on construction type and climate zone. The exterior wall construction type and climate zone should be set in the model prior to using this measure. For mass and metal walls if an existing insulation layer can be found it will be increased, if not a new insulation layer will be added. For mass this will be at the exterior of the construction. For metal it will be added just behind the exterior layer. For steel and wood framed walls, insulation will be added to the exterior of the construction.
75
87718175-d555-4936-b2f6-a381208341e9AEDG K12 - Exterior Door ConstructionEnvelope.OpaqueModelMeasureYesNRELThis measure is intended for use on opaque doors; if doors are glass they should be treated as windows. OpenStudio does have a unique object for overhead doors versus standard doors. This measure doesn't alter infiltration. There is a separate measure for infiltration that includes user arguments for primary entry points.
76
099f148c-7550-45ac-bbfe-0eb2bac5969fAEDG K12 - Exterior Floor Construction (Air Exposed)Envelope.OpaqueModelMeasureYesNRELThis measure will modify existing exterior floor (air exposed) insulation levels based on construction type and climate zone. The exterior floor construction type and climate zone should be set in the model prior to using this measure. For mass floors if an existing insulation layer can be found it will be increase or added at the inside of the floor. For steel and wood framed floors, insulation will be enhanced for an existing layer, or a new exterior layer will be added.
77
9165a1f8-9cd1-4492-b20b-5257c05fc5d9AEDG K12 - Interior FinishesEnvelope.OpaqueModelMeasureYesNRELThis measure will adjust the visible reflectance of materials used on interior building surfaces. Different target values will be set for floors, ceilings, and furniture/interior partition surfaces.
78
04f0c955-4885-4974-9930-13601f375d20AEDG K12 - Roof ConstructionEnvelope.OpaqueModelMeasureYesNRELThis measure will modify existing roof insulation levels and Solar Reflective Index (SRI) values based on roof type and climate zone. The roof type and climate zone should be set in the model prior to using this measure. If your model uses an attic, all attic surfaces should have an "Attic' intended surface type. For attics it doesn't matter what you put for "Standards Construction Type". The measure will check attic insulation where the attic is adjacent to other not attic spaces.
79
589fcda1-049e-44c5-82e4-804d7d9165aaAEDG K12 - SlabAndBasementEnvelope.OpaqueEnergyPlusMeasureYesNRELThis measure applies K12 AEDG 50% recommendations for slab and below grade walls. It can also be used to model and simulate ASHRAE 90.1 2004 slab and below grade wall insulation levels. Note that for many climate zones (1-5), if your model doesn't have below grade walls or heated slabs the AEDG recommendations will be the same as the ASHRAE 90.1 20004 baseline. This measure runs a multi-year simulation so it will take a few minutes to run.
80
d9dd27f7-d622-4d85-96e4-c09fcd15603cAEDG Small to Medium Office - Exterior Door ConstructionEnvelope.OpaqueModelMeasureYesNRELThis measure is intended for use on opaque doors; if doors are glass they should be treated as windows. OpenStudio does have a unique object for overhead doors versus standard doors. This measure doesn't alter infiltration. There is a separate measure for infiltration that includes user arguments for primary entry points.
81
6698017c-52bd-4fc9-9240-f480301f66b8AEDG Small to Medium Office - Exterior Floor Construction (Air Exposed)Envelope.OpaqueModelMeasureYesNRELThis measure will modify existing exterior floor (air exposed) insulation levels based on construction type and climate zone. The exterior floor construction type and climate zone should be set in the model prior to using this measure. For mass floors if an existing insulation layer can be found it will be increase or added at the inside of the floor. For steel and wood framed floors, insulation will be enhanced for an existing layer, or a new exterior layer will be added.
82
736836f8-1a55-47a6-96b7-9fd157be6744AEDG Small to Medium Office - Exterior Wall ConstructionEnvelope.OpaqueModelMeasureYesNRELThis measure will modify existing exterior wall insulation levels based on construction type and climate zone. The exterior wall construction type and climate zone should be set in the model prior to using this measure. For mass and metal walls if an existing insulation layer can be found it will be increased, if not a new insulation layer will be added. For mass this will be at the exterior of the construction. For metal it will be added just behind the exterior layer. For steel and wood framed walls, insulation will be added to the exterior of the construction.
83
d426daf2-995d-4c76-bec4-4b34e7ae2f38AEDG Small to Medium Office - Interior FinishesEnvelope.OpaqueModelMeasureYesNRELThis measure will adjust the visible reflectance of materials used on interior building surfaces. Different target values will be set for floors, ceilings, and furniture/interior partition surfaces.
84
f35d0cf1-40e4-47d1-84a4-91181a03085eAEDG Small to Medium Office - Roof ConstructionEnvelope.OpaqueModelMeasureYesNRELThis measure will modify existing roof insulation levels and Solar Reflective Index (SRI) values based on roof type and climate zone. The roof type and climate zone should be set in the model prior to using this measure. If your model uses an attic, all attic surfaces should have an "Attic' intended surface type. For attics it doesn't matter what you put for "Standards Construction Type". The measure will check attic insulation where the attic is adjacent to other not attic spaces.
85
9ef02e15-c7af-4bd3-a98a-44d52f3ea385AEDG Small to Medium Office - SlabAndBasementEnvelope.OpaqueEnergyPlusMeasureYesNRELThis measure applies Small to Medium Office AEDG 50% recommendations for slab and below grade walls. It can also be used to model and simulate ASHRAE 90.1 2004 slab and below grade wall insulation levels. Note that for many climate zones (1-3), if your model doesn't have below grade walls or heated slabs the AEDG recommendations will be the same as the ASHRAE 90.1 20004 baseline. This measure runs a multi-year simulation so it will take a few minutes to run.
86
6e68ddea-2cff-47a3-9daf-f2189e4cf132Assign ConstructionSet To BuildingEnvelope.OpaqueModelMeasureYesNRELThis will assign an existing construction set to the building object. This will impact surfaces that don't have construction sets already assigned at story, space type, space, or surfaces with hard assigned constructions.
87
cf590c23-06f1-4c87-9441-c6cb80f5d4abGet Exterior Wall Construction From BclEnvelope.OpaqueModelMeasureNorepo - NREL working measuresThis will look at the type of exterior walls used on yoru model, and will populate a choice list with those types of walls from the Building Component Library. The selected Construction will replace all exterior walls in your model.
88
3fdf9c39-d305-449b-a4b5-077166af5a67Increase Insulation R Value For Exterior WallsEnvelope.OpaqueModelMeasureNorepo - NREL working measuresSet the R-Value of exterior wall insulation to a specified value. Higher R-Values provide better insulation, lowering heat loss and heat gain through the exterior walls. Costs for a construction can be adjusted
89
7508c563-22bd-49f4-b646-aac69b02a82dIncrease Insulation R Value For Exterior Walls by PercentageEnvelope.OpaqueModelMeasureNorepo - NREL working measuresIncrease the R value of the insulation layer in roof constructinons by a percentage.
90
65b798f4-207f-4aed-987a-386c865d0ccdIncrease Insulation R Value For RoofsEnvelope.OpaqueModelMeasureNorepo - NREL working measuresSet the R-Value of roof insulation to a specified value. Higher R-Values provide better insulation, lowering heat loss and heat gain through the roof.
91
807d3ebf-c89b-4b93-b400-110ca060b2bbIncrease Insulation R Value For Roofs by PercentageEnvelope.OpaqueModelMeasureNorepo - NREL working measuresIncrease the R value of the insulation layer in roof constructinons by a percentage.
92
c879adc8-df16-41e3-abaf-785ae2e69e1fMake Components From ConstructionsEnvelope.OpaqueModelMeasureNorepo - NREL working measuresThis will make a component out of the user selected construction object.
93
c30a490e-4ff6-4fe9-88ae-a949421a287dProcess Constructions CrawlspaceEnvelope.OpaqueModelMeasureNorepo - OpenStudio BeoptThis measure creates constructions for the crawlspace ceiling, walls, floor, and rim joists.
94
d3ae8875-36bc-4e4f-a5a9-c9d0dcd46651Process Constructions Exterior Insulated Walls Double Wood StudEnvelope.OpaqueModelMeasureNorepo - OpenStudio BeoptThis measure creates double wood stud constructions for the exterior walls adjacent to the living space.
95
76193c5c-d1a6-4a57-864a-c8a32e67adcbProcess Constructions Exterior Insulated Walls Wood StudEnvelope.OpaqueModelMeasureNorepo - OpenStudio BeoptThis measure creates wood stud constructions for the exterior walls adjacent to the living space.
96
ffe06b80-3296-436e-98b2-fe79b4c936deProcess Constructions Exterior Uninsulated WallsEnvelope.OpaqueModelMeasureNorepo - OpenStudio BeoptThis measure creates uninsulated, unfinished, stud and air constructions for the exterior walls of the attic and garage.
97
4b37c726-d6c4-473b-990a-0923c302ed36Process Constructions Finished BasementEnvelope.OpaqueModelMeasureNorepo - OpenStudio BeoptThis measure creates constructions for the finished basement walls, floor, and rim joists.
98
bd1dcb8e-0d18-4ef0-8a52-cbef02ae9f4aProcess Constructions Garage RoofEnvelope.OpaqueModelMeasureNorepo - OpenStudio BeoptThis measure creates uninsulated, unfinished, stud and air constructions for the garage roof.
99
3da62049-50f9-4ed0-b05a-6b89a202482dProcess Constructions Garage SlabEnvelope.OpaqueModelMeasureNorepo - OpenStudio BeoptThis measure creates slab constructions for the garage floor.
100
6349eb9b-6e7e-4ba9-b518-76d2f9f73c79Process Constructions Insulated RoofEnvelope.OpaqueModelMeasureNorepo - OpenStudio BeoptThis measure creates finished constructions for the roof of the living space.
Loading...
 
 
 
Measures
QAQC Checks