ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
Payment Response No.: PR 02
2
For Payment Claim No.: PC 02
3
For the Period From: 04 JAN 2025 to 18 JAN 2025
4
Name of Sub-Contractor: Raa-One Construction & Engineering Pte Ltd
5
Project Name: Retrofit the existing FCU @ MBS
6
Sub-Contract Reference No.: RAA/2024/0101 Quotation Signed
7
Scope of Works: Supply labour to Retrofit the existing FCU
8
Work location: MBS
9
S.No.DescriptionUnitGroup & FCU number Unit Price
(S$)
Previous QtyPrevious amountCurrent Month Qty Current Month Amount Total qty Total Claim
10
1Retrofit the existing FCU, including removal of false ceiling,
installation of new EC Motor Fan Coil Unit, etc complete
reinstatement work.
EC Fan Motor
1) Replace of existing AC blower with new ebm-papst EC fan
complete with G.I steel bracket.
2) Replace all existing screws with stainless steel screws Grade
304.
Cooling Coil
1) Solvent clean /mechanically de-rust the corroded coil frames
and coil header.
2) Solvent clean /mechanically de-rust the corroded condensate
drain tray, and apply anti-corrosion treatment on the metal
surfaces.
3) Clean the coil with fresh water and comb all the fins straight.
CHW Line, CDP Line & Stainer
1) Recondition of chilled water supply pipe, return pipe and bypass
pipe.
2) Replace PU foam and GI jacketing of chilled water pipe if it is
corroded or having condensation issue.
3) Clean the stainer and replace the connecting pipes.
4) Replace Armaflex on the chilled water pipes, valves, stainer
NoGroup 9

Fcu-3-68
Fcu-3-69
Fcu-3-121
Fcu-3-122
SGD 2,300.00 14SGD 32,200.004 SGD 9,200.00 24.00 SGD 55,200.00
11
12
NoGroup 10
Fcu-3-60
Fcu-3-70
Fcu-3-139
Fcu-3-140
Fcu-3-141️
Fcu-3-142
6 SGD 13,800.00
13
14
TotalSGD 32,200.00 10 SGD 23,000.00SGD 55,200.00
15
16
17
Submitted By : HOSSAIN SADDAM Approved By :
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100