Indicative Rates for Selected Basic Resources for Construction Works
(Based on Prevailing Market Prices as at April 2023)
2
SNDescriptionUnit Rate
(MUR)
3
1Labour
4
Skilled labourer/day 1,500 - 2,000
5
Semi-skilled labourer/day 1,000 - 1,500
6
Unskilled labourer/day 800 - 1,200
7
2Coarse aggregate (Macadam)
8
Macadam 4-6 mm (1/4")/ton 650
9
Macadam 6-10 mm (3/8")/ton 650
10
Macadam 10-14 mm (1/2")/ton 735
11
Macadam 14-20 mm (3/4")/ton 735
12
3Fine aggregate (Rocksand)
13
Unwashed Rocksand (0-4 mm)/ton 815
14
Washed Rocksand (0-2 mm) Crépi/ton 1,020
15
Washed Rocksand (0-4 mm) Béton/ton 935
16
4Cement
17
Ordinary Portland cement - 25kg (incl. VAT)/bag 160 - 175
18
5Ready-Mixed Concrete
19
Supply , Pumped & place Concrete Grade 20/25/30/35/m3 6,460 - 6,600
20
Supply, pumpled & place Concrete Grade 15(blinding/mass filling)/m3 6,420 - 6,500
21
6Reinforcement
22
R6 - 5.5m/bar 61
23
T8 - 9.0m/bar 150
24
T10 - 9.0m/bar 235
25
T12- 9.0m/bar 340
26
T16 - 9.0m/bar 600
27
T20 - 9.0m/bar 955
28
T25 - 9.0m/bar 1,485
29
T32 - 9.0m/bar 2,505
30
7Blocks
31
100mm thick hollow concrete block/no. 23
32
150mm thick hollow concrete block/no. 26
33
200mm thick hollow concrete block/no. 30
34
8Filling Material
35
Stones 0 - 300 mm/ton 645
36
Stones 0 - 150 mm/ton 650
37
Stones 0 - 100 mm/ton 665
38
Stones 0 - 75 mm/ton 710
39
Hardcore < 200 mm in size/ton 645
40
Hardcore < 100 mm in size/ton 670
41
Aggregates 31.5 - 50 mm /ton 715
42
Aggregates 20 - 31.5 mm/ton 700
43
Crushed Aggregate (Crusher run) 0/20/ton 760
44
9Formwork
45
Marine Board 2400x1200x18mm/no. 2,125
46
Runners - 75x25mm/m 22
47
10Transport of Construction Materials
48
Trip not exceeding 15 km /trip 2, 500 - 3,500
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100