Residential Construction Schedule1/22/2025
5
Color
WBS Number
Task name / TitleAssigned to
Planned start date
Planned end date
Deadline
Progress (%)
Duration (hours)
Estimated hours
Time log (minutes)
StatusPriority
Task description
Cost
Actual cost
6
1ZONING4/24/20256/26/202503680000
7
1.1Land Use4/24/20256/25/2025036000OpenMedium00
8
1.2Easements, Set Backs4/27/20256/26/2025036000OpenMedium00
9
1.3Access, Street Improvements4/27/20256/26/2025036000OpenMedium00
10
1.4Utilities Available4/27/20256/26/2025036000OpenMedium00
11
2HOUSE PLANS4/29/20257/3/202503840000
12
2.1Purchase Standard Plans4/29/20256/30/2025036000OpenMedium00
13
2.2Architect Original Drawings4/30/20257/1/2025036000OpenMedium00
14
2.3Specifications5/1/20257/2/2025036000OpenMedium00
15
2.4Architect Manage Job5/4/20257/3/2025036000OpenMedium00
16
2.5Engineer-Loads & Spans5/4/20257/3/2025036000OpenMedium00
17
2.6Draftsman5/4/20257/3/2025036000OpenMedium00
18
3LOT SURVEY5/6/20257/10/202503840000
19
3.1House & Driveway5/6/20257/7/2025036000OpenMedium00
20
3.2Well Locaton5/7/20257/8/2025036000OpenMedium00
21
3.3Septic Location5/8/20257/9/2025036000OpenMedium00
22
3.4Fire Hydrant & Truck Access5/11/20257/10/2025036000OpenMedium00
23
3.5Plot Plan5/11/20257/10/2025036000OpenMedium00
24
4FINANCIAL - LOAN5/12/20257/16/202503840000
25
4.1Land Cost5/12/20257/13/2025036000OpenMedium00
26
4.2Interest on Land5/13/20257/14/2025036000OpenMedium00
27
4.3Interest on Const. Loan5/14/20257/15/2025036000OpenMedium00
28
4.4Points, Etc.5/15/20257/16/2025036000OpenMedium00
29
5SEWER & WATER HOOKUP5/18/20257/17/2025036000OpenMedium00
30
6HEALTH PERMIT5/18/20257/21/202503760000
31
6.1Fees5/18/20257/17/2025036000OpenMedium00
32
6.2Percolation Test5/19/20257/20/2025036000OpenMedium00
33
6.3Soils Engineer5/20/20257/21/2025036000OpenMedium00
34
7INSURANCE5/21/20257/22/2025036000OpenMedium00
35
8LOT CLOSING COSTS5/22/20257/23/2025036000OpenMedium00
36
9BUILDING PERMITS5/25/20257/24/202503600000
37
9.1Fees5/25/20257/24/2025036000OpenMedium00
38
9.2Inspection Schedule5/25/20257/24/2025036000OpenMedium00
39
10PRELIMINARY LIST ONLY5/26/20257/27/2025036000OpenMedium00
40
11BUILD PHASE5/27/20257/28/2025036000OpenMedium00
41
12SPECIAL & DRY IN MATERIALS5/29/20257/31/202503680000
42
12.1Rough Hardware, Misc.5/29/20257/30/2025036000OpenMedium00
43
12.2Lolly Columns6/1/20257/31/2025036000OpenMedium00
44
12.3Steel Beams6/1/20257/31/2025036000OpenMedium00
45
12.4Rough Lumber, Trusses6/1/20257/31/2025036000OpenMedium00
46
13WINDOWS/OPENINGS6/3/20258/6/202503760000
47
13.1Windows, Grills, Screens6/3/20258/4/2025036000OpenMedium00
48
13.2Exterior Doors,Screens6/4/20258/5/2025036000OpenMedium00
49
13.3Skylights and Light Tubes6/5/20258/6/2025036000OpenMedium00
50
14DEMOLITION6/8/20258/7/2025036000OpenMedium00
51
15LOT CLEARING6/8/20258/11/202503760000
52
15.1Debris Removal & Clearing6/8/20258/7/2025036000OpenMedium00
53
15.2Dump Fee6/9/20258/10/2025036000OpenMedium00
54
15.3Bury Stumps, etc.6/10/20258/11/2025036000OpenMedium00
55
16DRIVEWAY, rough6/12/20258/14/202503680000
56
16.1Grade6/12/20258/13/2025036000OpenMedium00
57
16.2Base Rock, Culverts6/15/20258/14/2025036000OpenMedium00
58
17UTILITIES6/15/20258/17/202503680000
59
17.1Temporary at startup6/15/20258/14/2025036000OpenMedium00
60
17.2Transfer to permanent6/16/20258/17/2025036000OpenMedium00
61
18WELL or PUBLIC WATER6/17/20258/18/2025036000OpenMedium00
62
19SEPTIC or PUBLIC SEWER6/18/20258/19/2025036000OpenMedium00
63
20LAYOUT HOUSE FOOTPRINT6/22/20258/21/202503600000
64
20.1Establish Finish Floor Height6/22/20258/21/2025036000OpenMedium00
65
20.2Set Back Distances6/22/20258/21/2025036000OpenMedium00
66
21DIG FOUNDATION6/22/20258/21/2025036000OpenMedium00
67
22ROCK PROBLEM6/23/20258/24/2025036000OpenMedium00
68
23PREPARE FOR FOOTINGS6/25/20258/27/202503680000
69
23.1Lay out and excavate6/25/20258/26/2025036000OpenMedium00
70
23.2Form, Rebar, Grade Pegs6/26/20258/27/2025036000OpenMedium00
71
24POUR FOOTINGS & PADS6/29/20258/28/202503600000
72
24.1Yds. of Concrete6/29/20258/28/2025036000OpenMedium00
73
25SET BRICK POINTS6/29/20258/28/2025036000OpenMedium00
74
26TERMITE TREATMENT6/30/20258/31/2025036000OpenMedium00
75
27RADON CONTROL7/1/20259/1/2025036000OpenMedium00
76
28FOUNDATION WALLS7/3/20259/8/202503840000
77
28.1Block/Course7/3/20259/3/2025036000OpenMedium00
78
28.2Piers7/6/20259/4/2025036000OpenMedium00
79
28.3Pour Wall, Yds. Of Concrete7/6/20259/4/2025036000OpenMedium00
80
28.4Lintels, Rebar7/6/20259/4/2025036000OpenMedium00
81
28.5Parging7/7/20259/7/2025036000OpenMedium00
82
28.6Cement, Sand, etc.7/8/20259/8/2025036000OpenMedium00
83
29WATERPROOF FOUNDATION.7/9/20259/9/2025036000OpenMedium00
84
30COLUMNS/BEAMS SET7/10/20259/10/2025036000OpenMedium00
85
31UNDERGROUND PLUMBING7/13/20259/11/2025036000OpenMedium00
86
32BRICK/STONE, to finish grade7/13/20259/11/2025036000OpenMedium00
87
33GARAGE DOORS7/14/20259/15/202503680000
88
33.1Openers7/14/20259/14/2025036000OpenMedium00
89
33.2Trim, Backing, Weatherstrip7/15/20259/15/2025036000OpenMedium00
90
34DRAIN TILE7/16/20259/16/2025036000OpenMedium00
91
35FIRE PLACE - INTERIOR7/20/20259/18/202503600000
92
35.1Pour Hearth7/20/20259/18/2025036000OpenMedium00
93
35.2Firebox, or Set Prefab7/20/20259/18/2025036000OpenMedium00
94
35.3Brick or Stone Facing7/20/20259/18/2025036000OpenMedium00
95
36PREPARE CONC. SLABS ETC.7/22/20259/25/202503840000
96
36.1Gravel, Wire, Poly, Grade Stakes7/22/20259/22/2025036000OpenMedium00
97
36.2Labor to Prepare for Slab7/23/20259/23/2025036000OpenMedium00
98
36.3Rebar, Wire, form boards7/24/20259/24/2025036000OpenMedium00
99
36.4
Labor-Prepare, Form other Conc.
7/27/20259/25/2025036000OpenMedium00
100
36.5
Deck & Post Hole footings, etc.
7/27/20259/25/2025036000OpenMedium00