Copy of RESIDENTIAL water calculator quarterly 2016 RDNO APPROVED
Comments
 Share
The version of the browser you are using is no longer supported. Please upgrade to a supported browser.Dismiss

 
$
%
123
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Still loading...
ABCDEFGHIJKLMNOPQRSTU
1
Plug in your Quarterly M3 usage in yellow section below,push enter or return and calculator will do the rest. ( m3 usage at top of your utility bill.)New Rate Cost/Quarter after Apr 1, 2016Old Rate Cost /Quarter After Apr 1, 2015$ Increase% increaseANNUAL (4 Quarters) $$ INCREASE (If equal M3 used each quarterQuarterly Institutional & Commercial new rates at same quarterly level of consumption $102 base & 1.58 per m3 (min meter size)M3 per QuarterOld Rate Cost /Quarter After Apr 1, 2015New Rate Cost/Quarter after Apr 1, 2016$ Increase/ Quarterly% increase$ Annual Increase
2
20102.000101.80102.000.200.20%0.80
3
Base Cost $95.00$101.80-$6.80-6.68%-27.20117.8010106.90109.903.002.81%12.00
4
Meter Replacement fee (Minimum)$7.00$0.00$7.0028.00102.00
5
Volume Cost $15.80$15.80$0.000.00%0.00133.6020117.60117.800.200.17%0.80
6
Overall Totals$117.80$117.60$0.200.17%$0.80134.3320.46118.16118.160.000.00%0.00
7
149.4030129.80125.70-4.10-3.16%-16.40
8
165.2040142.00133.60-8.40-5.92%
9
2016 rates after Apr 1 CONSUMPTION VOLUME$/m3Above m3to and including m3cu Meters per step$ Charge196.8060172.60165.20-7.40-4.29%-29.60
10
Tier A (0-10 cubic m)0.7901010$7.90228.4080203.20196.80-6.40-3.15%-25.60
11
Tier B (10-20 cubic m)0.79102010$7.90260.00100247.00244.20-2.80-1.13%-11.20
12
Tier C (20-40 cubic m)0.7920400$0.00291.60120290.80291.600.800.28%3.20
13
Tier D (40-80 cubic m)1.5840800$0.00323.20140334.60339.004.401.32%17.60
14
Tier E (80+ cubic m)2.37809999990$0.00354.80160378.40386.408.002.11%32.00
15
20$15.80386.40180422.20433.8011.602.75%46.40
16
2015 rates after April 1 CONSUMPTION VOLUME$/m3Above m3to and including m3cu Meters per step$ Charge418.00200466.00481.2015.203.26%60.80
17
Tier A (0-10 cubic m)0.51010105.10892.005001,123.001,192.2069.206.16%276.80
18
Tier B (10-20 cubic m)1.0710201010.701,682.001,000$2,218.002,377.20159.207.18%636.80
19
Tier C (20-40 cubic m)1.22204000.002,472.001,500$3,313.003,562.20249.207.52%996.80
20
Tier D (40-80 cubic m)1.53408000.008,002.005000$10,978.0011,857.20879.208.01%3,516.80
21
Tier E (80+ cubic m)2.198099999900.0023,802.0015000$32,878.0035,557.202,679.208.15%10,716.80
22
2015.8098,852.0062,500$136,903.00148,132.2011,229.208.20%44,916.80
23
Your Total Cost/M3$5.89
24
Base Cost/M3 including meter fee$5.10Consumption Cost/M3$0.79DON Q. 2016 M3 (2015 cons. levels)DON Q. 2015 M32016 Difference
25
% paid by Base FEE86.59%% paid by Consumption13.41%Q149$155.7729$128.58$27.19
26
100.0%Q228$124.1228$127.36-$3.24
27
Q344$139.9244$148.12-$8.20
28
Q440$133.6040$142.00-$8.40
29
Total161$553.41141$546.06$7.35
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Loading...
 
 
 
Sheet1
Sheet5
Sheet3
Sheet4
Sheet2