1 | Project Name | Proponent | Decision Date | Y/N | Consultant | Length | Filed | Days | Note | Location | Type | Where | Governmentg | Other | Public | Filing fee | ||||||||||||
2 | Ellershouse Wind Farm Expansion Project | Alternative Resource Energy Authority | February 2, 2017 | Approved with Conditions | Strum | 233 | 11/17/2016 | 77 | addendum | Ellershouse | Wind | Ellershouse, Nova Scotia | $17,250.40 | |||||||||||||||
3 | Asbestos Waste Disposal Facility Project | Arlington Heights C&D Limited | July 24, 2017 | Approved with Conditions | East Coast Aquatics | 136 | 3/7/2017 | 139 | Hampton | Hazardous Waste | Hampton, Nova Scotia | $17,250.40 | ||||||||||||||||
4 | Beaver Dam Mine Project | Atlantic Gold Corporation | 3/3/20 | Pending | ||||||||||||||||||||||||
5 | Feb 28, 2023 -Decision – Touquoy Gold Project Site Modifications | Touquoy Gold Project Site Modifications | Atlantic Mining Nova Scotia Inc | February 28, 2023 | Under Review | Moose River, Halifax County, Nova Scotia | ||||||||||||||||||||||
6 | May 12, 2022 -Decision – Touquoy Gold Project Site Modifications | Touquoy Gold Project Site Modifications | Atlantic Mining Nova Scotia Inc | May 12, 2022 | Under Review | Moose River, Halifax County, Nova Scotia | ||||||||||||||||||||||
7 | Spicer North Mountain Quarry Expansion Project | B. Spicer Construction Ltd. | April 28, 2020 | Approved with Conditions | ||||||||||||||||||||||||
8 | April 12, 2023 – Decision – Bear Head Energy Green Hydrogen and Ammonia Production, Storage and Loading Facility | Bear Head Energy Green Hydrogen and Ammonia Production, Storage and Loading Facility | Bear Head Energy Inc Location: Point Tupper, Richmond County, Nova Scotia Class: I Status: Approved with Conditions | April 12, 2023 | Approved with Conditions | |||||||||||||||||||||||
9 | Bear Head LNG Project | Bear Head LNG Corporation | May 15, 2015 | Approved with Conditions | SNC Lavalin | 8 sections | 4/8/2015 | 37 | resume | Point Tupper | LNG | Point Tupper, Nova Scotia | $17,250.40 | |||||||||||||||
10 | Bear Paw Pipeline Project | Bear Paw Pipeline Corporation Inc | December 22, 2016 | Approved with Conditions | Stantec | 392 | 11/2/2016 | 50 | Goldboro | LNG | Goldboro, Nova Scotia | $17,250.40 | ||||||||||||||||
11 | Birrette’s East Uniacke Quarry Expansion Project | Bio Design Earth Products Inc. | 9/13/19 | Approved with Conditions | Quarry | |||||||||||||||||||||||
12 | Black Point Quarry Project | Black Point Aggregates Inc. | April 26, 2016 | Approved with Conditions | SLR | 78 | 3/4/2015 | 419 | extension | Black Point | Quarry | Black Point, Nova Scotia | $17,250.40 | |||||||||||||||
13 | New Victoria Community Wind Power Project | Celtic Current Limited Partnership | September 20, 2016 | Approved with Conditions | McCallum | 133 | 8/5/2016 | 46 | New Victoria | Wind | New Victoria, Nova Scotia | $17,250.40 | ||||||||||||||||
14 | January 18, 2022 – Decision – Westchester Quarry Expansion | Westchester Quarry Expansion | Chapman Bros Construction Ltd | January 18, 2022 | Approved with Conditions | Rose, Cumberland County, Nova Scotia | Quarry | |||||||||||||||||||||
15 | February 13, 2023 – Decision – Chapman Bros Construction Ltd – Westchester Quarry Expansion Project | Chapman Bros Construction Ltd – Westchester Quarry Expansion Project | Chapman Bros Construction Ltd | February 13, 2023 | Approved with Conditions | Rose, Cumberland County, Nova Scotia | Quarry | |||||||||||||||||||||
16 | Chapman Brothers Westchester Quarry Expansion Project | Chapman Bros Construction Ltd. | January 18, 2022 | More, then Approved with Conditions | Quarry | |||||||||||||||||||||||
17 | Asbestos Waste Disposal Cell Project | Colchester Containers Limited | July 05, 2019 | Approved with Conditions | Englobe | 71 | 5/16/2019 | 50 | Middle Stewiacke | Hazardous Waste | Middle Stewiacke, Nova Scotia | 16 | 0 | 80 | $17,250.40 | |||||||||||||
18 | June 28, 2023 – Decision – Highway 101 Cambridge Interchange and Connector Road Project | Highway 101 Cambridge Interchange and Connector Road Project | Department of Public Works | June 28, 2023 | Approved with Conditions | Kings County, Nova Scotia | ||||||||||||||||||||||
19 | Gabarus Quarry Expansion Project | Dexter Construction Company Limited | April 22, 2020 | Approved with Conditions | Quarry | |||||||||||||||||||||||
20 | Sheet Harbour Aggregate Quarry Project | Dexter Construction Company Limited | 11/8/19 | Approved with Conditions | Quarry | |||||||||||||||||||||||
21 | Money Point Quarry Expansion Project | Dexter Construction Company Limited | April 6, 2018 | Approved with Conditions | H2OGEO | 45 | 2/15/2018 | 50 | Bay Road Valley | Quarry | Bay Road Valley, Nova Scotia | $17,250.40 | ||||||||||||||||
22 | Williamsdale Quarry Expansion Project | Dexter Construction Company Limited | November 30, 2017 | Approved with Conditions | H2OGEO | 40 | 10/11/2017 | 50 | Williamsdale | Quarry | Williamsdale, Nova Scotia | $17,250.40 | ||||||||||||||||
23 | Loch Katrine Quarry Expansion Project | Dexter Construction Company Limited | December 22, 2016 | Approved with Conditions | H2O GEO | 38 | 11/2/2016 | 50 | Loch Katrine | Quarry | Loch Katrine, Nova Scotia | $17,250.40 | ||||||||||||||||
24 | Nictaux Quarry Expansion Project | Dexter Construction Company Limited | June 19, 2015 | Approved with Conditions | H2O GEO | 204 | 4/30/2015 | 50 | Nictaux | Quarry | Nictaux, Nova Scotia | $17,250.40 | ||||||||||||||||
25 | December 22, 2022 – Decision – Lantz Quarry Expansion Project | Lantz Quarry Expansion Project | Dexter Construction Company Limited | December 22, 2022 | Approved with Conditions | Halifax County, Nova Scotia | ||||||||||||||||||||||
26 | March 17, 2022 – Decision – Welshtown Quarry Expansion Project | Welshtown Quarry Expansion Project | Dexter Construction Company Limited | March 17, 2022 | Approved with Conditions | Shelburne County, Nova Scotia | Quarry | |||||||||||||||||||||
27 | Whycocomagh Quarry Expansion Project | Dexter Construction Company Limited | December 23, 2021 | Approved with Conditions | Quarry | |||||||||||||||||||||||
28 | July 5, 2023 – Decision – Ellershouse 3 Wind Project | Ellershouse 3 Wind Project | Ellershouse 3 GP Inc, Annapolis Valley First Nation and Potentia Renewables Canada Holdings LP (carrying on business as Ellershouse 3 Wind Limited Partnership) | July 5, 2023 | Approved with Conditions | Ellershouse, Hants County, Nova Scotia | Wind | |||||||||||||||||||||
29 | Envirosoil Facility – Addition of Stabilization & Solidification Technology (2016) Project | Envirosoil Limited | December 22, 2016 | Approved with Conditions | Stantec | 93 | 11/2/2016 | 50 | Bedford | Decontamination | Bedford, Nova Scotia | $17,250.40 | ||||||||||||||||
30 | Envirosoil Facility – Addition of Stabilization and Solidification Technology Project | Envirosoil Limited | September 28, 2015 | Rejected | Stantec | 76 | 5/26/2015 | 125 | addendum | Bedford | Decontamination | Bedford, Nova Scotia | $17,250.40 | |||||||||||||||
31 | Waste Oil Recycling and Water Treatment Facility | Envirosoil Limited | May 28, 2021 | Pending | Waste | |||||||||||||||||||||||
32 | January 27, 2023 – Decision – Envirosoil Limited – Waste Oil Recycling and Water Treatment Facility Project | Envirosoil Limited – Waste Oil Recycling and Water Treatment Facility Project | Envirosoil Limited | January 27, 2023 | Approved with Conditions | Dartmouth, Halifax Regional Municipality, Nova Scotia | Waste | |||||||||||||||||||||
33 | February 18, 2022 – Decision - Envirosoil Limited – Waste Oil Recycling and Water Treatment Facility Project | Envirosoil Limited – Waste Oil Recycling and Water Treatment Facility Project | Envirosoil Limited | February 18, 2022 | Approved with Conditions | Dartmouth, Halifax Regional Municipality, Nova Scotia | Waste | |||||||||||||||||||||
34 | The Envirosystems Facility: Modification to Temporarily Store and Clean Low-Level NORM Waste and Equipment, and Treat Wash-Water Project | Envirosystems Inc. | April 14, 2016 | Approved with Conditions | Stantec | 109 | 3/2/2016 | 43 | Dartmouth | Hazardous Waste | Dartmouth, Nova Scotia | $17,250.40 | ||||||||||||||||
35 | Waste Dangerous and Non-Dangerous Goods Temporary Storage Facility | Envirosystems Incorporated | 2/11/20 | More, then Approved with Conditions | Waste | |||||||||||||||||||||||
36 | February 7, 2023 – Decision – Point Tupper Green Hydrogen/Ammonia Project – Phase 1 | Point Tupper Green Hydrogen/Ammonia Project – Phase 1 | EverWind Fuels Company | February 7, 2023 | Approved with Conditions | Point Tupper, Richmond County, Nova Scotia | ||||||||||||||||||||||
37 | Liquid Asphalt Storage Facility Project | General Liquids Canada, the Municipal Group of Companies | June 22, 2020 | Approved with Conditions | ||||||||||||||||||||||||
38 | Lake Major Dam Replacement Project | Halifax Water | February 9, 2017 | Approved with Conditions | Strum | 123 | 12/16/16 | 55 | Lake Major | Dam | Lake Major, Nova Scotia | $17,250.40 | ||||||||||||||||
39 | May 4, 2023 – Decision – Higgins Mountain Wind Farm | Higgins Mountain Wind Farm | Higgins Mountain Wind Farm General Partner Inc, Sipekne’katik First Nation, Elemental Energy Renewables Inc and Stevens Wind Ltd (carrying on business as the Higgins Mountain Wind Farm Limited Partnership) | May 4, 2023 | Approved with Conditions | At or near Wentworth, Cumberland and Colchester Counties, Nova Scotia | Wind | |||||||||||||||||||||
40 | Lower Carbon Fuel: Tire Derived Fuel (TDF) System | Lafarge Canada Inc. | July 6, 2017 | Approved with Conditions | LaFarge | 34 | 3/21/2017 | 107 | Brookfield | Tire Burning | Brookfield, Nova Scotia | $17,250.40 | ||||||||||||||||
41 | Liverpool Wind Farm Project | Liverpool Wind Energy Storage Project Inc. | October 28, 2015 | Approved with Conditions | Eon | 104 | 9/8/2015 | 50 | Brooklyn | Wind | Brooklyn, Nova Scotia | $17,250.40 | ||||||||||||||||
42 | Canso Spaceport Facility Project | Maritime Launch Services Limited | June 4, 2019 | Approved with Conditions | Strum | 159 | 3/11/2019 | 85 | Canso | Rocket | Canso, Nova Scotia | 29 | 1 | 88 | $17,250.40 | |||||||||||||
43 | March 27, 2023 – Decision – Mersey River Wind Farm | Mersey River Wind Farm | Mersey River Wind Inc | March 27, 2023 | Approved with Conditions | Queens County, Nova Scotia | Wind | |||||||||||||||||||||
44 | Seabrook Quarry Expansion Project | Municipal Enterprises Limited | April 20, 2016 | Approved with Conditions | H2O GEO | 37 | 3/8/2016 | 43 | Seabrook | Quarry | Seabrook, Nova Scotia | $17,250.40 | ||||||||||||||||
45 | Irish Cove Quarry Expansion Project | Municipal Enterprises Limited | February 26, 2015 | Approved with Conditions | H2O GEO | 40 | 1/7/2015 | 50 | Irish Cove | Quarry | Irish Cove, Nova Scotia | $17,250.40 | ||||||||||||||||
46 | May 11, 2023 – Decision – Granite Village Quarry Expansion Project | Granite Village Quarry Expansion Project | Municipal Enterprises Limited | May 11, 2023 | Approved with Conditions | At or near East Port L’Hebert, Queens County, Nova Scotia | Quarry | |||||||||||||||||||||
47 | August 17, 2023 – Decision – Middle River Pit Expansion Project, Victoria County | Middle River Pit Expansion Project, Victoria County | Municipal Enterprises Ltd | August 17, 2023 | Approved with Conditions | Middle River, Victoria County, Nova Scotia | Quarry | |||||||||||||||||||||
48 | Elmsdale Business Park Phased Expansion | Municipality of East Hants | 4/22/20 | More Info | ||||||||||||||||||||||||
49 | National Gypsum Mine Extension Project | National Gypsum (Canada) Limited | April 9, 2015 | Approved with Conditions | Stantec | 158 | 2/18/2015 | 50 | Milford Station | Mining | Milford Station, Nova Scotia | $17,250.40 | ||||||||||||||||
50 | Decision – March 9, 2022 – Benjamins Mill Wind Project | March 9, 2022 – Benjamins Mill Wind Project | Natural Forces Developments Limited Partnership | March 9, 2022 | Approved with Conditions | Hants County, Nova Scotia | Wind | |||||||||||||||||||||
51 | February 13, 2023 – Decision – Westchester Wind Project | Westchester Wind Project | Natural Forces Developments Limited Partnership | February 13, 2023 | Approved with Conditions | Cumberland County, Nova Scotia | Wind | |||||||||||||||||||||
52 | Decision – April 14, 2022 – Westchester Wind Project | April 14, 2022 – Westchester Wind Project | Natural Forces Developments Limited Partnership | April 14, 2022 | Approved with Conditions | Cumberland County, Nova Scotia | Wind | |||||||||||||||||||||
53 | February 13, 2023 – Decision – Benjamins Mill Wind Project | Benjamins Mill Wind Project | Natural Forces Developments Limited Partnership | February 13, 2023 | Approved with Conditions | Hants County, Nova Scotia | Wind | |||||||||||||||||||||
54 | Replacement Effluent Treatment Facility Project | Northern Pulp Nova Scotia Corporation | Withdrawn | |||||||||||||||||||||||||
55 | July 13, 2023 – Decision – Seabrook Quarry Expansion Project, Digby County | Seabrook Quarry Expansion Project, Digby County | Nova Construction Co Ltd | July 13, 2023 | Under Review | Digby County, Nova Scotia | Quarry | |||||||||||||||||||||
56 | October 21, 2022 – Decision – Sporting Mountain Quarry Expansion Project | Sporting Mountain Quarry Expansion Project | Nova Construction Co Ltd | October 21, 2022 | Approved with Conditions | Richmond County, Nova Scotia | Quarry | |||||||||||||||||||||
57 | Brierly Brook Quarry | Nova Construction Co. Ltd | March 12, 2015 | Approved with Conditions | CRA | 74 | 1/21/2015 | 50 | Brierly Brook | Quarry | Brierly Brook, Nova Scotia | $17,250.40 | ||||||||||||||||
58 | Sporting Mountain Quarry Expansion Project | Nova Construction Co. Ltd. | August 25, 2020 | More, then Approved with Conditions | Quarry | |||||||||||||||||||||||
59 | Highway 104 Twinning Sutherlands River to Antigonish Project | Nova Scotia Department of Transportation and Infrastructure Renewal | January 29, 2019 | Approved with Conditions | CBCL | 473 | 12/6/2018 | 54 | Sutherlands River | Highway | Sutherlands River, Nova Scotia | 17 | 1 | 9 | $17,250.40 | |||||||||||||
60 | Highway 107 Burnside to Bedford Project | Nova Scotia Department of Transportation and Infrastructure Renewal | 8/7/2018 | Approved with Conditions | Dillon | 156 | 6/18/2018 | 50 | Burnside | Highway | Burnside, Nova Scotia | $17,250.40 | ||||||||||||||||
61 | Highway 101 Twinning Three Mile Plains to Falmouth Project | Nova Scotia Department of Transportation and Infrastructure Renewal | 6/27/2017 | Approved with Conditions | Stantec | 272 | May 8, 2017 | 50 | Three Mile Plains | Highway | Three Mile Plains, Nova Scotia | $17,250.40 | ||||||||||||||||
62 | Highway 101 Digby to Marshalltown Corridor Project | Nova Scotia Department of Transportation and Infrastructure Renewal | March 22, 2017 | Approved with Conditions | Stantec | 246 | 2/6/2017 | 44 | Digby | Highway | Digby, Nova Scotia | $17,250.40 | ||||||||||||||||
63 | Highway 102 Aerotech Connector Road Project | Nova Scotia Department of Transportation and Infrastructure Renewal | January 5, 2021 | Approved with Conditions | Decision | |||||||||||||||||||||||
64 | Highway 102 Aerotech Connector Road Project | Nova Scotia Department of Transportation and Infrastructure Renewal | 4/28/20 | Approved with Conditions | ||||||||||||||||||||||||
65 | Auld’s Cove Transmission Project | Nova Scotia Power Inc. | April 29, 2016 | Approved with Conditions | NS Power | 137 | 3/11/2016 | 49 | Auld's Cove | Power | Auld's Cove, Nova Scotia | $17,250.40 | ||||||||||||||||
66 | Glenholme Pit No. 4 Aggregate Extraction Project | OSCO Aggregates Limited | August 24, 2017 | Approved with Conditions | Dillon | 91 | 5/15/2017 | 101 | Glenholme | Quarry | Glenholme, Nova Scotia | $17,250.40 | ||||||||||||||||
67 | March 20, 2023 – Decision – Goose Harbour Lake Wind Farm Project | Goose Harbour Lake Wind Farm Project | PHP Wind GP Inc and PHP Wind LP Inc, carrying on business as Port Hawkesbury Paper Wind Ltd Partnership Location: Guysborough County, Nova Scotia | March 20, 2023 | Approved with Conditions | Wind | ||||||||||||||||||||||
68 | MacLellans Mountain Quarry Expansion Project | S.W. Weeks Construction Ltd. | May 17, 2019 | Approved with Conditions | McCallum | 121 | 3/28/2019 | 50 | MacLellans Brook | Quarry | MacLellans Brook, Nova Scotia | 9 | 1 | 0 | $17,250.40 | |||||||||||||
69 | Goffs Quarry Expansion Project | Scotian Materials Limited | 10/25/19 | Approved with Conditions | Quarry | |||||||||||||||||||||||
70 | January 16, 2023 – Decision – Tote Road Quarry Expansion Project | Tote Road Quarry Expansion Project | Scotian Materials Ltd | January 16, 2023 | Approved with Conditions | Head of St Margarets Bay, Halifax Regional Municipality, Nova Scotia | Quarry | |||||||||||||||||||||
71 | Hardwood Lands Community Wind Project | Scotian WindFields Inc., Scotian Wind Inc., SWEB Development Inc. and WEB Wind Energy North America Inc. | February 9, 2016 | Approved with Conditions | Strum | 145 | 12/11/2015 | 60 | addendum | Hardwood Lands | Wind | Hardwood Lands, Nova Scotia | $17,250.40 | |||||||||||||||
72 | Pyrolysis Plant Project | Sustane Chester Incorporated | August 23, 2018 | Approved with Conditions | Strum | 85 | 7/4/2018 | 50 | Sherwood | Recycle | Sherwood, Nova Scotia | $17,250.40 | ||||||||||||||||
73 | July 14, 2023 – Decision – Blair Road Pit Expansion Project | Blair Road Pit Expansion Project | The Shaw Group Limited | July 14, 2023 | Approved with Conditions | Waterville, Kings County, Nova Scotia | Quarry | |||||||||||||||||||||
74 | Harrietsfield Williamswood Wind Farm Project | Watts Wind 4 Limited Partnership | May 26, 2015 | Approved with Conditions | Eon | 103 | 4/6/2015 | 50 | Williamswood | Wind | Williamswood, Nova Scotia | $17,250.40 | ||||||||||||||||
75 | July 27, 2023 – Decision – Weavers Mountain Wind Energy Project | Weavers Mountain Wind Energy Project | WEB Weavers Mountain Wind Limited Partnership | July 27, 2023 | Approved with Conditions | West of Beaver Meadow, Pictou and Antigonish Counties, Nova Scotia | Wind | |||||||||||||||||||||
76 | May 4, 2023 – Decision – Wedgeport Wind Farm Project | Wedgeport Wind Farm Project | Wedgeport Wind Farm GP Inc, Elemental Energy Renewables Inc, Stevens Wind Ltd and Sipekne’katik First Nation, carrying on business as Wedgeport Wind Farm Limited Partnership | May 4, 2023 | Approved with Conditions | Yarmouth County, Nova Scotia | Wind | |||||||||||||||||||||
77 | Asbestos Disposal Facility | Yarmouth County Solid Waste Management Authority | November 29, 2018 | Approved with Conditions | Envirosphere | 94 | 10/10/2018 | 50 | South Ohio | Hazardous Waste | South Ohio, Nova Scotia | 17 | 0 | 0 | $17,250.40 | |||||||||||||
78 | Gillis Lake Quarry Expansion Project | Zutphen Resources Inc. | February 28, 2019 | Approved with Conditions | Quarry | |||||||||||||||||||||||
79 | Rhodena Quarry Expansion Project | Zutphen Resources Inc. | August 3, 2017 | Approved with Conditions | McCallum | 92 | 6/16/2017 | 48 | Rhodena | Quarry | Rhodena, Nova Scotia | $17,250.40 | ||||||||||||||||
80 | ||||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||||
100 |