IPWE Technical Papers - 2020
 Share
The version of the browser you are using is no longer supported. Please upgrade to a supported browser.Dismiss

View only
 
 
ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
SNTOPICAUTHORREMARKS
2
A: PAPERS TO BE PUBLISHED & RECOMMENDED FOR PRESENTATION
3
Session 1: Optimizing and improving output of track machines during traffic blocks
4
1.1A precious Commodity Deserves High Level Technical and Managerial input- J.S. Mundrey
- (President- Rail Consult India)
5
1.2Optimization of NTC and associated track machines in mechanized track laying in DFCC Project- Veer Narayan, VP/ PMC,
- Rlys and Metro, Systra India
- D. K. Singh, GGM/DFCCIL
6
1.3Increasing the Productivity of Track Machines: An Invention or Discovery?- Vijay Pandey (Dy. CE /Track II /WCR)
- Rahul Jaipuriyar (Ex. DGM /WCR)
7
1.4Design mode tamping of track using trimble gedo vorsys measuring trolley- A case study in BPQ-KZJ Section of South Central Railways- Akshay Jha, chief track engineer
- D.S.Rama Rao, Sr. Divisional Engineer/North/SC Division
- P.Devender, SSE/PWay/SW/SC
8
1.5Effect of using Longer Measuring Chord in Tamping Machine- Praveen Yadav, XEN/C/JU/NWR
9
1.6Innovation in BCM Machine to Optimise and Improving output during traffic Blocks- Pankaj Soin, Sr.Divisional Engineer/NWR-Ajmer
- M.K. Gupta, Chief Engineer/Track machines
10
1.7Proper method of correcting large alignment defect in Tangent Track Requiring multiple round of tamping- Anil Choudhary, Sr. Professor, IRICEN
11
Session 2: Accelerated construction of Doubling Projects
12
2.1Faster Execution of Doubling Works- Station Yards the Bottlenecks- VIkram Gupta, Chief Engineer/Track Procurement/SCR
- Rajiv Tanwar, Director/ Track Modernisation/ Railway Board
13
2.2Acceleration Using Modern Technologies: Light Detection and Ranging (LiDAR) & Seismic Refraction Survey- Rajneesh Saroj
- (Dy. Chief Project Manager, NHSRCL, Mumbai, CR)
14
2.3Role of detailed Plan-Profile sheets in safe and Time bound Construction of Dedicated Freight Track Corridors in Mumbai Suburban Area- Rajeev Tyagi, Anurag Rastogi
- Mumbai(South)DFCCIL
15
2.4Case study on Accelerated Construction of Danea – Ranchi Road doubling project of Dhanbad Division- Sitesh Kumar Singh, Chief Engineer/Construction\South East, East Central Railway, Patna, India
- Ashutosh Chourasia, Dy. Chief Engineer/ Construction, East Central Railway, Hazaribagh, India
16
2.5Accelerated construction by avoiding delays in doubling projects- S.K.Sinha (Ex-IRSE), Project Director, IRCON
17
2.6Accelerating commissioning of doubling projects – techniques applied, lessons learnt and way forward- Arvind Jain CRS, Central Circle, Mumbai
- Naresh Lalwani, Principal Chief Safety Officer, WR, Mumbai
18
2.7Multipronged strategy to tackle complexities in Ginigera Yard Remodelling (A Bottleneck in Doubling Projects)- NItish Kumar Ranjan (Dy. Chief Vigilance Officer/Engg./SWR)
19
Session 3: Accelerated construction of Doubling Projects
20
3.1Importance of Bridge Drawings in Speedy Execution of Doubling Projects and their Fast Track Approvals- Shrirang Kamble, Dy. CE(C)/Design/CR
- Pradeep Bansode , XEN(C)/Design/CR
21
3.2Pre-Engineered or Pre-Fabricated Building, the time saving nouveau solution to speedy building construction over Railway Projects- Mona Srivastav, Chief Engineer, N.Railway
- Kaushal Sharma, XEN/C/TKJ,N.Railway
22
3.3Innovative ways for Track Works in Yards
for Faster Commissioning of Doubling/Tripling on SC Railway
- Hemant Kumar Bhagoria, Chief Engineer/Br. Rehab./SCR
- Ch. Srinivasulu, Rtd SSE/C/PW/SCR
- J. Rajkumar, SSE/C/Works/Akola/SCR
23
3.4Faster Construction Methods in Launching of Open Web Girders on EDFC- Atul B Khare, Chief General Manager/ DFCCIL
- Sanjay Singh, Chief Bridge Engineer Systra
24
3.5Suggested measures for Accelerated Construction of Doubling Projects in Indian Railway- R. Shekhawat, Senior Professor (Projects), IRICEN, Pune
- B. N. Bhaskar, Chief Engineer/Con.-1/N. F. Railway, Maligaon
25
3.6New Mechanized construction techniques for fast paced Construction of Railway Projects- Ashutosh Rankawat, Executive Director, DFCCIL
- Sanjay Gupta, Chief General Manager, Ahmedabad DFCCIL
26
3.7Accelerated construction of Doubling Projects
A Template For Survey & Planning
- Anang Pal Malik
27
Session 4: Miscelleneous
28
4.1Why IR need high strength rails- Vipul Kumar, Chief Project Director, NR
29
4.2Independent Project Management Audit- Sudhir Kumar, Chief Commissioner of Railway safety (Retd.)
- Shashank Vaidya, Director, Gem Engineering, Mumbai
30
4.3
Analysis of performance of improved SEJ (T-6902) in the field
- Manoj Arora, CTE, Western Railway
- Vaibhav Saklecha, Divisional Engineer (South) Ratlam, Western Railway
- Kamlesh More, sse (Metallurgy) CCG, Western Railway
31
4.4Construction of hybrid pile foundations: a case study of hybrid pile foundation p3 of bridge no. 43 at Bakkal of USBRL project- Praveen Kumar, IRSE 2009, Senior Safety Officer/Engg., Safety Organisation, Northern Railway
32
4.5Deterministic Approach to Assess the Track Modulus in Shake Down State of Track Ballast- S.K. Agarwal, Prof. Birdge, IRICEN
- Md. Ubaid, ADEN, BDC, ERly
33
4.6Improving quality of AT Welding on S.C. Rly- A case study- Akshay Jha, chief track engineer
- P.V.N. Naidu, ADEN/LINES/Vijaywada
- G. Kiran Babu, Sr. Instructor/TWTC/Vijaywada
- A Karthik Roy, JE/PWay/HQ/SCR
34
4.7International Practices in Sustainable Transport Infrastructure Development- Saibaba Ankala (Chief Engineer, IR)
35
4.8Various methods of Rail Flash Butt Welding on IR and their merits & demerits for capacity enhancement works including doubling projects- I.C. Subhas, XEN/FBWP/GD/NER
- B.P. Awasthi, CPD/BW/NER
36
4.9Railway Infrastructure Investment Plan (FY 20-25)- Piyush Agarwal, AM/PLg, Railway Board
- Shailesh Kumar Mishra, ED/Plg(civil), Railway Board
- Arun Kumar Tiwari, Director/PPP(Civil),Railway Board
37
Session 5: Presentations by Trade & Industry
38
Suitable time slots may be allotted for the presentations
39
5.1Advantages of tensile fabric structures in accelerating the doubling projects
(Tensile Roofing Structures)
- Priyanka Latwal, Raja Kishore Dash
- Low and Bonar
PPT Received
40
5.2Stabilization of railway track using of geogrid and geotextile- Sonal Kulkarni, manager, Maccaferri Env Sol Pvt Ltd.,
- P.V. Rao, Sr. Vice President Rail Infra,
- Taha Masvi, Dy. Manager, Estimation, Howe Engineering Projects (India) Pvt. Ltd,
- Ratnakar R. Mahajan, Regional Technical Manager, ISEAP, Maccaferri Env Sol Pvt Ltd.
41
5.3Environment friendly construction and Waste management in Khurja – Dadri section of Dedicated Freight Corridor: A Sustainable Approach- Md. Tanveer Khan, Project Manager (Engineering), DFCCIL, Eastern Corridor, Noida.
- Ashish Kumar, Environment Manager, Tata Projects Limited (JV)
42
5.4Hexagon Railway Solutions- Ashok Sharma- Vice President, HexagonPPT Received
43
5.5Accelerate the construction of track- V. N. Singh
Director - Operation
Phooltas Transrail Limited
PPT Received
44
5.6FEM Analysis of Railway Embankment with Enhanced Load Capacity on Poor Subgrades- Arghadeep Das Gupta
- Abhineet Godayal
- Surada yadava Rao
Spar Geo InfraPvt. Ltd. India
45
5.7Internet of things
- Rakesh Chopra, Ex. Rail Board member
- Sudip Majumder, GM Digital, L&T
PPT Received
46
5.8Online monitoring of railway track health through an integrated system & network using laser and ultrasonics; design of train collision avoidance system using track vibrations- Rabindra Kumar Pradhan, Department of ECE, KMBB Engineering College, Bhubaneswar, Odisha, India
- Balaram Behera, Gangavaram Port Limited, Visakhapatnam, India
47
B: PAPERS TO BE PUBLISHED & NOT RECOMMENDED FOR PRESENTATION
48
1Optimizing and Improving Output of Ballast Cleaning Machine (BCM)- S. K Srivastava, DRM/BKN
- M. M. Upadhyaya, Sr DEN/C/BKN
49
2Fast pace deep screening of turnouts by BCM after slewing the adjacent main line and extensive use of JCB for removing obstruction- Anant Kumar, Sr.DEN/South/BRC, Vadodara Division, Western Railway
50
3A step towards improving BCM operation efficiency and the track maintenance system- Raghavendra Pratap Singh, Project Manager, National High Speed Rail Corporation
- Deepankar Choudhry, Institute Chair Professor, Department of Civil Engineering, IIT Bombay
51
4Geocell: An Emerging Technique of Soil Reinforcement in Civil Engineering Field & Faster way of soil Stabilization- Akhil Kumar Agarwal & Rajesh Kumar Garg
- (Chief Engineers/NR)
52
5A Case Study: “Balance Doubling Between Lucknow- Sultanpur-Varanasi (148Km doubling Work)” and Critical Issues Observed- Sunil Kumar (IRSE-99 Batch, Dy. Chief Engineer TP/NR)
53
6नई रेलवे लाइन एवं दोहरीकरण निर्माण परियोजनाओ को गित प्रदान करना- एन आर बैरवा, सहायक मंडल इंजनियर-जूनागढ़ (भावनगर-डिवीजन), पश्चिम रेलवे
54
7Accelerated construction of doubling project- H.S.Yadav, CAO/C-2/NFR, Guwahati
- B.N. Bhaskar, CE/C-1/NFR, Guwahati
55
8Proposal for Standardization of Tunnel Cross Section, design and Drawings in Indian Railways- Mr. Avijit Majumder, Deputy Chief Engineer /CON/Design-2/Maligaon
- Mr. Koteshwar Ponnala, Deputy Chief Engineer /CON/Design-1/Maligaon
- Mr. Manas Ranjan Mohapatro, Junior Engineer/CON/Design-1/Maligaon
56
9Accelerated construction of Doubling/Multiple Line Projects- Sri J.N.Lal Das, Retd. Principal Chief Engineer/S.E.Rly, Ex- Chief Administrative Officer/Con./E.C. Rly
57
10Influence of Non-Linear Behavior of Track Fastening System on Track Modulus- Valji Shinde, Pursuing Ph.D., Sinhgad College of Engineering, Vadgaon (Bk), Pune,
- Dr. S. S. Sarawade, Professor, Mechanical Engineering Department, M.E.S. College of Engineering, Pune, Maharashtra, India
- Prof. S. K. Agarwal, Bridge Engineering Department, IRICEN, Pune, Maharashtra, India
58
11Convergence of MGNREGS with Railways and thereby Utilizing for Permanent way Activities- Pratham Agarwal
- (Assistant Executive Engineer, Construction, CR)
59
12Slope Erosion Control and Protection System adopted in Eastern DFCCIL Project for Railway Formation for speedy Construction- Atul B Khare, Chief General Manager/ DFCCIL
60
13Optimising use of traffic blocks with integrated approach and block management system- P Srinivas, Divisional Railway Manager, Vijayawada
61
14Planning of Doubling Project for Accelerated Construction- C.M. Gupta, Sr. Professor/Br.2. Indian Railway Institute of Civil Engineering, Pune
62
15Use of tamping simulator for optimizing track parameters and fast progress during maintenance by track machines- Satya Prakash Mishra, Dy CE/TP/NCR
63
16Correlation Between TRC Recordings and Field Measurements – Development of Sahnewal New Morinda Section- As Dedicated Test Stretch- Rahul Singh, Joint Director Track Machines/RDSO
- R.P.Tewari, Director track Machines RDSO
64
17Excel Program for Analysis of Fixed Arches- M. P. Singh, DBS/CB-I/RDSO
- K. Pandey, ADE/CB-I/RDSO
- Dinesh Tudu, SSE/D/CB-I/RDSO
65
18Optimising and Improving Output of Track Machines By Group Working Of Machines In N.F.Railway- Shri S P Deshmukh, CE/TMC/NFR
- Shri J P Singh, CE/Works/NFR (Ex Sr. DEN/C/RNY)
- Shri Gurjit Singh, Dy CE/TMC/NFR (Retd.)
66
19Online monitoring of railway track health through an integrated system & network using laser and ultrasonics; design of train collision avoidance system using track vibrations- Rabindra Kumar Pradhan, Department of ECE, KMBB Engineering College, Bhubaneswar, Odisha, India
- Balaram Behera, Gangavaram Port Limited, Visakhapatnam, India
67
20Experience over the Planning, Design and Execution of the Rohtak Meham Hansi new Line Project in Engineering Procurement and Construction (EPC) mode.- Mona Srivastava
68
21Improving output of Through tamping and TTR works for raising of sectional speed- B.N.S.Chalam, Chief Project Manager, Chennai Division, Southern Railway
69
22Steel sheet pile as a protective wall in urban & other projects of Railway- D.K.Mishra, DyCE/C/Ghatkopar, C.R.
- G.S. Yadav, Professor Bridge, IRICEN
70
23Applying En Standards To The Design Of 1-In-12 Turnout (60kg, With Curved Thick-Web Switch: RDSO/T-6154), To Permit 160 Km/H On Straight Track And 50 Km/H On Divergent Track, With Reliability- S. Gopalakrishnan, Retd. Additional Member Works (Ex. Director/IRICEN & Ex. Technical Adviser, Gamuda Engineering Sdn Bhd, Malaysia)
71
C: PAPERS NOT SELECTED
72
1Modification in size of Screens and Analysis of standard ballast being screened out during Deep Screening by BCM Machine- Pankaj Soin, DyCE. TMC.II
- M.K. Gupta, Chief Engineer/Track machines
Due to Duplication
73
2Factors influencing on optimising & improving output of track machines during traffic block- T.V. Mahaganapathy, Vice Principal/ SRCETC/TBM
74
3Deep screening of points and crossings in electrified territory by an innovative approach using road cranes and excavators- Akshay Jha, chief track engineer
- D.S.Rama Rao, Sr. Divisional Engineer/North/SC Division
- P.Devender, SSE/PWay/SW/SC
75
4Accelerated construction of doubling projects- Ravi,
- Dy.CE/SD/HQ/NWR
76
5Accelerated Construction of Doubling Project by mechanised track laying with New Track Construction Machines adopted in Dedicated Freight Corridor- M.S.Hashmi, IRSE, Group General Manager/Western Corridor-I, DFCCIL
77
6The Making of the Elevated Track Project at Rohtak Brief History and Methodology of Construction of the Elevated Track at Rohtak-Author not mentioned
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...