A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Note that these changes apply specifically to Filastruder kits/parts, and may or may not apply to kits/parts from other providers | |||||||||||||||||||||||
2 | ||||||||||||||||||||||||
3 | Description | Pros | Cons | Status | ||||||||||||||||||||
4 | Add toothed washer for grounding connection | Better grounding | None | Done, started shipping to customers October 2019 | ||||||||||||||||||||
5 | Add nut driver to all kits | Happier customers | Costs money | Done, started shipping to customers October 2019 | ||||||||||||||||||||
6 | Have LDO Motors customize the stepper motor wiring instead of PR3D, saves $35 | Saves time and money | Z-axis cables will have some excess length on ZL | Done, started shipping to customers October 2019 | ||||||||||||||||||||
7 | Add 2-3 cable mounts to the kit, to support the excess wire length from LDO Motors doing the stepper motor wiring | Tidies up wiring | Minor cost | Done, started shipping to customers October 2019 | ||||||||||||||||||||
8 | Add holes in bottom panel of all kits to support frame stiffening mod as seen here: https://www.thingiverse.com/thing:3577760 | Allows frame stiffener mod to be installed without customer drilling | Minimal additional machining time | Done, started shipping to customers October 2019 | ||||||||||||||||||||
9 | Alternate PSU option - Currently, 80w is needed (40w heater + 6x5w steppers + 10w Duet/PanelDue/Fans) - LRS-200-24, 200w PSU | Saves $8, is passive so less fan noise, can support 4 hotends, retains same mounting points as existing PSU | None | Done, started shipping to customers December 2019 | ||||||||||||||||||||
10 | Change from https://www.monoprice.com/product?p_id=5285 to https://www.arrow.com/en/products/17502/volex | Saves $2.50 | None | Done, started shipping to customers January 2020 | ||||||||||||||||||||
11 | Include parts for bottom frame stiffening mod (10x 10mm Cap Head M3 Screw, 10xM3 washer, 10 nylock M3 nut, 2x 425mm 1515 Misumi extrusion) | Stiffer printer | Small cost increase | Done, started shipping to customers March 2020 | ||||||||||||||||||||
12 | Change to multi jet fusion James Tongue fan duct, remove kit fan duct | Considerably better part cooling | Small cost increase | Done, started shipping to customers March 2020 | ||||||||||||||||||||
13 | Add Duet3 and Raspberry Pi mounting holes to right side panel | Allows for Duet3 usage | Small cost increase | Done, started shipping to customers March 2020 | ||||||||||||||||||||
14 | LDO rails - added as an option in place of Zyltech | All LDO rails have passed Steve's test so far - better quality than Zyltech | None | Done, started shipping to customers March 2020 | ||||||||||||||||||||
15 | Add grommet for the right side panel pass-through hole into e-box | Better cable management | None | Done in kits shipped May 12th 2020 and later | ||||||||||||||||||||
16 | Add lockwashers for linear rail mounting | Prevents M3x8 BHCS from bottoming out against extrusion profile | Minor cost | Done in kits shipped May 12th 2020 and later | ||||||||||||||||||||
17 | Change nozzle in the v6 Gold option to be a NozzleX nozzle | Better PLA printing | Minor cost | Done in kits shipped June 2020 and later | ||||||||||||||||||||
18 | Change to hooded/insulated mains terminals | Safer | Minor cost | Done in kits shipped June 2020 and later | ||||||||||||||||||||
19 | Added small vial of BN paste to all Railcore kits containing Slice Engineering hotends | Fewer sad pandas | Minor cost | Done in kits shipped June 10 2020 and later | ||||||||||||||||||||
20 | Side panels textured on both sides | Nicer appearance | Minor cost | Done in parts shipping September 15 2020 and later | ||||||||||||||||||||
21 | Side panels offered in black and white | More aesthetic options | None | Done in parts shipping September 15 2020 and later | ||||||||||||||||||||
22 | Railcore II 300ZL/ZLT logo moved to top of front panel | Doesn't collect debris in the bottom | None | Done in parts shipping September 15 2020 and later | ||||||||||||||||||||
23 | Wiring harness done by a professional ISO9001 facility, and are RoHS/REACH compliant. Wiring is 300v rated, and UL Recognized. | Safer, better labels (heatshrink labels) | None | Done in parts shipping September 15 2020 and later | ||||||||||||||||||||
24 | BLTouch cable extended by 500mm to 1500mm | Easier wire routing | None | Done in parts shipping September 15 2020 and later | ||||||||||||||||||||
25 | Changing to a dual fused, filtered power inlet. Previous models only had the “hot” fused, which can result in an unfused hot internationally or if building wiring is incorrect | Safer | None | Done in parts shipping September 15 2020 and later | ||||||||||||||||||||
26 | Changed fan to Delta BFB0524HH | Higher quality fan | Minor cost | Done in parts shipping September 15 2020 and later | ||||||||||||||||||||
27 | Adding heatshrink to microswitch soldered connections | Safer | None | Done in parts shipping September 15 2020 and later | ||||||||||||||||||||
28 | Change grounding scheme to 5x Wago instead of tripling ring terminals | Safer | None | Done in parts shipping September 15 2020 and later | ||||||||||||||||||||
29 | Bed heaters include 150C thermal cutoff | Safer | Limited to 150C | Done in parts shipping September 15 2020 and later | ||||||||||||||||||||
30 | Change kit to use SHCS, high grade steel wherever possible | Stronger fasteners, less prone to stripping | None | Done in parts shipping September 15 2020 and later | ||||||||||||||||||||
31 | Change SSR mounting to use nuts instead of just threading into HDPE | Safer | None | Done in parts shipping September 15 2020 and later | ||||||||||||||||||||
32 | Lengthened bed mounting screws to 25mm | Easier assembly, safer | None | Done in parts shipping September 15 2020 and later | ||||||||||||||||||||
33 | Offering E3Dv6 Ultimate Edition | Titanium heatbreak, NozzleX | None | Done in parts shipping September 15 2020 and later | ||||||||||||||||||||
34 | Change to T8x4 LDO leadscrews (from T8x2 Zyltech) | Better print quality | Minor cost | Done in parts shipping September 15 2020 and later | ||||||||||||||||||||
35 | Change to 0.9deg stepper motors for Z-axis | Better print quality | None | Done in parts shipping September 15 2020 and later | ||||||||||||||||||||
36 | Add M3x10 thumbscrews for attaching e-box cover | Less hassle | Minor cost | Done in kits shipping October 20 2020 and later | ||||||||||||||||||||
37 | Changed from Misumi frame extrusions to LDO | LDO can do tapping and anodization | None | Done in kits shipping May 2021 and later | ||||||||||||||||||||
38 | Changed from Misumi SELB13-395 linear rails to SSELB13-395 | Stainless steel instead of carbon steel. SELB13-395 no longer produced. | Cost (~$20/rail) | Done in kits shipping May 2021 and later | ||||||||||||||||||||
39 | Changed power inlet to Schaffner FN282-10-06 | Better quality | Cost (~$10/ea) | Done in kits shipping January 2022 and later | ||||||||||||||||||||
40 | ||||||||||||||||||||||||
41 | ||||||||||||||||||||||||
42 | ||||||||||||||||||||||||
43 | ||||||||||||||||||||||||
44 | ||||||||||||||||||||||||
45 | ||||||||||||||||||||||||
46 | ||||||||||||||||||||||||
47 | ||||||||||||||||||||||||
48 | ||||||||||||||||||||||||
49 | ||||||||||||||||||||||||
50 | ||||||||||||||||||||||||
51 | ||||||||||||||||||||||||
52 | ||||||||||||||||||||||||
53 | ||||||||||||||||||||||||
54 | ||||||||||||||||||||||||
55 | ||||||||||||||||||||||||
56 | ||||||||||||||||||||||||
57 | ||||||||||||||||||||||||
58 | ||||||||||||||||||||||||
59 | ||||||||||||||||||||||||
60 | ||||||||||||||||||||||||
61 | ||||||||||||||||||||||||
62 | ||||||||||||||||||||||||
63 | ||||||||||||||||||||||||
64 | ||||||||||||||||||||||||
65 | ||||||||||||||||||||||||
66 | ||||||||||||||||||||||||
67 | ||||||||||||||||||||||||
68 | ||||||||||||||||||||||||
69 | ||||||||||||||||||||||||
70 | ||||||||||||||||||||||||
71 | ||||||||||||||||||||||||
72 | ||||||||||||||||||||||||
73 | ||||||||||||||||||||||||
74 | ||||||||||||||||||||||||
75 | ||||||||||||||||||||||||
76 | ||||||||||||||||||||||||
77 | ||||||||||||||||||||||||
78 | ||||||||||||||||||||||||
79 | ||||||||||||||||||||||||
80 | ||||||||||||||||||||||||
81 | ||||||||||||||||||||||||
82 | ||||||||||||||||||||||||
83 | ||||||||||||||||||||||||
84 | ||||||||||||||||||||||||
85 | ||||||||||||||||||||||||
86 | ||||||||||||||||||||||||
87 | ||||||||||||||||||||||||
88 | ||||||||||||||||||||||||
89 | ||||||||||||||||||||||||
90 | ||||||||||||||||||||||||
91 | ||||||||||||||||||||||||
92 | ||||||||||||||||||||||||
93 | ||||||||||||||||||||||||
94 | ||||||||||||||||||||||||
95 | ||||||||||||||||||||||||
96 | ||||||||||||||||||||||||
97 | ||||||||||||||||||||||||
98 | ||||||||||||||||||||||||
99 | ||||||||||||||||||||||||
100 |