CHECK LIST FOR QUALITY
2
3
ACTIVITY: PLUMBING (SWR Drainage)
Soil, waste & Rainwater
4
Date:
5
Location:
6
7
Sl. No. ITEMYESNONARemarks/ Clarifications
8
1Name,date and number of the drawing
9
PRE-EXECUTION CHECKS
10
2Has it been ensured that only rubber lubricant is used for joining SWR pipes & fittings?
11
3Has provision been made for expansion joints, air vents and proper anchorage for laying of big pipelines?
12
4Has heavy-duty solvent cement used for large diameter and higher class pipes (6 kg / cm2 and above)?
13
CHECKS DURING EXECUTION
14
5Has a gap of 10 mm between all UV stabilized SWR pipes and fittings kept to accommodate thermal expansion and contraction of pipes?
15
6Have the horizontal lines within bathrooms cement encased?
16
7Has it been ensured that cutting pipes are cut square and chamfered at the end cut to an angle of 15 degree with a medium file?
17
8Has rubber lubricant smeared evenly on the chamfered spigot and the sealing ring,also allow 10 mm for expansion gap?
18
POST-EXECUTION CHECKS
19
9Has the misalignment of vertical SWR pipe stacks and incorrect spacing of pipe clips avoided?
20
10Has the entry to main stacks protected with water seal trap, wherever there is mixing of soil & waste lines?
21
11Has smoke test been avoided and test plug / socket plug been used for testing the lines?
22
12Has it been ensured that tubes installed underground, laid on floors or in other inaccessible places are able to withstand twice the maximum working pressure?
23
Checked by:
Approved by:
24
SignSign
25
NameName
26
DateDate
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100